Engineer Training Maintenance TJ8300 / TJ8500 Maintenance.

Slides:



Advertisements
Similar presentations
Training Presentation
Advertisements

Chapter 4 Air-Conditioning Components
Engineer Training XL1200 Ink System. Engineer Training XL1200 Ink System Confidential 2 Ink System The XL1200 Ink System consists of the following elements:
Engineer Training XL1200 Software Engineer Training XL1200 Software Confidential 2 Print options Archive Print queue Toolbar Preview & Information.
Engineer Training Media Feeder TJ8300 / TJ8500 Media Feeder.
DRIP DISPERSAL SYSTEMS Problems and Solutions Presented by Keith Surface.
Engineer Training XL1200 Mechanics. Engineer Training XL1200 Mechanics Confidential 2 The XL1200 is both a Roll to Roll and a Roll to Sheet Printing Machine.
Fuel System The fuel system supplies the air and fuel necessary for an engine to produce power. The fuel system includes: Air Cleaner Fuel Supply Carburetor.
THE M-9 9MM SERVICE PISTOL
Engineer Training Inkjet Head Cleaning TJ8300 / TJ8500 Inkjet Head Cleaning.
Engineer Training Rear Operation Unit TJ8300 / TJ8500 Rear Operation Unit.
4-1 Chapter 4 Overview b The DCM is very complex Mechanical, electrical, hydraulic and safety systems all work together Mechanical, electrical, hydraulic.
© Goodheart-Willcox Co., Inc. Permission granted to reproduce for educational use only Publisher The Goodheart-Willcox Co., Inc. Tinley Park, Illinois.
Engineer Training Machine Calibration TJ8300 / TJ8500 Machine Calibration.
Engineer Training TN 59 Ink Management Solution TJ8300 / TJ8500 TN 59 Ink Management Solution Machine 75 and Above.
Engineer Training Troubleshooting Theory TJ8300 / TJ8500 Troubleshooting Theory.
Suction Pumps.
Engineer Training Drum and Grippers TJ8300 / TJ8500 Drum and Grippers.
Engineer Training XL1500 Safety System. Engineer Training XL1500 Safety System Confidential 2 Standard Requirements Both the machine and the Safety System.
Paint Circulation Technology Level 1 - Training Document
WP Inc. Case STUDY 3.1 Problem Solving Jonathan Stanley & Kari Eddings
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
AIR COMPRESSORS & STEAM CLEANERS. Pressurized air is produced by an air compressor. Air compressors are used daily in automotive shops. They are used.
Hydraulics For The Long Term
Series Operational Training. 2 Water Tank Water Pump Multiple Discharges 2000 Series Line Strainer Foam Tank Electronic Direct Injection Proportioner.
1 Lesson 4 Computer Maintenance Computer Literacy BASICS: A Comprehensive Guide to IC 3, 4 th Edition Morrison / Wells.
Engineer Training XL1500 Software 5.021A. Engineer Training Confidential 2 Main Window Print options Archive Print queue Tool bar Preview & information.
Dailies, Weeklies, Monthlies, PSM Maintenance - Simplify IT If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us at:
Engineer Training Bridge System TJ8300 / TJ8500 Bridge System.
Engineer Training Startup/Shutdown Procedures TJ8300 / TJ8500 Startup/Shutdown Procedures.
