Installation.

Slides:



Advertisements
Similar presentations
Flammable and Combustible Liquid & Compressed Gas Handling and Storage
Advertisements

Next Home Visio2 troubleshooting guide Start the slide show then click Next.
East Carolina University Compressed Gas Safety Training Program
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
KURSUS PENGENALAN KEPADA PERKHIDMATAN MEKANIKAL DALAM BANGUNAN
3.4.5 Student Book © 2004 Propane Education & Research CouncilPage Maintaining Bulk Plant Pumps, Strainers and Bypass Systems Knowing how to maintain.
© the Design and Technology Association Health and Safety Training Standards in Design and Technology S8HS PLANER/THICKNESSER MACHINE Specialist Extension.
Student Book © 2004 Propane Education & Research CouncilPage Installing Steel Piping in Vapor Distribution Systems Installing steel piping.
Service Technician Training
3.1.9 Student Book © 2004 Propane Education & Research CouncilPage Replacing Valves and Fittings in ASME Tanks Replacing ASME tank valves and fittings.
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
Stanley DS11 Diamond Saw.
Installation. Indoor Unit Installation Typical Installation.
Copyright  Progressive Business Publications Blue Ridge Safety Association Safety Presentations Compressed Gasses.
Safety Gas Plus.
SAFE PROPANE TORCH USAGE
1926 Subpart J Establishes the requirements for welding and cutting in the construction industry Establishes requirements for equipment, fire protection,
Student Book © 2004 Propane Education & Research CouncilPage Installing Vapor Meters Vapor meters are precision measuring devices that.
DR-2000 Customer Benefits Security; Tamper resistant programming protects your customer and you! Low maintenance, long battery life & long squeeze tube.
Motorized Tongue Jack Owners Manual Model SAFETY WARNINGS * Read, understand and follow all instructions before installing and/or using product.
Finally, a compressed air piping system so simple…it’s EZ!
© Siemens Industry, Inc Confidential / Drive Your Business Forward Ignite the Power of New Products and Partnerships Siemens Fire Partner Summit.
BS9990 : 2015 Updates and/or Changes
2.3.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Purging Containers & Injecting Methanol Prior to.
Welding, Cutting, and Brazing
Next Home EcoCompact troubleshooting guide Start the slide show then click Next.
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
Unit 205: Cold water systems
Installation. Indoor Unit Installation Typical Installation.
AccuMax Multi-Point Injection Mechanics
2.5.6 Student Book © 2004 Propane Education & Research CouncilPage Operating a Propane Dispenser to Fill Vehicle-Mounted ASME Tanks To safely and.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
3.4.2 Student Book © 2004 Propane Education & Research CouncilPage Types and Functions of Valves and Fittings Used in Bulk Plant Containers and.
NFPA-12 Edition 2005 What “IMPACT” will the changes to NFPA-12 have on the design and installation of a CO 2 system?
Kidde Engineered Fire Suppression System 25 bar Equipment Hardware Engineered for use with 3M™ Novec™ 1230 Fire Protection Fluid.
3.7.5 Student Book © 2004 Propane Education & Research CouncilPage 1 A full understanding of the operation of the liquid evacuation process if essential.
Installation. Indoor Unit Installation Typical Installation.
CXS490 Carbon Dioxide Systems
2.5.5 Student Book © 2004 Propane Education & Research CouncilPage Coordinating Loading and Unloading of ASME Tanks Using Contractor- Operated.
Flex Cam – Training This shows one version of a complete FlexCam system including Power Unit HCP and Compact Cam CC for piercing operation.
3.4.3 Student Book © 2004 Propane Education & Research CouncilPage Bulk Plant Emergency Shutdown Equipment and Periodic Examination Methods One.
5.1.6 Student Book © 2005 Propane Education & Research CouncilPage 1 Selection of proper dispenser transfer hoses, end valves and adapters relies on a.
POWER TOOLS Electric drills
1 CXS490 - Pre-Engineered Fire Protection Systems Off-Road Vehicle Systems.
Student Book © 2004 Propane Education & Research CouncilPage Performing Gas Distribution System Leak Checks Requirements for vapor distribution.
ADS / PHX SERIES SYSTEMS ADVANCED TOPICS. F O R T H E NEM ILLE NN I U M F O R T H E NEM ILLE NN I U M Advanced ADS / PHX Topics Halon retrofits Directional.
3.7.7 Student Book © 2004 Propane Education & Research CouncilPage 1 Replacing DOT IM tank valves and fittings requires careful application of precautions.
1 HVACR316 - Piping Copper Tubing and Fittings. 2 2 Safety Refrigerant cylinders should be stored and transported in the upright position to keep the.
ADS / PHX SERIES SYSTEMS DESIGN
Launch Chameleon Plus P - More Preventive features and safety L - More Longer Lasting and robust U - More User friendly operation S - More Service friendly.
3.6.3 Student Book © 2004 Propane Education & Research CouncilPage 1 Personnel who perform tank car unloading operations must comply with company operating.
Welding, Cutting, and Brazing
Presented by John Lewandowski and Mike Larabel Inspection, Testing, and Maintenance of Kitchen Hood Systems Michigan Fire Inspectors Society Winter Educational.
VIEW SERIES with Sliding Door
Scorpion is a remote tester specifically designed for testing ASD systems. Scorpion is compatible with the FAAST aspirating smoke detector. It is particularly.
14 Refrigerant Recovery, Recycling, and Recharging.
MDX-R3 INSTALLATION PROCESS ADJUSTABLE CONCRETE POOLS
MDX-R3 INSTALLATION PROCESS NON-ADJUSTABLE CONCRETE POOLS
Personal Protective Equipment
Overfill Prevention Technology and Maintenance
East Carolina University Compressed Gas Safety Training Program
GENERALPIPINGREQUIREMENTS:. Designing and erecting an efficient piping system requires certain aspects/ requirements which could be found in our PME handbook…
Filling of SAPPHIRE 25 & 42 Bar Systems (TFPP Hardware)
Parker domnick hunter. Safety of Electrical and
Presentation transcript:

