Fluor K132 (Santos) Contract – Dawson’s Bend Road AustStab Awards of Excellence 2013 FK Gardner & Sons Pty Ltd Innovation or Excellence in Sustainability.

Slides:



Advertisements
Similar presentations
Bruthen Intersection Rehabilitation AustStab Awards of Excellence 2014 QRCG INNOVATION OR EXCELLENCE IN SUSTAINABILITY Sponsored by.
Advertisements

MIT Research: LCA of Concrete Pavements. MIT Concrete Sustainability Hub $10 million investment over 5 years Funded equally by RMCREF & PCA NRMCA providing.
Otto Waste Systems is a subsidary of Boitumelong Holdings (Pty) Ltd, under the Boitumelong umbrella , there is Otto Waste Sysstem : A joint venture company.
SUSTAINABLE SOLUTIONS IN CONCRETE INDUSTRY
Path to your Energy Savings Existing Residential and Small Commercial.
Metrolight – Committed to Saving Energy Cox Auto Auction 15 MAY 2008.
Incorporating Environmental Costs in Decision Making Gordon Sparks – U of S / VEMAX Nicole Allen – M.Sc. Candidate / VEMAX September 29, 2010 Saskatchewan.
MIT Research: LCA of Commercial Buildings. MIT Concrete Sustainability Hub $10 million investment over 5 years Funded equally by RMCREF & PCA NRMCA providing.
CEMEX and Stabilised Pavements Ltd CO2 and resource efficiency January 2014.
The average Kiwi emits 19.3 tonnes of CO 2-e per annum.
Northern Ireland’s Quarry Products Industry Shared Priorities for Sustainable Development.
Sustainable Pavement Management Plan AustStab Awards of Excellence 2014 City of Gold Coast Category 3: Innovation or Excellence in Sustainability in pavement.
Watershed Dams in Georgia 1. –357 Total –195 High Hazard (NRCS) –NRCS constructed – owned by local sponsors –Most built between 1950s-1970s for flood.
1 Optimising grids Understanding capacity needs to make networks more efficient Mike Kay Networks Strategy and Technical Support Director 23 September.
Innovation or Excellence in Sustainability in Pavement Stabilisation LEIGHTON CONTRACTORS AustStab Excellence Awards 2012.
IPWEA Meeting 3, 8 15 May 2012 Heath Curnow CEO: STABIL-LIME GROUP Vice President: AustStab.
An Overview of the Energy Education Program Monroe County CSC November 3, 2009.
Lee Evans Partnership LLP St. Mary the Virgin Church, Ashford 16 th September 2014 By John Minter and Patrick Osborne.
Gore Highway: Building sustainability for the future AustStab Awards of Excellence 2014 FK Gardner & Sons Group Innovation or Excellence in Sustainability.
Risk Reduction - Foamed Bitumen Foaming Agent
MoDOT’s Approach to Program Management Kathy Harvey State Design Engineer Missouri Department of Transportation.
Key learning from near miss reporting AustStab Awards of Excellence 2013 Downer Infrastructure WORK, HEALTH & SAFETY Sponsored by.
FIDIC 2005 Beijing Workshop 13 Design - Build Opportunities and Challenges in Australasia Tony Barry, President Association of Consulting Engineers Australia.
CFL Assignment LI HARRIS. Change For Life, What is it?  Change for life is a Project that promotes healthy eating and exercising they have signed up.
100 Days of Safety AustStab Awards of Excellence 2014 FK Gardner & Sons Group Occupational Health and Safety Best solution to an identified workplace health.
Constructing West Midlands Martin Merrix Divisional Manager, Urban Design.
DST Output: the environment and the print industry Lucy Klinkenberg Environmental Manager DST Output.
AGNICO-EAGLE MEADOWBANK PROJECT - UPDATE JULY AGNICO-EAGLE MINES CHESTERFIELD INLET MEADOWBANK SHIPPING PROGRAM 2007.
David Jurd – Managing Director, Abigroup Ian Luck – Managing Director, Baulderstone David Marchant – Managing Director, Conneq Core Competencies and Growth.
Bentley Civil - What Users Say “Track design for a stretch of 8 Km which used to take more than 6 months, was completed in less than 3 months with solutions.
Biomass CHP Project at Pilgrim Hospital Boston United Lincolnshire Hospitals NHS Trust.
Morphettville Racecourse Sandtrack Rehabilitation Works AustStab Awards of Excellence 2013 South Australian Jockey Club Innovation or Excellence in Sustainability.
Energy Star. How energy star products help the consumer Save money Save energy Reduce carbon footprint.
CITY OF PALM SPRINGS CITYWIDE ENERGY INFRASTRUCTURE UPGRADE PROJECT THE BUSINESS CASE FOR PROJECT APPROVAL Larry Baebler Chevron Energy Solutions October.
1 Creating long term sustainable value in urban infrastructure Mark Brown, Amey December 2013.
Environmental Solutions for a Greener Planet Master Distributor for IHS.
