NRC Risk-Informed and Performance-Based Initiatives

Slides:



Advertisements
Similar presentations
Regulatory Implications of Fukushima for Nuclear Power Plants in the U
Advertisements

Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
Presented by: Muhammad Ayub Pakistan Nuclear Regulatory Authority Safety Enhancement at Nuclear Power Plants in Pakistan Prospects of Nuclear Energy in.
Safety Management Systems CAA Update. Scope  Background  Benefits  Policy development / RIS  NPRM  Advisory Circular  Sector engagement & participation.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
Why a safety culture matters (Attributes and Issues) Michael Corradini Nuclear Engr. & Engr. Physics University of Wisconsin, Madison WI.
The 2002 Davis Besse Event and Safety Culture Policy at the U.S. Nuclear Regulatory Commission Stephanie Morrow, Ph.D. Safety Culture Program Manager Office.
“Regulatory Risk-Informed Activities and Supporting PRA Technical Acceptability” Presented to Nuclear Energy Standards Coordination Collaborative (NESCC)
RISK INFORMED APPROACHES FOR PLANT LIFE MANAGEMENT: REGULATORY AND INDUSTRY PERSPECTIVES Björn Wahlström.
ANS RESPONSE TO FUKUSHIMA LESSONS LEARNED Presented to: NESCC November 29, 2012 Washington D.C. Donald J. Spellman, Chair ANS Standards Board American.
Summary of Draft NEI Guidance - November 6, GUIDELINES FOR PRIORITIZATION AND SCHEDULING IMPLEMENTATION Pre-Draft 1 – September 30,
ACADs (08-006) Covered Keywords Description Supporting Material Accident Analysis
US NRC Protective Action Recommendation Study National Radiological Emergency Preparedness Conference April 10, 2008 Las Vegas, NV Randy Sullivan, CHP.
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
6/23/2015 Risk-Informed Process and Tools for Permitting Hydrogen Fueling Stations Jeffrey LaChance 1, Andrei Tchouvelev 2, and Jim Ohi 3 1 Sandia National.
1 Regulatory Challenges During and Following a Major Safety or Security Event Muhammad Iqbal Pakistan Nuclear Regulatory Authority Presentation at General.
Protection Against Occupational Exposure
IAEA International Atomic Energy Agency US NRC Approach for Seismic Hazard Assessments INTERNATIONAL WORKSHOP ON LESSONS LEARNED FROM STRONG EARTHQUAKES.
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
NEI Presentation on Nuclear Decommissioning Trust (NDT) Use Concerns.
NRC Leadership Expectations and Practices for Sustaining a High Performing Organization NRC Commissioner William C. Ostendorff FR/SSO/FS Workshop U.S.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
Performance Assessment Issues in Waste Management and Environmental Protection Annual Meeting of the Baltimore-Washington Chapter of the Health Physics.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
IAEA - Department of Nuclear Safety & Security
1 The U.S. NRC’s Reactor Certification and Licensing Process – Meeting the Challenge? Commissioner Peter B. Lyons U.S. Nuclear Regulatory Commission 15.
1 Human Performance in Reactor Safety George E. Apostolakis Massachusetts Institute of Technology Presented at the Quality Colloquium,
Energy Forum 2011, Changing the Energy Paradigm and Outlook for South-Eastern EU Energy Forum 2011 Nuclear Safety Regulation in Romania Recent Developments.
UCS Perspective on Expedited Transfer of Spent Fuel to Dry Casks January 6, 2014 Dr. Edwin S. Lyman Senior Scientist Union of Concerned Scientists.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
1 American Society of Quality September 20, 2005 Presented by Linda Smith USNRC Region IV.
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
1 RIC 2009 NFPA 805 Regulatory Infrastructure Development Steven A. Laur, PE Sr. Tech Adv. Risk-Informed Initiatives NRC Office of Nuclear Reactor Regulation.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Jacques Vanier ICAO EUR/NAT Regional Officer Almaty, 5 to 9 September 2005 SAFETY MANAGEMENT SYSTEMS SAFETY PERFORMANCE.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Overview of Risk Informed Inspection Workshop Information IAEA Workshop City,
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making PSA Applications Methodologies and Approaches. Status in OECD Countries Workshop.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Proposed Fire Risk Meter Workshop Information IAEA Workshop.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
Safety of At-Reactor High-Density Storage of Fuel in Pools Steve Jones Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission International.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Qualitative and Quantitative Criteria for RIDM Stanislav Husťák Nuclear Research Institute Řež plc, Czech Republic Reliability and Risk Department INFRA.
International Atomic Energy Agency Implementation of a Risk-Informed Approach into the Legislative and Regulatory Framework SNRCU Annual Topical Meeting.
1.9. Safety assessment “School for Drafting Regulations on Radiation Safety, IAEA - Module 1 Regulatory framework for safety, authorization and inspection.
United States Nuclear Regulatory Commission NRC’s Risk-Informed and Performance- Based Approach to Decommissioning DOE Workshop on Risk-Based End States.
FLEX Mitigation Strategies Overview (Rec 4.2) Fukushima Regulatory Response Workshop April 5, 2012.
Version 1.0, May 2015 SHORT COURSE
ACRS Subcommittee Meeting August 15, 2012 by Interoffice Working Group
An Overview on Risk Management
Chapter 7 Thermal-hydraulic Issues in RIR
South Carolina Perspective on Part 61 Proposed Revisions
Flooding Walkdown Guidance
NRC Cyber Security Regulatory Overview
U.S. Nuclear Regulatory Commission Radiation Safety Standards
Communication and Consultation with Interested Parties by the RB
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
Research and Test Reactor Safety: The Regulatory Perspective
Industry Input on NRC’s Low-Level Waste Program Strategic Assessment
USNRC IRRS TRAINING Lecture18
Presentation transcript:

NRC Risk-Informed and Performance-Based Initiatives Commissioner George Apostolakis U.S. Nuclear Regulatory Commission CmrApostolakis@nrc.gov American Nuclear Society Northeastern Section Foxboro, MA April 30, 2013

The Pre-PRA Era Management of uncertainty (unquantified at the time) was always a concern. Defense in depth and safety margins became embedded in the regulations. Design Basis Accidents (DBAs) are postulated accidents that a nuclear facility must be designed and built to withstand without loss to the systems, structures, and components necessary to assure public health and safety.

Some Problems There is no guidance as to how much defense in depth is sufficient DBAs use qualitative approaches for ensuring system reliability (the single-failure criterion) when more modern quantitative approaches exist DBAs use stylized considerations of human performance (e.g., operators are assumed to take no action within, for example, 30 minutes of an accident’s initiation) DBAs do not reflect operating experience and modern understanding

Technological Risk Assessment (Reactors) Probabilistic Risk Assessment (PRA) supports Risk Management by answering these questions What can go wrong? (thousands of accident scenarios are investigated, as opposed to the limited number of DBAs) How likely are these scenarios? What are their consequences? Which systems and components contribute the most to risk?

Risk-informed Regulation “A risk-informed approach to regulatory decision-making represents a philosophy whereby risk insights are considered together with other factors to establish requirements that better focus licensee and regulatory attention on design and operational issues commensurate with their importance to public health and safety.” [Commission’s White Paper, USNRC, 1999]

Risk-Informed Framework Traditional “Deterministic” Approach Unquantified probabilities Design-basis accidents Defense in depth and safety margins Can impose unnecessary regulatory burden Incomplete Risk-Based Approach Quantified probabilities Thousands of accident sequences Realistic Incomplete Risk-Informed Approach Combination of traditional and risk-based approaches through a deliberative process

Reactor Safety Study (WASH-1400; 1975) Prior Beliefs: Protect against large loss-of-coolant accident (LOCA) Core damane frequency (CDF) is low (about once every 100 million years, 10-8 per reactor year) Consequences of accidents would be disastrous Major Findings Dominant contributors: Small LOCAs and Transients CDF higher than earlier believed (best estimate: 5x10-5, once every 20,000 years; upper bound: 3x10-4 per reactor year, once every 3,333 years) 3. Consequences significantly smaller 4. Support systems and operator actions very important

At Power Level I PRA Results CDF = 4.5x10-5 / yr Initiator Contribution to CDF Total: Internal Events…………………..56% External Events ………………….44% Seismic Events 24% Fires 18% Other 2% External events contribute SIGNIFICANT portion of risk, especially if weather-related LOSP and internal flood are viewed as “external” events. Important to quantify FULL scope.

Quantitative Safety Goals of the U.S. NRC (August, 1986) The prompt fatality goal applies to an average individual living in the region between the site boundary and 1 mile beyond this boundary. The latent cancer fatality goal applies to an average individual living in the region between the site boundary and 10 miles beyond this boundary.

