Western Underground SDGE Smart Technology & Grid Hardening 1.

Slides:



Advertisements
Similar presentations
Outage Reporting Hierarchy Background Data Capture Structure Next Steps.
Advertisements

1 Smart Grid Vision Electric Grid Modernization Steering Committee Grid Facing Technology Subcommittee January 14, 2013.
The Power Grid ELEC 403 The Citadel Mark McKinney.
© 2006 San Diego Gas & Electric Company. All copyright and trademark rights reserved. Microgrid – A Smart Grid Alternative Service Delivery Model? Thomas.
Small Wind Production Wind power solutions at home.
Dynamic Distribution Grids © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. Neal Bartek.
1 PSE&G’s Solar 4 All™ Program: Pole-Attached Solar Installations in Your Area December 22, 2009 January 12, 2010.
Copyright © 2011 Rockwell Automation, Inc. All rights reserved. Insert Photo Here OneGear™ 7.2kV Motor Control Center.
Designers & Fabricators of Water & Waste Water Equipment Water Pump Stations.
Building A Smarter Grid Through Distribution Automation DOE Projects OE & OE April 2013 Copyright © 2012 Consolidated Edison Company of New.
SmartGridCity™: A blueprint for a connected, intelligent grid community Presented to the Utah Public Service Commission May 13, 2009.
Doc.: IEEE leci Submission Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Use Case: Distribution.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
CenterPoint Energy Houston Electric 2011 Response to Contamination Conditions John Kellum Director of Transmission Operations August 3, 2011.
This Project consists of the following major elements Install new 15kV padmount switchgear Underground 15kV conduits and cable Underground Communications.
Lecture 26 Distribution Systems Professor Tom Overbye Department of Electrical and Computer Engineering ECE 476 POWER SYSTEM ANALYSIS.
Microgrids and Infrastructure Resiliency RPI Microgrid Workshop Stuart Nachmias October 10, 2013.
AES Buffalo Gap Wind Farm Buffalo Gap MW 155 – GE 1.5 sle Presented August 22, 2008 By Robert Sims AES Wind Generation.
Distribution Automation Plans in AEP Texas. Overview AEP Texas is deploying smart meters to roughly 1,000,000 customers The meters utilize Landis + Gyr.
Data trapped in billions of devices Devices often in hard-to-reach locations - basements. below ground, pad mounts Interference is increasing and poses.
New Product Overview Homac STORM SAFE™ Connector Systems Presented by: Presented by: Roy Jazowski - Director of R&D Mark Hammer – Director of Marketing.
SmartMeter Program Overview Jana Corey Director, Energy Information Network Pacific Gas & Electric Company.
EET Survey of Electronics
Electrical Power Systems
1 Green River Utah Area Transmission and Distribution System – January 16, 2009.
1 CREZ COMMUNICATIONS Presented by American Electric Power Telecommunications Engineering Matt WilliamsDon Demand Columbus, OHTulsa, OK.
Terry Chandler Power Quality Inc, USA Power Quality Thailand LTD Sept /6/20091www.powerquality.org all rights reserve.
DCN k Submission Jan 2011 Sourav Dey, On-Ramp WirelessSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
1 Introduction to Power Systems Expensive! Influential!Intrusive! Source: Riadh W. Y. Habash, Electromagnetic Fields and Radiation, Marcel Dekker, New.
CITY OF LAKE WORTH, FLORIDA UTILITIES DEPARTMENT A Look at our Electric Utility A Plan For The Future.
Increasing the life cycle of existing grids to avoid high replacement costs of new systems By S.R.Sethi Member Delhi Electricity Regulatory Commission.
Metropolitan Planning Council Roundtable Discussion November 17, 2011 ComEd J. Tyler Anthony Senior Vice President, Distribution Operations.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
Pole Mounted Switch Disconnector NPS
SDG&E Electric Reliability Reporting CPUC Workshops May 26-27, 2015.
4/22/2017 WHAT IS THERMOGRAPHY?
Power Magazine Visuals © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. June 28, 2012.
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
WESTERN UNDERGROUND COMMITTEE 2015 Spring Conference 65 th ANNIVERSARY 1950‐2015 Welcome Remarks Bill Chiu Director of Engineering – T&D Southern California.
1. ALTERNATING CURRENT- THE CURRENT SWITCHES DIRECTION BACK AND FORTH. Used in generators, motors, and power distribution centers 2.Direct current- electricity.
1 ENCO Utility Services How Could a Boulder Municipal Utility Run Its Electric Distribution System? June 1, 2011 Boulder, Colorado
Medium Voltage products Energy reliability & revenue improvement Speaker: Jean-Yves Pocthier - Schneider Electric France Technical solution for improvement.
Jump Starting ITS Deployment in Los Angeles County using Wireless Communications Lessons Learned.
January 2009 SEMO Ice Storm Extreme Measures IEEE-PES St Louis Chapter Meeting June 18, 2010 Presented by David Wakeman Vice President, Energy Delivery.
SAFE PRACTICES IN POWER DISTRIBUTION SYSTEM UNDER NESCO.
AES Buffalo Gap Wind Farm Buffalo Gap MW 155 – GE 1.5 sle Presented August 22, 2008 By Robert Sims AES Wind Generation.
Lee County Electric Cooperative 2007 Hurricane Preparedness Activities.
Substation Inspection Program. Mission Substation Incident The event occurred on December 20, 2003 during the peak Christmas shopping season A fire occurred.
Submission Title: [Wireless Neighborhood Area Networks - WNAN] Date Submitted: [15 July, 2008] Source: [Tommy Childress]Company [Cellnet+Hunt] Address:
Submission Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Smart Grid: Faulted Circuit Indicator]
Utility Engineers, PC.  Generation  Transmission  Distribution.
Distribution Systems-General
Tampaelectric.com Presented to the Florida Public Service Commission May 1, 2008 Tampa Electric Company 2008 Hurricane Season Preparation Regan Haines.
Bywater Reliability Update Gary Huntley Entergy New Orleans, Inc. Regional Manager Entergy New Orleans, Inc. July 28, 2010.
Copyright © Central Lincoln PUD and SEL 2015 Communications-Capable Fault Indicators Improve Outage Response for Coastal Oregon Shamus Gamache Central.
1 Transmission of Electrical Energy Electrical energy is carries by conductors such as overhead transmission lines and underground cables. The conductors.
Loop-Sectionalizing Automation Scheme Colin Hawthorne 4/26/2016.
Dr. Vidya Vankayala Director, Grid Modernization (604) Richard Guo
ELECTRICAL INSTRUMENTS ( service and utilization )
Microgrid Load Management and Operation Erich Keller G&W Electric Co. Frank Patton Jr., PE N. J. Shaum & Son, Inc.
Permanent Solutions to Temporary Loads: An Alternate Approach to Electrical System Design for Short Term and Mobile Industrial Loading Presented by: Eli.
City of Sarasota Franchise Agreement Rae Dowling, Buck Martinez and Ken Rubin June 16, 2010.
URBAN DESIGN Non-standard (Alternative) and Aesthetic Liafis A Ogboye, P.E.
Electricity.  Aims – To understand the process of providing Electricity to buildings.  Objectives  To understand how Electricity is Generated.  To.
Resiliency and Reliability
Sub Station.
Utility Needs and Smart Grid for Major Storm Events
Basics of electrical engineering
Installation And Estimation of Service Connection
Hamilton County / National Grid Meeting
Presentation transcript:

Western Underground SDGE Smart Technology & Grid Hardening 1

Topics Deployment of Overhead Radio Fault Indicators Deployment of Undergroud Radio Fault Indicators Hendrix/Steel Pole Installations Steel Poles In HFRA & Fiberglass Poles In Wetland Locations 2

SDG&E Overview San Diego Gas & Electric ® was founded in 1881, supplying 59 customers with gas for streetlights, homes and businesses in downtown San Diego (now the Gaslamp District). Today, SDG&E is a regulated, public utility providing safe and reliable energy services to 3.4 million customers through 1.4 million electric meters and 840,000 natural gas meters in San Diego and South Orange County. Customer mix is 89% residential and 11% commercial & industrial. SDG&E and Southern California Gas Company are a part of Sempra Energy, a Fortune 500 company. 3

System Statistics – Electric Distribution Over 1000 Circuits; about 163,000 transformers, 4100 sq. miles – 4 kV, 12 kV, – About 70% Underground; almost 22,000 miles total – Heavily automated at substation and circuit level, with over 1000 SCADA controlled devices, and over 75 SCADA substations – Five year average SAIDI less than 60 minutes – About 500 cable faults per year, 1800 outages total – Over 160 MW distributed solar now, across 22,000 customers – One of first major cities to rollout electric vehicles – 2K customers to date – Six main operating districts with two satellites – Coastal, inland, mountain, and desert environments SDG&E was first California IOU to file comprehensive Smart Grid Deployment plan to CPUC – June

Overhead Radio Fault Indicators 5

Development of Radio Fault Indicators Schweitzer Engineering Laboratories provides most of our fault indicators On Ramp Wireless (ORW) worked with SEL to incorporate communications into an existing OH fault indicator Provided a working device which required testing 6 WSO-11 FCI

