MT Continuum Status 25 February 2015 Presented by Mark Campbell, LMSSC Gerry Cullison, SSP.

Slides:



Advertisements
Similar presentations
Authoring Instructional Materials (AIM)
Advertisements

Making the System Operational
9/24/2013 Overview of Enhanced ELM Functions. What is it? The ELM system leverages the Districts existing technology and training expertise to improve.
MT Continuum Status 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr Mike Lueken, LM SS for SSP Wendy Pester, CSF for SSP Joe Farbo, LSI Jamie Stewart, AIM team.
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2008 Implementing AIM at Your Activity – A General.
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Jake Aplanalp, AIM Pgm Mgr 23 Aug 11.
Demonstrations AIM II CTTL Import to CPM for pre-JDTA
Authoring Instructional Materials (AIM)
AIM User Training Status 24 August 2011 Tiffany Dombrowski, AIM Pgm Mgr Dave Donnelly, CSFE, AIM User Training CCMM Yvette Bartholomew, CPPD, CD Course.
AIM CPM/LOM Tom Bonnano N74 21 August 2014.
Mr. Mike Mosley Learning Standards Branch Head 04 Feb 2014
Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.
AIM Toolset Interfaces with Authoritative Technical Data
Authoring Instructional Materials (AIM)
Yvan Rooseleer – BiASC – MAY 2013
AIM FRB Briefing NAVSEA 07TR3 Sandra Wiegmann Submarine Training Systems Division NAVSEA 07TR3 4 Nov 2008.
MT Continuum Status 4 February 2014 Gerry Cullison, SSP Peter St Jacques, MT Continuum Team System Integrator.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 LCDR Brewster, NAVMAC Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD 18.
MT Continuum Status 21 August 2014 Presented by Bryan Miller, LMSSC Gerry Cullison, SSP Peter St Jacques, NUWC MTC Lead System Integrator.
MT Continuum Status Feb 11 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI Jamie Stewart, AIM team.
1 AIM User Training 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Dave Donnelly, CSFE, AIM Course CCMM Yvette Bartholomew, CPPD, Curr Dvlp Course.
Authoring Instructional Materials (AIM)- Interactive Electronic Technical Manual (IETM) Interface December 2008.
AIM Background & Current Capabilities Brief to FRB Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando November,
AIM Program Software Status
Software Capabilities Status Software Capabilities Status Danette Likens and Mike Coyle AIM Team 19 September 2012.
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2009.
Configuration Management
NETC N6 Status Update on AIM in the NETC Enterprise Architecture 23 Aug 11 Bruce Bare, NETC, N62 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
Modernized AIM Functional Requirements 6 November 2009 Ron Zinnato, NAWCTSD, AIM Lead S/W Eng Jamie Stewart, AIM Team.
NETC N72 Status Update to AIM FRB NETC N72 Status Update to AIM FRB John Wishall 23 April
New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 George Vogel, NAVMAC 00C Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD.
Lee Rogers, Instructional Designer Presentation Date: July 30, 2012 Client Organization: ABC English School Project Management Plan For ABC English School.
Effective Methods for Software and Systems Integration
DEFENCE LEARNING NETWORK PROJECT DLN Overview and Demonstration UMCC HR Sub-committee 6 December 2012 Susan Nutbrown DLTPD/DGWD DLN Project Leader (Civilian)
Instructional System Design
ADDIE Instructional Design Model
FRB NAVEDTRA 136 Business Process Refinement FRB NAVEDTRA 136 Business Process Refinement Roy Hoyt, NETC N74 Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD Jamie.
RUP Fundamentals - Instructor Notes
Page 1 MODEL TEST in the small GENERALIZE PROGRAM PROCESS allocated maintenance changes management documents initial requirement project infrastructure.
Supporting A-level Geography Students Online …at Kingston College 2004/5 LSDA Q Project.
AIM Team Software Status AIM Team Software Status Mike Matzko AIM Team 20 August 2014.
MT Continuum Status 3 Apr 12 Tiffany Dombrowski, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, MT Continuum Team Jamie Stewart, AIM team.
Digital Learning Resources (e-Content) Development Process Senthil Kumar 14th November 2011.
1 ISA&D7‏/8‏/ ISA&D7‏/8‏/2013 Systems Development Life Cycle Phases and Activities in the SDLC Variations of the SDLC models.
MT Continuum Status 4-6 May 2010 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI.
Module 7 Session 7.3 Visual 1 Module 7 Planning and Scheduling with the Critical Path Method Session 7.3 The computer and project management.
Using Blackboard for blended learning Delivering the Geography curriculum at Kingston College This talk will give an overview of the assessment features.
SOW Update SOW Update Mike Matzko AIM Team 21 August 2014.
Overview September Agenda Overview of AIM Introduction to AIM Team AIM in the Navy Education and Training Command (NETC) Enterprise.
Software Development Cycle What is Software? Instructions (computer programs) that when executed provide desired function and performance Data structures.
AIM User Training IPT Status Feb 11 Roy Hoyt, NETC N74 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Yvette Bartholomew, CPPD, CD Trng CCMM Dave Donnelly,
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr Feb 11.
NETC N7 Update to AIM FRB NETC N7 Update to AIM FRB Mike Mosley, NETC N74 23 April
By: Catherine Mendoza. Evaluate Implement Develop Analyze Design.
AIM Toolset Interfaces with Authoritative Technical Data 4 April 2012 Jim Ferrall, AIM Team.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
AIM FRB Briefing Strategic Systems Programs (SSP) Briefer: Jamie Swaim Billet: Personnel Program Coordinator Learning Center: SLC Date: 11/04/08.
Center for Personal and Professional Development Harrison-Youngs/ Bartholomew ISD CPPD 4 November 2008.
Nodal Education Initial Staff Concepts 11/30/05. Agenda Integrated Approach Roadmap and Processes Curriculum Development ERCOT Education Advisory Council.
JDTA Item and Learning Object Versioning – Proposed Approach JDTA Item and Learning Object Versioning – Proposed Approach Jamie Stewart, Steve Wicinski,
Software Project Management
AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD.
AIM FRB Briefing Mike Clifford LSO Kings Bay Submarine Learning Center November 2008.
Chapter 6 CASE Tools Software Engineering Chapter 6-- CASE TOOLS
In-Process and Potential Future Software Capabilities Status In-Process and Potential Future Software Capabilities Status Danette Likens and Jamie Stewart.
Yanling Sun, Ph.D. Senior Instructional Coordinator Technology Training and Integration ADDIE: A Guide for Designing Online Courses Summer Symposium for.
Linking Blended Learning to Navy Fleet Performance Requirements, REAL-TIME Jake Aplanalp Naval Air Warfare Center, Training Systems Division.
AIM Program Software Status FRB/CCB Meeting 24 February 2016.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Presentation transcript:

