LIGO-G030538-00-D Quiet Hydraulics Board: Purpose, Scope, Charter and Plans Dennis Coyne Kick-off Stanford, 16 Oct 2003.

Slides:



Advertisements
Similar presentations
Computer English For Computer Major Master Candidates
Advertisements

Testing Relational Database
LIGO-G M May 17, 2006 Installation (INS) Requirements and Design Breakout Presentation NSF Review of Advanced LIGO Project Dennis Coyne, Caltech.
CATIA V4 Software Deployment Project Proposal
LIGO-G M LIGO - The Laser Interferometer Gravitational-wave Observatory Vibration and Facility Considerations (incomplete) Dennis Coyne TMT Vibration.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review 2011 Tidal Energy System for On-shore Power Generation Dr. Allan Bruce Sunlight.
LIGO-G W Status of LIGO Installation and Commissioning Frederick J. Raab, LIGO Hanford Observatory.
LIGO-G M 1 Conceptual Design Review: Initial LIGO Seismic Isolation System Upgrade Introduction Dennis Coyne April 12, 2002.
LIGO-G0200XX-00-M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002.
LIGO-G M LIGO Laboratory1 Adv. LIGO Installation (INS) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
Dennis Coyne Excomm Jan 26, 2004
LIGO-G M LIGO1 Hydraulic External Pre-Isolator (HEPI) Overall Installation Plan/Schedule Dennis Coyne HEPI Installation Readiness Review Feb 11,
G M Advanced R&D1 Seismic Isolation Retrofit Plan for the LIGO Livingston Observatory Dennis Coyne 29 Nov 2001.
LIGO-G M LIGO Laboratory1 Pre-Isolation Dennis Coyne LIGO Laboratory NSF LIGO Annual Review, at MIT 23 October 2002.
LIGO-G W Raab: Searching for Gravitational Waves w/ LIGO1 Why Has Duty Cycle Been Lower in Livingston.
LIGO-G M LIGO Laboratory1 Adv. LIGO Seismic Isolation (SEI) Plans, Schedule, Costs, Team Schedule »through R&D, including near-term plans »project.
Nov ’01, page 1 Current Work on Hydraulics for LIGO 1 and Advanced LIGO Rich Abbott, Graham Allen, Daniel DeBra, Joe Giaime, Giles Hammond, Marcel Hammond,
LIGO-G D partial ADVANCED LIGO1 Development Plan R&D including Design through Final Design Review »for all long lead or high risk subsystems »LIGO.
LIGO-G M 1 Initial LIGO Seismic Isolation System Upgrade Dennis Coyne LIGO Seminar March 29, 2002.
LIGO-G M Status of LIGO Barry Barish PAC Meeting Caltech 3-June-04 Upper limits on known pulsar ellipticities.
D-M-E Hot Runner Solutions D-M-E Hot Runner Capabilities.
Unihose Dispenser Workshop June 16, 2004 Monitoring and Laboratory Division Air Resources Board California Environmental Protection Agency.
G R Advanced LIGO Seismic Isolation R&D Dennis Coyne 8 Oct 2002.
LIGO-G W Status of LIGO Installation and Commissioning Frederick J. Raab, LIGO Hanford Observatory.
Systems Development AIMS 2710 R. Nakatsu. Overview Why do IT projects succeed and fail? Two philosophies of systems development –Systems Development Life.
LSC Meeting, Livingston Observatory, 3/18/03 Proposal for Trinity University Participation in the LSC Dennis Ugolini, Trinity University Wednesday Plenary.
LIGO-G M 1 Conceptual Design Review: Initial LIGO Seismic Isolation System Upgrade Development, Implementation Plan & Schedule Dennis Coyne April.
Proposed Amendments to Enhanced Vapor Recovery Regulations November 18, 2004 Monitoring and Laboratory Division Air Resources Board California Environmental.
Systems Development MBAA 609 R. Nakatsu. Overview of Today’s Lecture Why do IT projects succeed and fail? Two philosophies of systems development –Systems.
Physical Properties of Hydraulic and Pneumatic Fluids Mohammad I. Kilani Mechatronics Engineering Department University of Jordan.
National Commission for Academic Accreditation & Assessment Developmental Reviews at King Saud University and King Faisal University.
15 January 2010 energynetworks.org 1 PRESENTED BY SIMON BROOKE Revised DCMF Terms of Reference Distribution Charging Methodology Forum.
LIGO- G D The LIGO Instruments Stan Whitcomb NSB Meeting LIGO Livingston Observatory 4 February 2004.
G M 1 HAM-SAS CCB information 22 Feb 06 Coyne, Shoemaker, Wilkinson.
VOLUNTEER MANAGEMENT ACTION PLAN PRESENTATION DATE The Leadership Development and Strategic HR Practice Area is presented by American Express. This Service.
VOLUNTEER MANAGEMENT SITE VISIT DATE The Leadership Development and Strategic HR Practice Area is presented by American Express. This Service Grant design.
A–Level Computing Project Introduction. Learning objectives Become familiar with the: Guidelines associated with choosing a project. Stages in project.
G Consideration of HAM SAS for Advanced LIGO David Shoemaker LIGO Excomm 30 April 07.
LIGO-G D LIGO R&D1 Advanced LIGO R&D Review The PSL Peter King & Rich Abbott October 8, 2002.
LIGO-G D What can we Expect for the “Upper Limit” Run Stan Whitcomb LSC Meeting 13 August 2001 LIGO Hanford Observatory A Personal Reading of.
Systems Development Life Cycle
LIGO-G D LSC Meeting Nov An Early Glimpse at the S3 Run Stan Whitcomb (LIGO–Caltech) LIGO Scientific Collaboration Meeting LIGO Hanford.
Part 11 Public Meeting PEERS Questions & Responses The opinions expressed here belong to PEERS members and not the corporate entities with which they are.
API Recommended Practice 17X Recommended Practice for Design, Installation, and Maintenance of Subsea Booster Pump Systems Status Report October 3,
Web Advisory Committee Overview CMS Project Status Update Major work underway Timelines (high level) Blogging capability Events-calendar capability.
Systems Development AIMS 2710 R. Nakatsu. Overview Two philosophies of systems development –Systems Development Life Cycle (SDLC) –Prototyping Alternative.
Considerations and operational challenges in choosing Membrane Filtration for a Water Treatment Plant Upgrade Ed Cross Division Manager, Water Supply and.
LIGO-G M LIGO Laboratory1 Adv. LIGO Installation (INS) Plans, Schedule, Costs, Team Plan, Schedule Costs Team.
LIGO-G D Commissioning at Hanford Stan Whitcomb Program Advisory Committee 12 December 2000 LIGO Livingston Observatory.
LIGO PAC11, Nov 2001 Syracuse proposal to NSF LIGO-G Z 1 Proposal to NSF: “Research in Gravitational Wave Detection with LIGO” Peter R.
LIGO-G M State of the LIGO Laboratory Gary Sanders LIGO/Caltech LSC Meeting, LLO March 16, 2004 State of LIGO.
LIGO- G M LIGO Status Stan Whitcomb Oversight Committee 20 October 2004.
Instructional slide to Partner: REMOVE BEFORE PRESENTING TO CUSTOMER
Systems Analysis and Design
Horizon Training Academy
Overview of the FEPAC Accreditation Process
Harmonisation Working Group Update on Harmonisation Project
Status of the LIGO Detectors
Status of LIGO Installation and Commissioning
Information To support CEAF Notification of proposal to modify the orientation of the , CLAMP, V BAND that is used in XS9693 on 6 cylinder automotive.
R&D Highlights Seismic Isolation Suspensions ISC/40m
Stan Whitcomb LSC meeting Livingston 21 March 2005
The Laser Interferometer Gravitational-Wave Observatory
Introduction to Hydraulics
Management of the Advanced LIGO Seismic Isolation System Development
LIGO Advanced System Test Interferometer
Coordinate Operations Standard
Industrial Cylinder Division - USA
Improving LIGO’s stability and sensitivity: commissioning examples
Introduction: Real-time Hydrology Information System
Presentation transcript:

LIGO-G D Quiet Hydraulics Board: Purpose, Scope, Charter and Plans Dennis Coyne Kick-off Stanford, 16 Oct 2003

LIGO-G D LIGO Laboratory 2 Purpose, Scope and Charter of the QHCB Purpose is to support the introduction of a “new” technology (quiet hydraulics) into LIGO »LIGO Lab does not have expertise in hydraulics »Stanford continues to support, but we want to augment their support with consultants familiar with the LIGO application so that we can rapidly respond if problems arise Scope is generally the Hydraulic External Pre-Isolation (HEPI) system, but most particularly the quiet (laminar flow) hydraulic aspects of the system (pump station, fluid distribution, servo-actuator, fluid/material compatibility, reliability, etc.) Charter: »Become informed of the HEPI design »Provide advice on remaining design and implementation »Should problems arise, help diagnose what's wrong and propose solutions. Examples: –Suppose subtle interactions or effects occur which limit performance and require a deep understanding of quiet hydraulics –Suppose Parker drops the pneumatic servo valve that we have modified (revised nozzle), or we find that there are reliability problems. Are there other, more or less "pin compatible" units to choose from, either from Parker or other manufacturers?

LIGO-G D LIGO Laboratory 3 Background References Overview of the Hydraulic External Pre-Isolator (HEPI) system: » Overview of the quiet hydraulic actuators: » More info, pictures and some test results of the full scale prototype: » m Quiet Hydraulics orientation, or training, material by Dan, Brian & Corwin (presented here today)

LIGO-G D LIGO Laboratory 4 Planned Meetings 10/16 Kick-off meeting: this meeting » Intent is to acquaint all board members with the LIGO application, give an overview of LIGO, the vibration isolation system and especially the quite (laminar flow) hydraulic, 6 degree of freedom pre-isolation stage 10/22 Visit to full-scale LASTI facility (MIT) and Fluid Distribution system plan review » See an installation of a full-scale, prototype system almost identical to what we intend to start installing at the observatory in Louisiana in January through April » We will also discuss issues, or concerns, associated with the fluid distribution system (manifolds, valving, maintenance/servicing, etc.) and pump station TBD date (late Oct, early Nov), ~2 hr Teleconference: Fluid distribution system design review. Observatory visit: During installation and commissioning activities at the LIGO Livingston Observatory (LLO) in Livingston, Louisiana - - approximately late Feb/early Mar 2004 Meetings thereafter via telephone & every ~6 months » unless circumstances warrant a site visit or an earlier meeting or more frequent meetings.