00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND.

Slides:



Advertisements
Similar presentations
Ways to Improve the Hazard Management Process
Advertisements

Report #12-76 Saw head detaches during operation Report Number: Report Date: 03/19/2012.
Total Productive Maintenance
Manitoba School Bus Pre-Trip Inspection
Company Confidential Registration Management Committee 1 AS9110 Alignment to Federal Aviation Regulations (FARs) and Original Equipment Manufacturers(OEMs)
Driver Inservice Child Safety Restraint Systems on School Buses.
Streamlined Consultation Training Modules Module #1 - Frequently Asked Questions on the Section 7 Consultation Process Module #2 - An Overview of Streamlined.
Wheelchair and Passenger Restraints Your Logo Here A straightforward presentation to be viewed at your leisure, but not to be ignored. Working with equipment.
1 Continuity Planning for transportation agencies.
Replacing Arch Beams: Your Plant’s Safety Depends On It!
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
AFISS Prospectus of Services AFISS offers HACCP food safety and food quality systems development and management services including preparation for regulatory.
Overview Lesson 10,11 - Software Quality Assurance
INDUSTRIAL & SYSTEMS ENGINEERING
Slide 1 FAA’s Special Technical Audit of Boeing and the Audit Resolution Plan.
WHS Management Plans.
Federal Aviation Administration Oversight of Contract Maintenance Presented to: U.S./ Europe International Aviation Safety Conference By: Dan Bachelder,
USC Health and Safety Supervisor Training November 24 th and 25 th, 2011 Health & Safety Refresher PART 3.
Visit us at E mail: Tele:
National Safety Code in April 22, What is NSC? The National Safety Code (NSC) is a set of safety standards for motor carriers, drivers and vehicles.
This material was produced under grant number SH SH-1 from the Occupational Safety and Health Administration, U.S. Department of Labor. It does not.
Proprietary Property of GE - Not to be Distributed Externally Underwriting Study: What Account Characteristics Drive the Loss Ratio Presented by Lawrence.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
Safety Systems Management Reginald C. Reese VP, Safety and Risk Management Safety Summit 2011 Presentation ….and the Benchmarking Process.
Makes it possible for customers to; Focus on their core activities Expand through flexible production capacity Reduce their total cost Release tied-up.
AMR Proprietary and Confidential FAA Compliance Training.
Visit us at E mail: Tele:
How Hospitals Protect Your Health Information. Your Health Information Privacy Rights You can ask to see or get a copy of your medical record and other.
National Property Management Association 10 Worst Mistakes to Make in Property Management Bill Beedle, CPPM CF Cheri Cross, CPPM CF 1.
Installation and Maintenance of Health IT Systems
MNM Fatal Fall of Person Fall of Person February 27, 2014 (Iowa) February 27, 2014 (Iowa) Underground Limestone Mine Underground Limestone Mine.
Health and Safety Policy
Mechanical Integrity Written Procedures. Lesson Objectives  Describe Required Written Procedures for Establishing an MI Program  List Acceptable Sources.
Portsmouth Public Schools. B-E-S Approach Building Safety Employee Safety Student Safety.
Safety Auditors Conference 2005 A Practical Approach…….
Software Project Management Lecture # 11. Outline Quality Management (chapter 26 - Pressman)  What is quality?  Meaning of Quality in Various Context.
Introduction Research indicates benefits to companies who establish effective worker safety and health programs: –Reduction in the extent and severity.
Aviation Maintenance Management
By: Caleb Harris.  The main purpose of QA is to monitor programs to determine their effectiveness, and if they are ineffective, to implement appropriate.
Managing Rotorcraft Safety During Frequently Performed Unique Missions September 28, 2005 AHS International Helicopter Safety Symposium 2005 Philip G.
U.S./Europe International Aviation Safety Conference By: Date: “Global Aviation Safety Processes: Refining Reinforcing, and Streamlining” Federal Aviation.
1 Total Productive Maintenance and Maintenance Management
Information Security 14 October 2005 IT Security Unit Ministry of IT & Telecommunications.
Enhanced Airworthiness Program for Airplane Systems (EAPAS) Presented by: Massoud Sadeghi FAA - Aging Systems Program Manager EAPAS Workshop November 2002.
1 Asset Disposal Project Rebuild Proposal For Mobile Equipment.
Project management Topic 3 Quality.
MTA New York City Transit 2011 Safety Initiatives Transit Riders Council Meeting December 22, 2011.
Software Quality Assurance SOFTWARE DEFECT. Defect Repair Defect Repair is a process of repairing the defective part or replacing it, as needed. For example,
Doane Pet Care Company Pet Food Safety System (PFSS) M.W. Merkel September 23, 2003 Animal Feed Safety System Public Meeting.
Establishing and Maintaining Effective Safety Committees.
MNM Fatal /14 Fall of Material Accident Fall of Material Accident August 12, 2010 (Nevada) August 12, 2010 (Nevada) Underground Gold Mine Underground.
Page 1 Confidential and proprietary information of WindCom Wind Composite Services Group Introduction to Services.
ASPEC August 2015 Incidents –0 incidents, 0 near misses Hours 01/08/15-28/08/15 14% Site, 0.6% Travel, 85% Office.
CCTV SECURITY & MONITORING SERVICES DAY SEVEN TECHNOLOGY CONSULT DSTC Monitoring Services Ltd DSTC.
MNM Fatal Powered Haulage Accident Powered Haulage Accident December 8, 2011 (Minnesota) December 8, 2011 (Minnesota) Crushed Stone Operation Crushed.
Retrofitting and Maintenance. Regular Maintenance is Necessary Failure to Perform Maintenance Leads to….. Diminished Performance Deterioration Failure.
MNM Fatal Falling Material Falling Material June 12, 2006 (Virginia) June 12, 2006 (Virginia) Crushed Stone Operation Crushed Stone Operation Machine/Plant.
Laboratory equipment Dr. W. Huisman Cairo, November 21th 2012.
 Overview of Project management. ◦ Management. ◦ Project Management. ◦ Software Project Management. ◦ Project(Dimensions, Characteristics, Complexity,
- HEMIC Facility Inspections. Common Losses A fire breaks out in a 16 story office building An employee had the tips of two fingers amputated Could these.
Overview of the Elevator Division and Its Quality Assurance Program January 2006.
Author name here for Edited books chapter 9 Facility Maintenance 9 chapter.
HSE Interview Questions / Answers Series (Part 1)
Health and Safety Policy
Fleet Management Webinar: Emphasizing Preventive Maintenance in All Processes May 2, 2017.
Maintenance Component of the Regional Aviation Safety
Transportation Professionals Advisory Committee Meeting
Crown Point Community Schools Transportation Department
Safety and Accident Prevention
Trending Requirements and Results
Presentation transcript:

00 Review of PTSB Issues Henry Sullivan Chief Maintenance Officer NYCT Department of Buses / MTA Bus / LI Bus November 2011 CONFIDENTIAL, PROPRIETARY AND NOT FOR DISTRIBUTION

111 Agenda Statistics Overview Actions Taken Current Status Maintaining the Improvements Detailed Explanation of Failure Modes and Retrofits Conclusion

22 PTSB Cases

3 Overview Increase in PTSB cases in first half of In June, met with Office of System Safety (OSS) and PTSB to explain the rise in PTSB cases. After meeting, established procedures to prevent accidents and sustain a lower rate of PTSB cases. Complexity of fleet is a major issue in resolving problems. –3 types of propulsion systems Diesel CNG Hybrid –3 types of vehicles 40-foot local 60-foot artic Express –6 different bus manufacturers –Fleets range in age from 1995 to 2011, resulting in 23 variations in production models.

4 Actions Taken Established AGM Committee. Meetings to explain the causes and effects of the PTSB cases, as well as the procedures to prevent them. Made instructional CDs of the presentations for Depot Training Supervisors (DTSs) to hold training at all the depots (“PTSB Shop Gates”).

5 Fires – Current Status

6 Mechanical Failures – Current Status

77 Maintaining the Improvements AGM Committee meets weekly. –Identifies short- and long-term solutions for issues. –Identifies modifications to policies and procedures. –Performs campaign tracking and updates. Depot management conducts a Quality Control check geared towards PTSB cases. –10 buses are checked per day at each depot. “Report Card” audits held at each depot. –At the end of the audit, all depot management personnel ride a bus to look at it from the customer’s point of view. Customer Services conducts audits of PTSB issues at each depot to ensure that critical safety campaigns are completed. Bus Merger Team conducts quality audits. S.O. Re-Rack Audits are held each day and documented in SPEAR (1 bus per day per depot). Random inspections of depots are held jointly by the PTSB, OSS, and ACMO, Customer Services.

8 Detailed Explanation of Failure Modes and Retrofits

9 OEM Installation in Orion VII Bus

10 Issues with OEM Unit Loosening of Mounting to Panel

11 Issues with OEM Unit Assembly Components Falling Apart

12 Issues with OEM Unit Missing Rivets Securing Plate to Assembly

13 Issues with OEM Unit Cracks in Blower Housing

14 NYCT Retrofit Kit Frame Mount Bracket Blower Assy. Mount Bracket Cover-plate Panel reinforcement Bracket (Upper) Panel reinforcement Bracket (Lower) Retainer Brackets U- Clamp Blower Assy.

15 Rework Shop Rebuilt Unit with Pre-Assembled Bracketry New or repaired blower housing and blower plate

16 Rework Step 1: Mount Bracket to Frame

17 Rework Step 2: Reinforce Panel

18 Rework Step 3: Mount Blower Assembly

19 Rework Step 4: Install Upgraded Coverplate

20 Rework Step 5: Install Grille & Retainer Brackets

21 Conclusion In order to keep focus and maintain the results we have achieved so far we will continue with: –Depot management conducts Quality Control check geared towards PTSB cases. –“Report Card” audits held at each depot. –Customer Services conducts audits of PTSB issues at each depot to ensure that critical safety campaigns are completed. –S.O. Re-Rack Audits held each day and documented in SPEAR. –Random inspections of depots held jointly by the PTSB, OSS, and ACMO, Customer Services.