MT Continuum Status 25 February 2015 Presented by Mark Campbell, LMSSC Gerry Cullison, SSP

Topics MT Continuum (MTC) Overview Project Status MTC Components MTC Integration Tasks Learning Community Applicability Lessons Learned

Background Strategic Systems Programs (SSP) re-engineering Missile Technicians (MT’s) 30+ week training pipeline: – Blended just-enough/just-in-time ILE-conformant content – Instructor Led (ILT) and Interactive Multimedia Instruction (IMI) sections – Delivered, tracked, and assessed through LMS – Training via both afloat and ashore LMS instances AIM CPM and LO Module toolsets are part of SSP’s baseline business process for this re-engineering First major end-to-end design, development, and maintenance project that’s defining CPM/LO Module business rules and data exchange mechanisms

MT Continuum Team SSP - Requirements Owners, Afloat Training Capability LMSSC – Lead Material Preparing Activity Contractor Team – ILT development, IMI Storyboard development, SMEs NAWCTSD / AIM team - CPM/LO Module support NUWC – MTC Lead System Integrator, LMS (Seaware) LSI, Inc. – ISD and IMI design/development; integration tool development Chenega Logistics, LLC – CM/QA agent for SSP Applied Physics Lab (APL)/JHU – VIPr PC sim developer SLC –CCA for all MT curriculum Fleet – SME’s/Management of training afloat

Project Status Plan, Analyze & Design Phases Completed – Delivery Method Analysis Process still needed – Scientific/Justifiable/Repeatable Development fully underway. Development effort is progressing on schedule – Assessment, Performance Testing (NAVEDTRA 132) Large emphases on Implementation, Evaluation and Maintenance – Versioning, LMS interface Ongoing integration of CPM/LO Module, IMI toolset, PC simulation toolset, and LMS for planning, analysis, design, development, implementation, evaluation, and maintenance of blended content

MT Continuum Technical & Schedule Integration MTC development spans from the JDTA’s to the delivery and maintenance of training and test assessment material to students afloat and ashore MTC Lead System Integrator (NUWC) – Coordinates technical and schedule activities between and among developers, relative to the training and assessment delivery and maintenance goals of the MTC