Valla Road Nambucca Shire Council AustStab Awards of Excellence 2013 MidCoast Road Services Innovation or Excellence in Stabilisation in Local Government.
Melbourne Airport – Delta Infill GSE AustStab Awards of Excellence 2014 Negri Contractors VIC Innovation or Excellence in Sustainability Sponsored by.
The Outlook for Energy Midwest Brand Meeting April 19, 2006 Midwest Brand Meeting April 19, 2006 J. Patrick McGinn Manager, Midwest Public Affairs J.
(T) (F) (m) The Underground Bin Company Presenting to:
Cultural change through the implementation of accredited safe work systems Submission by Accurate Asphalt & Road Repairs Pty Ltd to AUSTSTAB Awards for.
Enhanced Knowledge & Education AustStab Awards of Excellence 2013 CPEE (Centre for Pavement Education) - Excellence in Research or Education Sponsored.
FHWA’s Research and Development Programs John McCracken, Chief Science Officer and Research Program Manager, Infrastructure R&D U.S. Federal Highway Administration.
By: Brian Kaufman.  the total set of greenhouse gas (GHG) emissions caused by an organization, event, product or person.  Greenhouse gases can be emitted.
Research – making innovation mainstream AustStab 20 th Annual Conference Excellence in Research or Education.
The Intelligent Energy Europe programme supporting the AENEAS project Vincent BERRUTTO Head of Unit European Commission Executive Agency for Competitiveness.
Leading global excellence in procurement and supply Sustainable Growth in Products & Services 22 nd March 2013 Duncan Brock, Customer Relationships Director.
Abigroup Contractors Stanley Street Plaza, Southbank Ph: Web: Simon Gibson – HR Officer Evan Maughan – L&D Officer.
Rebuilding our regional centres in the context of the NDRRA Matt Bradbury, Partner Ben Yeoh, Senior Associate 11 October 2012.
Establishing Pavement Strength HTC INFRASTRUCTURE MANAGEMENT LTD.
Telecommuting Jobs a Better Option To Earn More !
Do you know? By 2015, an estimated 40-48% of new non-residential construction by value will be green, equating to a $ billion.
Transition to ISO – OHS Management Systems AustStab Awards of Excellence 2016 Stabilised Pavements of Australia Pty Limited Category 1 – Occupational.
Regional Monitoring Programme Developments to Date
Collaborative contracting Highways Term Maintenance Association
AN Opportunity through BIG DATA
Road pavements and Asset management
Feasibility Study to Evaluate Brick Aggregates and Foam Bitumen treated RAP for Pavement Design and Construction of NH-44 in Tripura.
Partnership Townsville City Council & Stabilised Pavements
EU Research and Innovation: Horizon 2020
THE UPGRADE OF 33.7 KM OF NATIONAL ROUTE N2, BETWEEN MTUNZINI TOLL PLAZA (SECTION 28, KM 42.7) AND EMPANGENI T-JUNCTION (SECTION 29, KM 13.0) CONTRACT.
Malcolm Simms 16 November 2016.
Team 1 Design Team 4 Inc Team 3 LLC Team 7 Global Team 11 Design
Santos – upstream developments
Sodexo delivers services…
Defining the requirements for enhanced transport connectivity
PORTFOLIO COMMITTEE ON TRANSPORT
Anglian Water Services Ltd
Future budget trends:MTEF
Sustainable Asset Management An industry perspective by AAPA
Presentation transcript:

Fluor K132 (Santos) Contract – Dawson’s Bend Road AustStab Awards of Excellence 2013 FK Gardner & Sons Pty Ltd Innovation or Excellence in Sustainability in Pavement Stabilisation Sponsored by

The Project Part of Santos’ $18.5 billion GLNG CSG venture Consists of new roads and upgrades to existing roads at the Fairview gas fields Dawson’s Bend is a 17km long critical road at the heart of the gas field required to provide access for the installation of infrastructure

The Problem Local quarry, Burnt Gully, was no longer able to provide the required CBR 35 material Another quarry 70km away was determined as a potential new source of material The material would require crushing and transport to the site at significant cost to the client

The Solution FKG undertook laboratory testing on Burnt Gully material of CBR 10 mixed with cement Results showed that a 1% cement modification could provide in excess of CBR 45 This would result in a shortened programme and reduced cost

The Outcome The solution saved the client in excess of $1 million over the life of the project It meant fewer trucks on the road and a reduced carbon footprint FKG conducted FWD testing and determined a 20+ year design life FKG delivered value for money and a more sustainable result