Trouble shooting Before starting to work on a problem, first we have to understand the problem Once the problem is understood, we will try to “isolate”
Plan 2 – Dead-end Seal Chamber Optional Jacket
Engineer Training Motion Control TJ8300 / TJ8500 Motion Control.
Maintenance of Machine tools
Cressington 208 HR Sputter coater
Engineer Training Cooler TJ8300 / TJ8500 Cooler. Engineer Training Cooler TJ8300 / TJ8500 Confidential 2 Introduction.
Flat Saw Training. Flat Saw Sizes –Low Horsepower Blade diameters range from 8” (200mm) to 18” (450mm) Power ranges from 4 to 25 horsepower.
Engineer Training RTRun – Real Time Software TJ8300 / TJ8500 RTRun – Real Time Software.
SETA Water treatment plant maintenance
ComColor Ink passage Mechanism (Revised version)
Engineer Training Ink Insertion TJ8300 / TJ8500 Ink Insertion.
Engineer Training Checking the Motor’s Rotation Direction TJ8300 / TJ8500 Checking the Motor’s Rotation Direction.
Machinery Cooling Water System Locations and Operations.
Oil Pressure Testing.
Engine Performance BASIC MAINTENANCE AND LIGHT REPAIR.
Front loaders boasting top performance Cold milling machines W 100 F, W 120 F, W 130 F.
Auto Maintenance Equipment Division LAUNCH. CNC Series- Injector Cleaner& Tester 1.Affect of engine fuel system 2.Introduction of CNC series 3.Maintenance4.Precautions5.Troubleshooting.
Discover the Dosmatic Difference Maintaining your Dosmatic injector for years of service.
Vehicle Maintenance,daily Checks Daily checks-Tyres check for obvious faults i.e flat tyres, worn tyres,visible damage. Daily checks-Tyres check for obvious.
Testing Requirements in the Boiler House Requirements for regular testing will vary according to national regulations, and the type of equipment installed.
V V RULES OF ENGAGEMENT (ROE) UNCLASSIFIED V Corps Weapons Safety Memorandum - 14 Nov Encl. 1 - Change 11 oAlways treat a weapon as if it were loaded.
EBS-1 # COOLANT FLUID EXCHANGE QUICK REFERENCE ATTENTION: Using the Coolant Fluid Exchange requires the FILL and VAC Valves on the SERVICE.
Vertical Pump Motor Manifold Upgrade. VPMM Replaces Existing Pumps, Motors, Relief Valves, Check Valves, Discharge Filters, Pump Running Pressure Gauges,
Engine Mechanical Diagnostics 1. 2 Introduction To Diagnosis.
Automotive Heating And Air Conditioning
14 Refrigerant Recovery, Recycling, and Recharging.
R1 Fundamentals of Refrigeration
Thunderbird Water Pump Upgrade
OBJECTIVES State the principles of vacuum and the vacuum booster theory. Discuss how a vacuum brake booster operates. Discuss the vacuum booster operation.
OBJECTIVES Discuss the procedure recommended for brake drum removal.
Most Effective Procedures to Repair a Brake Booster.
The Important Aspects of Swimming Pool Maintenance
SB Packing Automatic Downpuller Power Unit
Darin Boling / CorrStream Technical Specialist
Lesson 4 Computer Maintenance
R1 Fundamentals of Refrigeration
DIALYSERS.
DIALYSERS.
Vinyl Machine.
Presentation transcript:

Engineer Training Maintenance TJ8300 / TJ8500 Maintenance

Engineer Training Maintenance TJ8300 / TJ8500 Confidential 2 General The HP Scitex TJ8300 Maintenance is divided into 3 types:  Daily Maintenance – procedures that must be performed on a daily basis  Weekly Maintenance – procedures that must be performed once a week  As Needed Maintenance – procedures that must be performed on an as-needed basis

Engineer Training Maintenance TJ8300 / TJ8500 Confidential 3 Daily Maintenance  Monitoring the ink level in the ink containers  Verifying the ink level in the primary ink tanks  Cleaning the inkjet heads  Cleaning the drum and gripper  Cleaning the bridge stepper motor cylinders

Engineer Training Maintenance TJ8300 / TJ8500 Confidential 4 Daily Maintenance (Cont.) Monitoring the ink level in the ink containers

Engineer Training Maintenance TJ8300 / TJ8500 Confidential 5 Daily Maintenance (Cont.) Verifying the ink level in the primary ink tanks  The ink level in the six primary ink tanks can be verified by visually checking the attached Ink Level Indicator located at the rear of the left side of each tank:  At the beginning of each workday, to ensure that there was no overnight leakage  Throughout the workday, during normal printer operation

Engineer Training Maintenance TJ8300 / TJ8500 Confidential 6 Daily Maintenance (Cont.) Cleaning the Inkjet heads  This procedure includes an automatic process activated by the system software and the manual cleaning of the inkjet heads.  The IJ heads should be cleaned during a workday, as follows:  Start of the workday  Between jobs  After any 30-minute break in printing operations  End of the workday

Engineer Training Maintenance TJ8300 / TJ8500 Confidential 7 Daily Maintenance (Cont.) Cleaning the drum and gripper  This procedure is essential for proper loading/unloading and is performed daily, as follows:  At the beginning of the workday  On an as-needed basis during the workday or in between jobs.

Engineer Training Maintenance TJ8300 / TJ8500 Confidential 8 Daily Maintenance (Cont.) Cleaning the bridge stepper motor cylinders  Should be performed on a daily basis in order to ensure smooth backward/forward and left/right movement of the bridge

Engineer Training Maintenance TJ8300 / TJ8500 Confidential 9 Weekly Maintenance Opening the drum vacuum holes  Once a week or when there is a problem with loading the substrates, all the drum vacuum holes must be opened to ensure proper suction of the substrate against the drum during printing. Use a 6 mm long pin

Engineer Training Maintenance TJ8300 / TJ8500 Confidential 10 Weekly Maintenance Cleaning the bridge waste manifolds  Once a week there is a need to clean the bridge waste manifolds in order to prevent them from being clogged. Bridge waste manifold

Engineer Training Maintenance TJ8300 / TJ8500 Confidential 11 As-Needed Maintenance  Cleaning the cutter  Replacing an inkjet head  Replacing an ink filter  Emptying the waste bath  Flushing the waste pump  Replacing the auto drop strip  Replacing the night cover foil

Engineer Training Maintenance TJ8300 / TJ8500 Confidential 12 As-Needed Maintenance (Cont.) Cleaning the cutter  The cutter mechanism is cleaned on an as-needed basis when it is not functioning properly, which is usually due to buildup of bits of substrate on the cutter blade (usually from vinyl).  See related T.N. #24

Engineer Training Maintenance TJ8300 / TJ8500 Confidential 13 As-Needed Maintenance (Cont.) Replacing or cleaning an inkjet head  Removing an inkjet head is performed when replacing an existing inkjet head with a new one, or when the inkjet head needs to be cleaned.  Inkjet heads are cleaned one at a time, using first the washing unit, and then with the ultrasonic system (supplied with the TJ8300), if needed.

Engineer Training Maintenance TJ8300 / TJ8500 Confidential 14 As-Needed Maintenance (Cont.) Replacing an ink filter  Pull out and remove the main filter, clean it with acetone, and return it to its place. If the ink still does not flow, replace the main filter with a new one.  See pictures A, B, C, D, E. ACB DE

Engineer Training Maintenance TJ8300 / TJ8500 Confidential 15 As-Needed Maintenance (Cont.) Emptying the waste bath  This procedure is carried out by the waste pump, which is operated by the RTRUN software.

Engineer Training Maintenance TJ8300 / TJ8500 Confidential 16 As-Needed Maintenance (Cont.) Flushing the waste pump  The waste pump must be flushed once every one to two months, in order to maintain the pump's efficiency and durability.  Flushing the waste pump circulates solvent through the pump, which cleans the pump's inner chambers.

Engineer Training Maintenance TJ8300 / TJ8500 Confidential 17 As-Needed Maintenance (Cont.) Replacing the auto drop strip  Replacement of the drum's autodrop strip is performed on an as-needed basis, which is determined by visually checking if the strip is full of ink.

Engineer Training Maintenance TJ8300 / TJ8500 Confidential 18 As-Needed Maintenance (Cont.) Replacing the night cover foil  Before replacing the night cover foil, ensure that you have an adequate amount of low-density stretch polyethylene foil (40 cm width, 20 microns thickness).