Focus Coil Update Roy Preece / Tom Bradshaw / Mike Courthold STFC – RAL VC 17 th Jan 2013.

Slides:



Advertisements
Similar presentations
Spectrometer Solenoid Update Steve Virostek - LBNL MICE VC 150 August 23, 2012.
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Magnet Cooldown Scheme 17 th February 2012 Roy Preece (STFC RAL)
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
SS and AFC Control Systems Brian Martlew 21 st Sept 2011.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 27, 2009.
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
Acceptance Criteria for the Decay Solenoid Tom Bradshaw Mike Courthold Matthew Hills.
Spectrometer Solenoid Update Steve Virostek - LBNL MICE Video Conference #129 February 25, 2010.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting #26 University of California.
Test plan for the MICE SS cryostat and magnet Tapio Niinikoski LBNL Spectrometer Solenoid Workshop May 10, 2011.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Spectrometer Solenoids and Coupling Coils Primary Activities and Risks Going Forward Spectrometer Solenoids Completion of SS#2 magnetic mapping Completion,
Electrical Electricity Fuses Relays Solenoids Electrical Testing
Overview of the 1.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
MICE - UK Project Progress Roy Preece 30 th April 2013.
MICE Decay Solenoid Quench Detector Trevor Hartnett Daresbury Laboratory.
Settings & Adjustments. Settings & Adjustments.
Magnet quench during a training run Successfully trained to peak currents and operationally tested Thermal performance requirements met 3D magnetic bore.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
1 W.Ootani ICEPP, University of Tokyo MEG experiment review meeting Feb , PSI W.Ootani ICEPP, University of Tokyo MEG experiment review meeting.
Instrumentation and Controls Test Plan Review 17 th February 2012 Roy Preece (STFC RAL)
Electrical & Control Power Supplies Trevor Hartnett.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Test and Review chapter State the differences between archive and back-up data. Answer: Archive data is a copy of data which is no longer in regular.
Spectrometer Solenoids MICO 214 Steve Virostek LBNL February 6, 2013.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Spectrometer solenoid 2. Magnetic shielding 3. Next Collaboration meeting.
Spectrometer Solenoids MICO 197 Steve Virostek LBNL August 15, 2012.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
1 Mice Collaboration Meeting CM28 Bankya Palace Spa Hotel, Sofia, Bulgaria 3 rd -8 th Oct 2010 Daresbury Laboratory Spectrometer Report Authors : Ian Mullacrane.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
SPOKESMAN’S UPDATE K. Long Imperial College London/STFC.
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab MICE Video Conference 120 May 7, 2009.
1 Mice Collaboration Meeting CM27 STFC Rutherford Appleton Laboratory, UK 7 th -10 th July 2010 Daresbury Laboratory Electrical Infrastructure Report Authors.
Spectrometer Solenoids MICO 194 Steve Virostek LBNL July 25, 2012.
FC Status MPB 1/20 April 2014 OXFORDRALDARESBURY V. BlackmoreV. BaylissT. Hartnett J. CobbT. BradshawS. Griffiths W. LauM. CourtholdI. Mullacrane R. PreeceA.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
A Gallagher Oct 2015 Electrical Integration MPB October 2015.
STEVE HAYS AD E/E SUPPORT E4R POWER SYSTEM for HTS MAGNET WIRE TEST.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
2015 Operations Stay Treat CHL2 4K Cold Box Modifications SC1 2K Cold Box CC4 Failure Helium and LN2 Losses Contamination Operations Stay Treat.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
MICE CC TEST, IN PROGRESS M. Tartaglia For the FNAL/LBNL Test Team 9/27/13.
FC Status CM39 1/20 June 2014 OXFORDRALDARESBURY V. BlackmoreV. BaylissT. Hartnett J. CobbT. BradshawS. Griffiths W. LauM. CourtholdI. Mullacrane R. PreeceA.
MICE Spectrometer Solenoids Step IV running. MICE Spectrometer Solenoids Remember: Both magnets met the full specification at the vendor and were fully.
MICE Spectrometer Solenoids Step IV running
S A Griffiths CM42 June 2015 Electrical & Control.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Electrical Configuration and System Protection
MICE Absorber and Focus Coil Magnet – Test Results
University of Colorado – Boulder
11T Magnet Test Plan Guram Chlachidze
Spectrometer Solenoid Update
Run period of summer 2012 Zoltán Fodor
Focus Coil Quench Detector
Cryogenics – The Basics
Presentation transcript:

Focus Coil Update Roy Preece / Tom Bradshaw / Mike Courthold STFC – RAL VC 17 th Jan 2013

Since last meeting Gas input from bottle pack – 1.05 bar Level sensor operating but not able to communicate with the control system. System cooling over the Christmas period By the New year the level was reported as being 100%. Pressure feedback heater systems operating with a regulation of bar. Level reduced to 80% using the pressure regulation heaters and the exhaust poppet valve. Pressure regulated at 1.14 bar with a gas bottle backup set to 1.05 bar. Good news : Easily demonstrated zero boil off conditions Good news : Control system and monitoring works well

Review and Issues Over the holiday period there were issues surrounding the remote monitoring of the system This was complicated by the loss of air conditioning in a room somewhere …. – this took down several of the PPD computers Other software issues concerned versions of the software running on different computers Although the data was archived it was not always accessible through the archiver. Where are the computers that we are using located ? What networks are they on? Who is responsible for this kit ? Over the holiday period it was difficult to resolve these issues

Review and Issues A pre powering review was held on the 8 th Jan. – Risk and method statements nominally agreed (some amendments) – Pressure relief mainly reliant on the bursting disc. Relief valve with higher flow rate added to the system. – Ready to go forward with final preparations and powering. Issues – Current lead heaters not working Found to have very high resistance to new installed. ON / OFF reporting on control screen sorted. – Connection to ground found on voltage tap Problem rectified and full connectivity check carried out.

Review and Issues Powering of the coils started on 11 th Jan – Quench detection system tripping due to “Step function” from the power supply controller, AMI 430. – Maximum current output set to 5A and QD system taken out of the control loop. – Current of 5A in the coils but, voltage spikes evident while the controller is trying to control the current. 0.14T seen at the centre of the magnet bore. – The cause of the “Step function” is unknown so AMI are contacted for assistance. – Testing operations were stopped at this point and the magnet was left in a safe but cold state.

Review and Issues DL engineers on site at RAL working on the controller problem today. (More up to date information in the meeting) – Earthing of the controller checked as per AMI suggestion with no change. – Further investigations into addition earth loops – Change the controller for a spare unit to ascertain if the same issue is seen. – Blah Blah Blah Blah………. – None of this was needed because the problem was found to be the instructions from AMI are incorrect and at the wrong end of the scale. 95% stability setting required NOT 20%.

Plans Ramp the magnet to 5A checking the voltage and QD operation Ramp to 50A and hold. – Take thermal measurements to check the thermal model – Take magnetic field measurements to check the field analysis Induce a quench in the magnet – This will check all QD, dump circuitry, logging etc – Full pressure system checks Attach the gas bottle pack to the input – Re-cool the system – Condense He into cooling channels LHe delivery week of 21 st Jan (next week) – Refill and stabilise – Continue testing to full current in Solenoid mode – 114A – Thermal and magnetic measurements – Re-configure for Flip mode – Power to full current, with stage points, to 225A