Installation

This Training Burkhard Krafft Introduction Components FM-200® Design Technical Services Manager EMEA Introduction Components FM-200® Design Install./Maint. Exam

All Installations are to be performed in accordance with: NFPA 2001 Clean Agent Fire Extinguishing System 2000 Edition All Installations are to be performed in accordance with: FM-200 Manual All appropriate codes and standards Local State Federal AHJ (Authority Having Jurisdiction)

Safety Basics All agents may be and must be considered to be hazardous at concentrations above their normal design levels and may be toxic or create dangerous oxygen levels, e.g. may be very dangerous if released into enclosed room, van or shipping container.

Safety Basics Never rush your work! Safety comes before an early finish. Think before you act.

Safety Basics Before installing any pipework from the system container(s), the container(s) must be secured to an immovable object. If this is neglected and the container accidentally discharges the container will become a dangerous projectile! If this happens there could be a serious injury or worst still someone could be killed!

Safety Basics Do not remove plugs or any part whatsoever from a valve unless you know the principle of operation. Never remove plugs from actuation ports until you are immediately ready to fit actuation components. Do not fit actuators until you have verified they are in the reset position.

Safety Basics Never move a container that is not fitted with an anti-recoil device. Never move a container that is not fitted with a valve protection device i.e. transportation cap. The container protection cap protects the valve during transit and MUST be left with the customer upon completion of the installation. Always use a container trolley to avoid possibility of a container falling over or a lifting injury.

Safety Basics Never use undue force to remove transport caps, anti-recoil devices or valve plugs. Never move a container unless an anti-recoil device and transport cap is fitted. Make sure the containers are well secured in the vehicle for transport.  DANGER !

Safety Basics  DANGER ! Video

General System Design Modularised approach easier system design Note: A maximum of 9 slave cylinders are allowed to be released by one master cylinder. easier system design often most economic solution

General System Design Manifolded system Note: A maximum of 9 slave cylinders are allowed to be released by one master cylinder. if containers are positioned remote from the hazard multi-hazard-system with distribution valves higher costs due to larger pipes and longer pipe runs

Installation Main headings in the order of installation: Container Installation Piping and Nozzles Actuation Controls Ancillary Equipment Completion Procedures

Installation Important! Installation drawings must be prepared for the hazard. enclosure volumes / agent quantities container data scaled pipe network plan + pipe network isometric pipe diameters, pipe length, drops & rises nozzle data solenoid actuator technical data wiring charts (low pressure switch, pressure switch, actuator) fittings data Installation drawings contain the following information:

Installation Important! Installation drawings must be prepared for the hazard. These drawings should be followed closely in order to ensure that the system meets its design criteria. If for any reason modifications are required the system must be recalculated before proceeding with the installation.