Goal of Overhead Wireless Fault Indicator Project Deployed and tested 25 units for proof of concept – Using the ORW Network They worked Install 2800 units in 2012 – Required SDGE Installing 35 Access Points Our Goal is to install over 10,000 FCIs, combination of OH and UG, by 2017 Sync with OMS/DMS for Operations 7

Approach and Methodology Locations Picked – Non-SCADA switches – Non-SCADA circuits – Replacing Non-Wireless Fault Indicators – Grounding Banks Verify communication coverage at each location from OnRamp provided network coverage Future locations – Solid blade fuses – Key branches – 12/4kV Step-downs 8

Example Of Overhead FCI Deployment Rural Circuits with High Fire Danger – Elevated fire condition policy: Completely patrol a line before reenergizing, after a circuit trip. We operate in this condition for almost half the year, covering much of the service territory Lack of vehicle access makes this process arduous, especially for distribution lines – Thus automation to pin point the fault was a major driver – In 2012 we began installing the production units of the SEL/ORW Overhead Wireless Faulted Circuit Indicator (FCI) System changes and firmware upgrades can be done remotely, which is very important with many units in the field 9

kV Circuit Located in Extreme Fire Area Many miles from substation Fault Last Communicating Device “Intellirupter” Sub ETS would have to patrol from here, possibly taking hours to restore the circuit

Many miles from substation Fault ETS would have to begin his patrol here saving hours in circuit restoration No fault LOC event Shows Fault “Intellirupter” 12kV Circuit Located in Extreme Fire Area Sub

12 Installed WFIs on Distribution Circuit WFI being installed with a “Shotgun” WFI installed on “A”, “B”, & “C” Phases Antenna

Underground Fault Indicators 13

Goal of Underground Wireless Fault Indicator Project Having the FCI communicate in the overhead located 30+ feet above ground is much different than being able to communicate: – From within a pad mounted structure – From within an underground manhole or handhole – From within an underground vault two stories below grade Thus it was necessary to pilot underground FCI’s in the various combinations 14

DOE Underground FCI Pilot This project was sponsored by – Department of Energy (DOE), – On Ramp Wireless, – Schweitzer Engineering Laboratories – SDG&E The first step was to install an ORW/SDGE Test Network for our underground pilot – This required installing Access Points (AP’s) in four areas 15

DOE Underground FCI/Transformer Pilot The next step was to locate underground switches within ½ mile radius of each Access Point – The SEL FCI’s for switches are self powered (8301D) –first generation In each area we have deployed three FCI’s We tested, and continue to test the SEL 8301D FCI’s The goal is to test communications as well as data accuracy 16

DOE Underground FCI/Transformer Pilot – Cont’d Fall of 2012, SEL developed a new and improved underground FCI A – The 8301A FCI was equipped with two antennas which offer increased propagation range using diversity scheme – Part II of the pilot was to increase our installation radius from the AP of ½ mile, to ¾ mile for the FCI’s – We installed ten more FCI (8301A) second generation units Again the goal is to measure communications reliability and data accuracy The next slide will show a coverage map and some of the results, followed by pictures of our installations 17

© On-Ramp Wireless, Inc. All rights reserved. 18 Century Park Coverage Map

SDGE Summary June 28, 2012 – January 3, Schweitzer Engineering Labs Underground 8301D FCIs – Reporting every 24 hours 10 Schweitzer Engineering Labs Underground 8301A FCIs – Reporting every 6 hours – Installed mid November 11 Padmounts, 3 Manholes, 5 Vaults, & 1 Handhole SDU Reliability: 99.7%* – SDUs expected – SDUs received * The reliability was 99.9% if we factored out one problem switch 19

20 SDGE Summary Slide – Asset Type ReceivedExpectedPercent Manhole % Padmount % Vault % Handhole % ReceivedExpectedPercent All % Excluding Thornmint TIQ % 8301D (within.5 mile radius) % 8301A (within.75 mile radius) % 20

Radio Ranger Installed On PME 10 Switch SEL Sensing Coils 8301D Radio Ranger/Internal Battery With ORW Radio ORW Remote Single Antenna Compartment 1 21

Radio Ranger Installed On A PME 10 Switch 8301A Radio Ranger Two Antenna’s SEL Sensing Coils 22

Radio Ranger Installed On PME 10 Compartments 3 & 4 Compartment 4 Compartment 3 SEL Sensing Coils Sensing Cables Route Under the Switch To The Radio Ranger Located In Compartment 1 23

Four-Way Gas Switch SEL Sensing Coils 8301D Radio Ranger Single Antenna 24

Four-Way Gas Switch Antenna 8301D Radio Ranger With ORW SEL Sensing Coils 25

Handhole Mounted 8301A Radio Ranger Hinged Aluminum Lid Two Antenna’s: Signal Must Propagate Through Aluminum Lid 8301A Radio Ranger 26

