© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Shoper 9 Implementation in Chain Store March 2010.

Slides:



Advertisements
Similar presentations
© Tally Solutions Pvt. Ltd. All Rights Reserved Shoper 9 License Management December 09.
Advertisements

© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Cataloguing Sales Promotions in Shoper 9 HO August 2010.
© 2006 Cisco Systems, Inc. All rights reserved. CUDN v Determining Customer Requirements Cisco Unity Design ProcessPresales.
Software Quality Assurance Plan
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Price Revision Enhancements in Shoper 9 August 2010.
Upgrading the Oracle Applications: Going Beyond the Technical Upgrade Atlanta OAUG March 19, 1999 Robert Cooney.
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Item Master Creation in Shoper 9 January 2010.
Roadmap for Sourcing Decision Review Board (DRB)
Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
Requirements Specification and Management
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Shoper 9 POS Secondary Database Usage March 2010.
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Shoper 7.2 Interface with Tally.ERP 9 January 2010.
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Shoper 9 POS Single Store Implementation October 2009.
Scoping Assessment Eduardo Melo Engagement Manager Proseware, Inc. Contoso, Ltd Microsoft Dynamics CRM Solution.
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Barcode in Shoper 9 December 2009.
© Tally Solutions Pvt. Ltd. All Rights Reserved Customisation of Shoper 9 October 2009.
ITIL: Service Transition
Accelerate BI Presented by: Stephen Goldsmith RapidApp BI Methodology  Agile Project Management, Quality Assurance, Knowledge Transfer  Plan Business.
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Shoper 9 Tally.ERP 9 Interface Troubleshooting January 2010.
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Shoper 9 Tally.ERP 9 Interface January 2010.
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Data Synchronisation in Shoper 9 January 2010.
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Stock Audit in Shoper 9 February 2010.
Tech Indira IT Solutions Pvt Ltd
Software Test Plan Why do you need a test plan? –Provides a road map –Provides a feasibility check of: Resources/Cost Schedule Goal What is a test plan?
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Cataloguing Sales Promotions in Shoper 9 POS August 2010.
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Cataloguing Sales Tax in Shoper 9 March 2010.
Project Life Cycle Introduction and Overview © Ed Green Penn State University All Rights Reserved.
Release & Deployment ITIL Version 3
Siebel CRM On Demand – MHC Network Express Integrated Solution.
Business systems are computer-based information systems that provide organizations with valuable information in a timely and effective manner to allow.
N A managed approach to planning and controlling the implementation of complex application software. n A flexible tool kit, designed to support the Project.
Effective Methods for Software and Systems Integration
Web Development Process Description
S/W Project Management
Commercial Database Applications Testing. Test Plan Testing Strategy Testing Planning Testing Design (covered in other modules) Unit Testing (covered.
1 Building and Maintaining Information Systems. 2 Opening Case: Yahoo! Store Allows small businesses to create their own online store – No programming.
ERP E NTERPRISE R ESOURCE P LANNING Every Monday, 13:30 – 16:00 Last Updated: 31 March 2009ERP – Ir. H. Noor Hidayat, MMT.1.
Technology from Microsoft David Overton Head of Technology for Small Business
© Tally Solutions Pvt. Ltd. All Rights Reserved Tally.ERP 9 – Auditors’ Edition.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
- 1 - Roadmap to Re-aligning the Customer Master with Oracle's TCA Northern California OAUG March 7, 2005.
Pass SOX security audits and Improve XA security CISTECH Security Solutions Belinda Daub, Senior Consultant Technical Services
© Tally Solutions Pvt. Ltd. All Rights Reserved Shoper 9 LiveUpdate March 2010.
End HomeWelcome! The Software Development Process.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
1 10/14/2015ã 2007, Spencer Rugaber The Waterfall Process Software plans and requirements Validation System feasibility Validation Product design Verification.
1 Activities covered by project management Feasibility study Is project technically feasible and worthwhile from a business point of view? Planning Only.
Fundamentals of Information Systems, Third Edition1 Systems Design Answers the question “How will the information system do what it must do to solve a.
@2002 Copyright, Itreya Technologies CMMI kick off July 2005.
© Tally Solutions Pvt. Ltd. All Rights Reserved Tally.ERP 9 – Auditors’ Edition.
Project management Topic 1 Project management principles.
Workforce Scheduling Release 5.0 for Windows Implementation Overview OWS Development Team.
IBM Maintenance and Technical Support © Copyright IBM Corporation 2007Phil Giddings Feb-09 MAPS Tool ( Maintenance At Product Sale) Education Presentation.
Software Test Plan Why do you need a test plan? –Provides a road map –Provides a feasibility check of: Resources/Cost Schedule Goal What is a test plan?
ICAJ/PAB - Improving Compliance with International Standards on Auditing Planning an audit of financial statements 19 July 2014.
Project Management Methodology Project Closing. Project closing stage Must be performed for all projects, successfully completed or shut off by management.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
Microsoft Dynamics Sure Step Rana Abdul Rahman. What we will cover What is Sure Step? Benefits of Sure Step methodology Project phases as per sure step.
Getting Ready for the NOCTI test April 30, Study checklist #1 Analyze Programming Problems and Flowchart Solutions Study Checklist.
1 DEPLOYMENT AND OPERATIONS MODULE 23 ECM SPECIALIST COURSE 1 Copyright AIIM.
Presenter: Igna Visser Date: Wednesday, 18 March 2015
Principles of Information Systems Eighth Edition
ITIL: Service Transition
EOB Methodology Overview
Description of Revision
Engineering Processes
{Project Name} Organizational Chart, Roles and Responsibilities
Technology Maintenance
Presentation transcript:

© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Shoper 9 Implementation in Chain Store March 2010

© Tally Solutions Pvt. Ltd. All Rights Reserved 2 Objectives  Chain Store Scenario  Phases of Implementation  Best Practices

© Tally Solutions Pvt. Ltd. All Rights Reserved 3 Chain Store Scenario  Stores: o present in many locations o centrally controlled o follow common business processes and practices  Components: o POS (Store) locations o Distributor/warehouse o Head Office

© Tally Solutions Pvt. Ltd. All Rights Reserved 4 Chain Store Scenario  Classification: o Company Owned o Franchisee o Consignment Stores o Buy & Sell Stores  Others: o constitutes a supply chain network o communicate between locations o exchange goods between locations o data managed centrally at head office o head office is a facilitator and decision maker

© Tally Solutions Pvt. Ltd. All Rights Reserved 5 Phases of Implementation  Presales o Standard Product Demo  Understanding Customer Requirements o Design and Construct solution o Customisation (if required)  Conference Room Pilot (CRP)  Pilot Run at Chosen Locations o User Acceptance Testing

© Tally Solutions Pvt. Ltd. All Rights Reserved 6 Phases of Implementation  Implementation Rollout in All Locations  End User Training o Help and Support  Post Implementation Activities o Support for a limited period o Implementation Closure o Further Support Services and Maintenance

© Tally Solutions Pvt. Ltd. All Rights Reserved 7 Presales A set of activities performed before customer acquisition and may extend during the process of product/service delivery. Activities include:  Meet prospects to gather requirements  Seek information on their business related activities  Find what they expect from Shoper 9  Provide information on: o our company capability o past implementation and service record o Shoper 9 interface with Tally.ERP 9  Shoper 9 integration with other applications  Provide commercials on Shoper 9 deployment  Arrange for a standard product demo

© Tally Solutions Pvt. Ltd. All Rights Reserved 8 Standard Product Demo  The standard product demo focuses on: o important product features o broad requirements of the prospect o use of prospect’s data to map requirements with features  Post demo estimate the effort required to complete implementation based on the scope of activities. Effort estimation enables you to ascertain the project period and cost. Refer the Implementation Effort Estimate Tool for effort estimation. Note: The standard effort estimate is based on the previous implementation experience and may vary depending on prospect’s requirements and other factors.