Container Installation General: Container location is identified on the system drawings Containers must be firmly secured to a wall or bulkhead

Container Installation General: No safety outlet and actuation caps should be removed at this stage!

Single Container Installation Fix the back channels of the mounting brackets to the wall at the appropriate hights using suitable anchor type bolts.

Single Container Installation The bracket assembly is designed to be mounted to a rigid surface with the container assembly resting on the floor. Each strap is notched for insertion into the back channel allowing the container to be properly aligned.

Single Container Installation Position the container against the back channel with the valve outlet pointing left. Insert the container straps at top and bottom and secure with the bolts provided.

Single Container Installation Remove the safety outlet cap from the valve outlet adapter With the cap removed from the valve outlet adapter, install a union coupling. Caution. Do not over tighten the container connection. Excessive tightening may cause the valve outlet thread to be damaged. Remove the union and replace the safety outlet cap after the initial pipe run has been installed.

Multiple Container Installation Fix the back channels of the mounting brackets to the wall at the appropriate hights using suitable anchor type bolts.

Multiple Container Installation Position the containers against the back channel with the valve outlet pointing left at the required spacing for the manifold ports.

Multiple Container Installation Manifold bracket installation: cantilever bracket manifold bracket vertical back channel

Multiple Container Installation Manifold bracket installation: Fix the vertical back channels to the wall (appropriate height see table) Locate and secure the cantilever brackets to each channel For safety remove discharge hose and replace safety caps while pipework is installed. Locate manifold brackets in cantilever channel Remove outlet safety cap and attach discharge hose between valve and manifold. Adjust cantilever height as required and secure in position. Hygood manual page 47

Pipe Installation General: The installation should commence at the union elbow (single container) / manifold assembly (multiple containers) and progress along to the discharge nozzles.

Pipe Installation General: Section 5 General: Install the pipework acc. to the installation drawings provided ensuring that the following is adhered to: The piping material must conform to the requirements of BS5306: Part 5 Section 5.1. / NFPA 2001 2-2. The pipe must be reamed, blown clear and swabbed with an appropriate solvent to remove mill varnish and cutting oil before assembly (required by BS / NFPA). PTFE tape is the only acceptable pipe sealant and must be applied to the male threads.

Pipe Installation US Steel Pipe Requirements:

Pipe Installation US Fittings:

Pipe Installation UK Steel Pipe Requirements:

Pipe Installation UK Fittings:

Pipe Installation Pressure test of pipe work depends on standard / local regulation. All open ended pipe shall be pneumatically tested in a closed circuit for a period of 10 minutes at 3 bar. At the end of the 10 minute period the pressure drop shall not exceed 20% of the test pressure i.e. 2.4 bar.

Pipe Installation Pipe Hangers: Hangers must be spaced according to the size of the pipe. Hangers must be fixed to a structure capable of supporting the pipework.

Pipe Installation Pipe Hangers: Hangers must be placed within 300 mm (12") of the discharge nozzle. Hangers must be placed between elbows that are more than 600 mm (24") apart.

Pipe Installation Side tee split limits Bull tee split limits 90-70% 10-30% 90-70% minimum length of 10 x nominal pipe diameter Side tee split limits Bull tee split limits 30-70% 70-30%

Pipe Installation minimum length of 10 x nominal pipe diameter ???

Pipe Split Side tee orientation: yes flow split on horizontal plane no

Pipe Split Wrong way of side tee orientation:

Pipe Split Bull tee orientation: yes no flow split on horizontal plane

Nozzles All nozzles require the installation of a dirt trap comprising 1 side tee, 2 nipples and 1 pipe cap. Fit the nozzle to the nipple of the dirt trap and check the nozzle orifice to ensure proper orientation. maximum

Nozzles A false ceiling comprising loose tiles must have the tiles retained within a 2 m radius of the nozzle to prevent moving during discharge. max. 300 mm Nozzles should be installed a maximum of 300 mm below the ceiling.