PRA Model Overview and Subsidiary Objectives CDF 10-4/ry LERF 10-5/ry QHOs Level I Level II Level III PLANT MODEL CONTAINMENT MODEL SITE/CONSEQUENCE MODEL Results Accident sequences leading to plant damage states Results Containment failure/release sequences Results Public health effects SCOPE Internal Events External Events PLANT MODE At-power Operation Shutdown / Transition Evolutions Uncertainties

Evolution of the Risk-Informed Regulatory System Regulatory Requirements ATWS Rule (1984) Station Blackout Rule (1988) Maintenance Rule (1991) Risk-Informed Changes to the Licensing Basis Regulatory Guide (RG) 1.174 (1998) Technical Specification Improvement Initiatives Risk-Informed Inservice Inspection Special Treatment/Categorization (“Graded QA”) Reactor Oversight Process (2000) Fire Protection (2004) New Reactor Licensing (2007)

Risk-Informed Changes to the Licensing Basis (RG 1.174; 1998) Integrated Decision Making Comply with Regulations Maintain Defense-in- Depth Philosophy Maintain Safety Margins Risk Decrease, Neutral, or Small Increase Monitor Performance

Benefits Improves Safety Makes regulatory system more rational New requirements (SBO, ATWS) Design of new reactors Focus on important systems and locations Makes regulatory system more rational Reduction of unnecessary burden Operating experience accounted for in regulations Consistency in regulations Encourages performance-based regulation Maintenance rule Fire protection Determination of seismic design basis motion

Fukushima Near-Term Task Force Recommendation 1 Establish a logical, systematic, and coherent regulatory framework for adequate protection that appropriately balances defense in depth and risk considerations. Draft a Commission policy statement that articulates a risk-informed defense-in-depth framework that includes extended design-basis requirements in the NRC’s regulations as essential elements for ensuring adequate protection.

NTTF Recommendation 1 – Regulatory Framework Staff developing Options for potential changes to the regulatory framework Industry input/proposal expected April 2013 Substantial additional stakeholder interaction planned NRC staff developing paper for Commission ?? Beyond design basis requirements Risk Management Task Force (NUREG-2150) ?? ?? Recommendation 1

Risk Management Task Force (RMTF) Task Force formed in February 2011 “To develop a strategic vision and options for adopting a more comprehensive and holistic risk-informed, performance-based regulatory approach for reactors, materials, waste, fuel cycle, and transportation that would continue to ensure the safe and secure use of nuclear material.”

A Proposed Risk Management Regulatory Framework Mission Ensure adequate protection of public health and safety, promote the common defense and security, and protect the environment Objective Manage the risks from the use of byproduct, source and special nuclear materials through appropriate performance-based regulatory controls and oversight Risk Management Goal Provide risk-informed and performance-based defense-in-depth protections to: Ensure appropriate barriers, controls, and personnel to prevent, contain, and mitigate exposure to radioactive material according to the hazard present, the relevant scenarios, and the associated uncertainties; and Ensure that the risks resulting from the failure of some or all of the established barriers and controls, including human errors, are maintained acceptably low Decision-Making Process Use a disciplined process to achieve the risk management goal: Identify issue Identify Options Analyze Deliberate Implement Decision Monitor

Operating Reactor Recommendations The set of design basis events/accidents should be reviewed and revised, as appropriate, to integrate insights from the power reactor operating history and more modern methods such as PRA. NRC should establish via rulemaking a design enhancement category of regulatory treatment for beyond-design-basis accidents. This category should use risk as a safety measure, be performance-based (including the provision for periodic updates), include consideration of costs, and be implemented on a site- specific basis.

Design Enhancement Characteristics Who decides what is included? NRC specifies initiators or scenarios Licensees use site-specific PRAs What criteria are used for inclusion? Initiating events with frequency greater than xx Accident sequences with frequency greater than yy Cost-beneficial rules Proposed Design Enhancement Category What criteria are used for disposition? Risk less than zz ALARA Combination

Proposed Regulatory Framework: Power Reactors Design basis event? Adequate protection rule? Current cost-beneficial safety enhancement rule? Included risk-important scenario? Adequate Protection Category Proposed Design Enhancement Category Remaining scenarios Proposed Residual Risk Category

Challenges A change would be required within the agency and externally to increase understanding of the value and use of risk concepts and the risk management language The proposed risk-informed and performance-based concept of defense in depth may require the development of additional decision metrics and numerical guidelines The approach would likely require developing new or revised risk- assessment consensus codes and standards Consideration of cost in the design-enhancement category in the power reactor regulatory program would necessitate a reconsideration of the agency’s tools for performing cost-benefit analysis A long-term commitment from the Commission and senior agency management would be required for implementation