© Tally Solutions Pvt. Ltd. All Rights Reserved 9 Understanding Customer Requirements Important activities in this phase are:  Collect detailed requirements about current business operations  Use Requirement Study and Configuration Tool to map requirements with system parameter settings  Study item master structure, inwards/outwards process, reports, hardware/software required  Decide on broad areas to be customised, if required, after mapping with the standard product  Prepare the Business Solution Design Document and get an approval from the customer (signoff)

© Tally Solutions Pvt. Ltd. All Rights Reserved 10 Understanding Customer Requirements  Document in Business Solution Design Document (BDS): o existing business processes o recommendations for process changes (if any) o mapping of customer requirements with product features to ascertain: ▪ availability of standard features ▪ solutions through customisation ▪ workaround solutions  In solution phase (keeping BSD as base): o prepare customer specific business and printing templates o customise interface with other applications (if any) o prepare Custom Installer and Custom LiveUpdate

© Tally Solutions Pvt. Ltd. All Rights Reserved 11 Conference Room Pilot  Install Shoper 9 components, demonstrate its functionalities, check interfaces with other applications and work on the complete business process  Obtain feedback on the performance of the product and new requirement of customer, if any  Validate the designed solution against the business process, requirements and ascertain the gaps  Obtain a sign off from the customer on CRP done and incorporate the changes in the designed solution, if required

© Tally Solutions Pvt. Ltd. All Rights Reserved 12 Pilot Run at Chosen Locations  Install Shoper 9 components in customer HO and selected locations.  Refer the Implementation & Training Checklist for Rollout document for the list of activities to be carried out.  The test cases received on the business scenarios of the customer have to be tested completely during this phase.  Issues found during pilot run have to be addressed before rollout and necessary changes have to be done in the applicable areas.  Obtain a sign off from customer.

© Tally Solutions Pvt. Ltd. All Rights Reserved 13 Implementation Rollout in All Locations  Plan for rollout of Shoper 9 after successful pilot run  Prepare a checklist of prerequisites for rollout and ensure the prerequisites are ready  Keep the Shoper 9 Custom Installer ready for deployment in the locations (Refer to Shoper 9 Customised Installer. PDF)  Obtain a sign off from the customer after implementation/migration during the rollout phase (Refer to Implementation and Training Checklist for Rollout)

© Tally Solutions Pvt. Ltd. All Rights Reserved 14 Implementation Rollout in All Locations Prerequisites for rollout Sl.NoPrerequisite for rollout ToolResponsibility 1Shoper 9Shoper 9 CDCustomer 2Customer Specific Business Template Shoper 9 Custom CD Implementation Executive 3Customised ExesShoper 9 Custom CD Implementation Executive 4Custom LiveUpdateCustom LiveUpdate location & patches Implementation Executive 5Hardware & Software readiness for rollout locations H/w & S/w Readiness Checklist Customer

© Tally Solutions Pvt. Ltd. All Rights Reserved 15 End User Training  Provide training to customer personnel at HO & POS locations (Refer to Implementation and Training Checklist for Rollout) Help & Support  Impress the users on the options used in the chain store scenario Educate customers on: o Help file in Shoper 9 HO & POS o Knowledge Base on Tally website o Tally.ERP 9 Support Centre o Licence Management using Control Centre o Partner’s role as a support person

© Tally Solutions Pvt. Ltd. All Rights Reserved 16 Post Implementation Activities  Support for a limited period o Extend support for a limited period (7 days) o Monitor product performance during the period o Guide the client to use and familiarise with Shoper 9 options  Implementation Closure o Get a sign off on successful completion of the project (Refer Project Sign off Document)  Further Support Services & Maintenance o Work out an annual maintenance contract for continuous product support

© Tally Solutions Pvt. Ltd. All Rights Reserved 17 Best Practices The best practices that are recommended for a successful implementation:  Demonstrate the standard functionalities of Shoper 9  Use Implementation Effort Estimation Tool to calculate implementation effort  Understand customer’s business process and the requirements (Ref: Requirement Study and Configuration Tool)  Document requirements, provide solution and get a sign off (Ref: Business Solution Design Document)  Perform a Conference Room Pilot and a Pilot Run of Shoper 9 at selected locations before roll out

© Tally Solutions Pvt. Ltd. All Rights Reserved 18 Best Practices  Prepare a plan and execute rollout at locations after a successful Pilot Run  Use the implementation and training checklist to impart training to customer personnel  Plan for a limited period post implementation support and work out an Annual Maintenance Contract (AMC)  Ensure the customer signs off that the project has been successfully implemented (Refer Project Sign off Document)

© Tally Solutions Pvt. Ltd. All Rights Reserved 19 Questions & Answers For more information log in to:

© Tally Solutions Pvt. Ltd. All Rights Reserved 20 Thank You