Nozzle Installation

Nozzle Installation

Nozzle Installation

Actuation Method depends on system configuration: Single container actuation Multiple container actuation

Single Container Explosion proof electric actuator: Solenoid adaptor tail piece is factory installed

Single Container Explosion proof electric actuator : Actuator is connected to valve with solenoid adapter Do not install actuator until final connections!

Single Container Removable electric actuator: Installed hand tight Do not install actuator until final connections!

Single Container Removable electric actuator: 4.5-5.0 mm with nut tight against body plug can be located any 90o angle NON-FIRE POSITION

Single Container Manual actuator: Mount directly to valve! Mount on top of removable electric actuator. Hand tight only. Do not install actuator until final connections!

Single Container Manual actuator: Check actuation pin. Pull knob will not raise pin! 4.5-5.0 mm with nut tight against body

Single Container Pneumatic actuator: Mount directly to valve. Normally on slave tanks.

Multiple Container Actuation Master Slave Master cylinder electric & / or manual actuation Slave cylinders pneumatic actuation Max. slaves = 9

Pressure Switch Signals that the system has actually discharged Connects to pneumatic actuation line

Pressure Switch Single tank & multiple tank installation Connections Single Tank System Multiple Tank System Connections Term. 1 Common (violet) Term. 2 NO (black) Term. 3 NC (blue)

Multiple Container Actuation

Low Pressure Switch Factory installed to every container valve * * Pyro-Chem optional

Warning Notice Required at every exit Required at every entrance May be screwed or glued Areas protected by concentrations less than NOAEL Areas protected by concentrations greater than NOAEL

Completion

Completion Procedures Pre-checks and visual inspections Final connections Hand over procedure

Completion Procedures Electrical Checks: Make sure electric actuator is disconnected from the valve Check electric connection to control panel Check actuation Ensure reset of the actuator! Do not replace actuator until final handover

Completion Procedures Pneumatic Checks: Remove pneumatic actuator from each cylinder Disconnect pilot hose from master cylinder Introduce 4 bar (58 psi) Verify pneumatic actuator operation Verify pressure switch operation (if installed)

Completion Procedures Pneumatic Checks: Before replacing the pneumatic actuator(s) ensure reset After replacing the pneumatic actuator(s) reconnect pilot hose Reset pressure switch

Completion Procedures General Mechanical Checks: Inspect cylinder / cylinder battery Back channels Container fixing Manifold fixing Firm connection of discharge hoses Firm connection of pilot lines Container nameplates

Completion Procedures General Mechanical Checks: Inspect protected area Piping Pipe connections Nozzles Warning signs

Completion Procedures Final Connections: Single container system Remove outlet cap Connect piping to outlet Install electrical actuator

Completion Procedures Final Connections: Multiple container system Remove outlet caps Connect flexible discharge hoses Install electrical actuator

Completion Procedures Handover Procedure: Entire system inspected Make sure system is operational Make photos (for your own documentation) Issue of the appropriate documentation Explain the operation of the system to your customer

Completion Procedures General: Personnel required to work in protected area should be familiar with the detection and suppression system User to be trained in operation of the system General about the extinguishing system Purpose The agent

Completion Procedures General: Personnel required to work in protected area should be familiar with the detection and suppression system User to be trained in operation of the system How does the system release? Manual System Fully Automatic System Fully Automatic System with Manual Intervention

Completion Procedures General: Personnel required to work in protected area should be familiar with the detection and suppression system User to be trained in operation of the system What to do in case of alarm/release? Vacate the room at once No danger to personnel

Completion Procedures General: Personnel required to work in protected area should be familiar with the detection and suppression system User to be trained in operation of the system Actions following an alarm/release? Advise the emergency services if appropriate Make sure nobody is in the hazard ("roll-call") Prevent unauthorized personnel from entering the hazard area

Completion Procedures Handover Procedure: Appropriate record (Commissioning Schedule)

The only part left ... Introduction Components FM-200® Design Install./Maint. Exam