MT Continuum Components Plan/Analyze – CPM (JDTA/TPP/TCCD) Design – CPM (COI) – LO Module (final design of ILT/preliminary design of IMI) Develop – LO Module (complete for ILT and test items) – Venus.net IMI toolset (complete for IMI and assessment Sections) – VIPr (PC simulation scenarios for ILT and IMI) – Content Packaging Tool (CPT) (provides SCORM-conformant sequencing and navigation within the MT Continuum lessons, which consists of AIM-based blended training content)

Packaging & Delivery of MTC Content Content Packaging Tool (CPT) Training Content Packaging: The CPT packages approved IMI and ILT (except VIPr scenarios) for delivery by the LMS, and sends corresponding Source and Surveillance Packages to AIM for subsequent maintenance and updating Venus (AIM SCORM Export) IMI design & test items ILT AIM Final IMI & assessment items AIM LMS /CCS CPT Runtime Package (includes VIPr launch files) VIPr Scenarios CPT Source Package CPT Surveillance Package

Training Content Maintenance & Updating Mode: Venus is used to modify IMI stored in AIM in the CPT Source and Runtime packages. The CPT generates updated source, runtime, and surveillance packages and then stores these modified packages back in AIM. Venus AIM Version 1 CPT Runtime Package Maintenance & Updating of MTC Content AIM (AIM SCORM Export) Version 2 ILT Content Packaging Tool (CPT) Version 2 Final IMI & assessment items Version 2 CPT Source Package Version 2 CPT Surveillance Package Version 1 CPT Source Package Version 2 IMM or test items Version 2 CPT Runtime Package

MT Continuum Components (contd) Implement – Toolset that supports ashore and afloat delivery Seaware (Learning Management System) Venus (IMI and assessment development and maintenance tool) EPS (Ashore Delivery) ATSS (Afloat Delivery) Elite (Classroom Control Software) – Interface with existing systems Schoolhouse Management PERS Fleet Scheduling

MT Continuum Components (contd) Evaluate – ILT/IMI/knowledge assessment delivery and tracking – Performance Assessment delivery and tracking (Lab and virtual environments) Maintain – Content Packaging Tool (CPT) – LO Module/Venus.net (integrated surveillance/update of ILT/IMI/test items)

MT Continuum Integration Tasks LMS Interfaces – Interface specification with LO Module and VIPr (JHU APL) – NUWC Newport lead with inputs from PPC (Chenega Logistics), ISD/IMI developer (LSI), LMPA (Lockheed Martin) and AIM team (AIMEREON) Content Packaging Tool (CPT) – Delivered by LSI with support from NUWC Newport Seaware LMS team, PPC, and AIM team (AIMEREON) Classroom Control Software (CCS) ⁻ Adapting Elite CCS in use for many years by SSP and rest of submarine training community to support LO Module-based ILT delivery

Learning Community Applicability Focuses on a Continuum Model of Learning ~ supported by ashore/afloat delivery – Reduces frontload of ILT ‘C’ School – Delivers ‘ready now’ sailors sooner to fleet. – Delivers sustained career training – grows with the sailor – Supports manager level training at both the E6 and CPO level Closely coordinated with NAVEDTRA 136 development – Repeatable and sustainable model Coordinated with AIM by design to ensure short and efficient maintenance cycles.

Learning Community Applicability (contd) Truly Blended Experience for the Learner – Leverages efficient and instructionally sound delivery methods that include: – Classroom (ILT) – Self Paced (IMI) – Virtual/Simulation (VIPr) – Hands On (ILT – LAB) – Facilitated /Peer to Peer (Manager Level)

Learning Community Applicability (contd) Systems Engineered Approach ~ NAVEDTRA/SCORM Compliant – LO Module and IMI toolset for integrated IMI / assessment development / maintenance – Development of ILT and IMI test items and output to IMI toolset for aggregation into LMS-delivered Lesson-level assessments Sections, including enhanced performance test item development – LMS delivery and tracking of integrated ILT / IMI / assessment content – Integrated surveillance and maintenance environment for blended (ILT/IMI/test item) SCORM NAVEDTRA 136-compliant learning content

Learning Community Applicability (contd) Role of MT Continuum to ‘Big Navy’ future training – Training 2020 study group following MTC as one of two major prototypes under new Fleet Forces Command team leadership OPNAV Fleet Forces Command

Questions?