Vault Mounted Four Way Gas Switch – Vaults Are Dry 8301A Radio Ranger Mounted On Vault Wall 27

Same Vault Mounted Switch With 8301A Radio Ranger – Vaults are Dry Vault Cover, Cast Iron Lid Two Antenna’s Signal Must Propagate Through Cast iron Lid/Concrete 8301A Radio Ranger 28

Manhole Mounted – 8301D Radio Ranger Fault Indicator – Manholes Subject To Submersion 8301D Radio Ranger Mounted On Wall Of Manhole Single Antenna Mounted In The Neck Of The Manhole, Signal must propagate through cast iron lid/concrete Coaxial Cable 29

SEL Sensing Coils On G&W Oil Switch Radio Ranger Installed On A 4 Way Oil Switch – Subject To Submersion 30

Preparation To Install Radio Ranger Fault Indicators In A Manhole Pumper Truck Traffic Control However Once Installed We May Not Need To Open The Manhole 31

SDGE Future Plans For Underground FCI’s We have been pleased with the results We are working with SEL on several product improvements Pressure sensor for measuring water depth in manholes Better load accuracy from the pick-up coils SEL plans to have those improvements completed this year SDGE plans to install 100 units in

Hendrix Spacer Cable System 33

Hendrix Overhead Construction Hendrix Spacer Cable System is used world wide in areas that are Heavily wooded Have significant wind, ice and snow Used in Australia in high fire prone area Our first application using Hendrix was on Palomar Mountain. We used Hendrix Tree Wire on conventional crossarms for this heavily wooded area. After the fact, we learned that the Hendrix Spacer Cable System was over three times as strong, and much more reliable than open wire installations Thus, SDGE worked with Hendrix to modify their products to be applicable to California’s G.O. 95 requirements 18” phase to phase 9” phase to ground 34

Hendrix Installations At SDGE Hendrix modified their brackets, and spacers to comply with California requirements Tangent Bracket, “C” Bracket, “E” Bracket, & GO 95 Spacer Our first spacer application was installed at our Skills Training Center The next two spacer cable applications were in heavily treed areas All the above jobs, and all future Hendrix jobs will be installed on steel poles for strength and added fire protection The advantage of the spacer cable system is: Traditional ACSR wire has a breaking strength of ~4000#’s Hendrix Spacer System relies on a messenger cable with breaking strength of ~17,000 #’s The conductors are insulated thus if a tree branch falls across the messenger and conductors there is no fault, and in most cases the system stays in tact 35

36 Hendrix Termination Bracket & Polymer Deadend with Hendrix Preforms GO95 Spacers Hendrix Tangent Bracket With GO95 Spacer Skills Training Center Level Ground

37 Steel Pole with Hendrix Tangent Support Bracket & G095 Spacer GO95 Spacers installed approximately 30 feet apart Skills Training Center – Level Ground

Palomar Mountain Heavy Tree Area With Snow and Ice In The Winter – Line Changes 600’ Elevation in a little over 2500’ Horizontally 38

Palomar Mountain Heavy Tree Area With Snow and Ice In The Winter Tangent Construction 39

Palomar Mountain Hendrix Construction With Transformer “C” Bracket with Messenger Deadended Cutouts on Alumaform Arms 40

Looking North Down The Hill Palomar Mountain Hendrix Construction Steep Slope “C” Bracket With Messenger Deadended For Steep Slope Swivel GO 95 Spacers For Steep Slope Construction 41

42 Steel Poles In HFRA & Fiberglass Poles In Wetland Locations

Over the last few years we have installed over 4,000 Steel Poles in back country locations Our poles are manufactured by Valmont, with equipment and climbing holes in a “knock-out” configuration Our poles are direct buried with treated “butts” of an epoxy compound called “Corrocoat” We have “RIV Grounds” installed at each equipment level including communications and at the “butt” for the ground rod connection We use galvanized poles in urban locations, and use weathering steel in back country locations including the national forest 43

Steel Poles In HFRA & Fiberglass Poles In Wetland/Back-lot Locations – Cont’d We have also started using fiberglass poles in wetland and back lot locations, and have installed approximately 40 poles to date We are using RS Structure Fiberglass poles The poles come “nested” Advantage for back lot locations is that they can be hand carried into those locations and “ginned” into place For wet land locations the poles can be pre-assembled or assembled on site We often install these poles using “sono tubes” We order the poles pre-drilled with climbing holes Grounds etc. are extended internally inside of the poles 44

First Fiberglass Poles Set In SDGE Service Territory Existing Two Pole Structure in this Marsh land location had rotted out 45

46 Marshy Area Required Placing Sono Tubes For Installation Two Pole Fiberglass Structure First Fiberglass Poles Set In SDGE Service Territory