Joint Legal/Participation Ad-Hoc 21 March 2012 Report.

Slides:



Advertisements
Similar presentations
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to CoU V1a, 20 Jan 2012 Doc: Source: ETSI Agenda.
Advertisements

4.1 [0] Criteria for Successful Consolidation ATIS Delegation Presenter: Gale Lightfoot (Cisco Systems) Meeting of Potential M2M Consolidation Partners.
Status summary of the ad-hoc discussions 13th of July 2012 oneM2M call.
April 19, 20003GPP2 report 3GPP2 Steering Committee TSG-A report DRAFT Seoul, Korea April 19, 2000.
- 0 /9- TTA Views on Criteria for Successful M2M Consolidation August 17~18, 2011 (Washington DC, ATIS Building) TTA M2MCons02_15 (Agenda 4.1)
Doc.: IEEE /324r0 Submission May 2001 Bruce Kraemer, IntersilSlide 1 PARTNERSHIP PROJECT DESCRIPTION During the meeting held in Copenhagen, 2.
1 [4.1]a Criteria for successful consolidation SDOThreshold/Foundation/Launch After/During Formation, Near-Term Comment Summary of discussions Verticals.
App-ID Ad-Hoc Technical Issues TP AppID R02 Group Name: App-ID Ad-Hoc Group Source: Darold Hemphill, iconectiv,
OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All Consolidated M2M standards boost the industry Li Li (Thomas) CCSA(Huawei) Document No: GSC16-PLEN-73.
GSC: Standardization Advancing Global Communications 1 Summary of issues and results from GSC-11 IPR WG Dan Bart, TIA Chair IPR WG SOURCE:Dan Bart, IPR.
OSIAM4HE Proposed org structure Authored by the strategy and organization team.
M2M Global Initiative OneM2M April 24, 2012
CHARTER OF PPP TASK FORCE & PPP SECRETARIAT. Charter – Organization of TF TextReason Name : Viet Nam PPP Task Force for Sustainable Agriculture - Do we.
Summary of GSC-15 IPR WG Meeting Alan Fan Zhiyong IPR WG Chair DOCUMENT #:GSC15-CL-05 FOR:Presentation SOURCE:Alan Fan Zhiyong, IPR WG Chairperson AGENDA.
DOCUMENT #:GSC15-CL-04 FOR:Presentation SOURCE:CCSA AGENDA ITEM:Closing Plenary, 2.3 GTSC-8 Summary Report Duo Liu GTSC-8.
M2M Consolidation August 17-18, 2011 Washington D.C. 1 ARIB/TTC’s Feedback on Consolidation Issues M2MCons02_06.
Date Coordinator Name(s) Other Leadership Name(s) ABC Coalition Clean Cities Re-designation.
Report of Methods and Procedures Subcommittee Group Name: Steering Committee Source: Laurent Laporte, Sprint, Meeting Date:
GSC-19 Meeting, July 2015, Geneva GSC-18 Summary Report Dirk Weiler, ETSI Document No:GSC-19_002 Source:GSC-18 Chair Contact:Dirk Weiler Agenda Item:1.4.
South East Europe Transnational Cooperation Programme Bologna, 15° June 2009 Kick-off meeting of project SARMa SEE Joint Technical Secretariat.
Summary of main questions on the Partnership Agreement and the secretariat support End of day 1.
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
Partnering initiatives to stop TB at country level Inclusive platform for all partners interested and working for TB prevention, care, control Different.
Overview of the 11 th CJK IT Standards Meeting (CJK-11) ARIB, TTC 1 M2M Meeting of Potential Consolidation Partners # March 2012 in Tokyo, Japan.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 05 Mar 2012 Doc: Source: ETSI.
December_2009 Partnership building. December_2009 Partnership building within the partnering process COREGROUPCOREGROUP FORMAL LAUNCH $ $ $ $ $ cost centre.
MoW&M&P Report Group Name: TP19 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
eSciDoc Community Model Draft eSciDoc Community Model Overview 1.Introduction 2.Requirements on the Community Model 3.Organizational.
CJK9, Zhangjiajie, China 1/14 Discussion: [Drafted] 3GPPs works in CJK Cooperation CJK 9, Zhangjiajie, China April 8-10,2009 Changho RYOO
WG5 - MAS Progress Report at TP #9 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
Vertical Outreach Program Create story (presentation) – Identify the needs/challenges (beyond telecom- centric viewpoint) – What we are trying to do –
Report of the oneM2M Legal Subcommittee Group Name: oneM2M Steering Committee Source: Thomas Goode, ATIS, Meeting Date:
Timeline for the oneM2M Partnership Project Timeline and Milestones [Steve Barclay, ATIS] [Joachim Koss, ETSI] Contribution to oneM2M-Cons#4, 28 Mar 2012.
3GPP2 Publication Process Training TSG-S PMT. December Presentation Overview Background OP Input and Intent Publication Process Overview The Revised.
- 1 - TTA View of Budget & Secretariat Functions March 28~29, 2012 (Tokyo, Japan) TTA.
1 [4.7]a Structure of M2M Consolidation SDOStructureComment Overall Goals of Structure: Be responsive to the needs of the vertical market stakeholders.
SCFAH Title: Draft Baseline Ad-Hoc Recommendation to SC on 3GPP2 Future ver2 Source: J. Brownley, Ad-Hoc Chair Abstract: This is a proposed.
1 May 30, 2007 U.S. – China Symposium on Active Industry Participation in Standardization Overview of U.S. Participation in ISO and IEC.
Summary of main questions on the Partnership Agreement and the secretariat support.
1 Summary of issues and results from GSC-12 IPR WG Dan Bart, TIA Chair IPR WG SOURCE:Dan Bart, IPR WG Chair TITLE:Report of GSC-12 IPR WG AGENDA ITEM:Closing.
WMM in Confidence oneM2M Ecosystem Accelerator (OEA) Presentation to oneM2M TP meeting Beijing, November 2015 Paul Russell.
Participation Ad-Hoc Legal Ad-Hoc Joint status. General General good progresses made on the document’s structure The two ad-hocs are meeting jointly One.
OneM2M Partnership Project. Contents Introduction Founding Partners Participation Scope & Objectives Structure Deliverables Contacts © 2013 oneM2M Partners.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 14 Mar 2012 Doc: Source: [ETSI]
ProjectIEEE Working Group on Mobile Broadband Wireless Access TitleLiaison relationships with external organizations.
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
SCFAH r2 Title: “Ad-Hoc Recommendation to SC on 3GPP2 Future” – Working Draft Source: 3GPP2 Future Ad Hoc Abstract: This is the draft baseline.
Status summary of the ad-hoc discussions 29th of June 2012 oneM2M call.
GSC IMT Task Force Report Kohei SATOH ARIB DOCUMENT #:GSC13-PLEN-64r1 FOR:Presentation SOURCE:Kohei Satoh (ARIB) AGENDA ITEM:GRSC (7); Plenary (6.1) CONTACT(S):Kohei.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
MoW Report Group Name: TP20 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
31 January Table of Contents (1) 3- Draft Partnership Project Description22- The Partnership Project Agreement (1)3- Draft Partnership Project Description22-
1 30 November GPP2 SC Subject:Recommendations for 3GPP2-BBF Working Relationship Date: 30 November 2009 Source: Doug Knisely TSG-X FMOAHG.
GSC-16 Closing Plenary Summary Report
ATIS’ Machine-to-Machine (M2M) Activity
Consolidated M2M standards boost the industry
ATIS Open Source IoT (OS-IoT)
Overview of U.S. Participation in ISO and IEC
3GPP Status.
Presenter: Luis Jorge Romero oneM2M Steering Committee Chairman
Standards for Shared ICT
GSC-16 Closing Plenary Summary Report
Summary of GSC-15 IPR WG Meeting
Outreach and Engagement
A Global Consensus Process
Reinhard Scholl, GTSC-7 Chairman
IEEE P Motions at the July Plenary EC Meeting
ATIS’ Machine-to-Machine (M2M) Activity
Presentation transcript:

Joint Legal/Participation Ad-Hoc 21 March 2012 Report

Ad-hoc Document Priority List The combined ad-hoc has agreed to move its work product to the plenary for review and discussion (M2MCons04_02 through 07) The most relevant is Partnership agreement The level of secretariat has also reached a good stability Additionally – Some documents moved out of the ad-hoc but should not be considered the agreed upon output of the committee (Financial Aspects) – Some documents are submitted to help discussion if time permits, to deal with complex issues that have not yet been resolved (Working Procedures)

Partnership Agreement Draft agreement is now presented to the plenary for continued and sustained work to finalize for presentation to SDO Boards, Counsels and stakeholders Considered by the Ad-hoc to be the primary work product for focused effort by the plenary The draft is stable (still few things to be refined), but contains a set of important issues that has been discussed deeply but no solution has been agreed.

Unresolved Important Issues Voting in oneM2M—simple summary – Three SDOs TIA, TTA and CCSA feel that one company one vote is the fairest way to proceed, the most legally insulating to the project, and best at giving voice to smaller companies while providing the greatest likelihood for success in attracting non- telecom companies and verticals – ETSI, ARIB/TTC and ATIS support one company one vote per SDO because this may be more attractive to companies and will not diminish the important contributions of the bigger companies to oneM2M

Unresolved Important Issues What is a company respect to the voting? (e.g. how we can define that a set of entities are considered for oneM2M “ a company”) Partner Type 1 should be requested to be capable to publish Standards in the context oneM2M scope? IPR policies and technical voting for Partner Type 2 and IPR policy and technical voting for member that are associations

Secretariat Services Only one Unresolved issue is present, dealing with the Hosting support, where TIA and ETSI have a different view: – Should hosting provided by the Secretariat or – Directly by the members

Funding, Working Procedures Ad-hoc has made strides in producing good work to help the plenary discuss: – Funding of onem2m – Working procedures documents