Robot Quick Build Session Frame Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma.

Slides:



Advertisements
Similar presentations
Adding Gears to the NXT Taskbot
Advertisements

Sectional Assembly and Installation
CRIMPING Introduction
NXT 2-Motor Car Adapted from Physics by Design, Second Edition, by Barbara Bratzel, College House Enterprises, 2007 MAXA ROBOTICS 2011.
Instructions for making plunger fork tool. Drawing for the trigger assembly.
Michael Long– Eagle Project - Exhibit D-1 Plans/Drawings – Top View
BumperBot uses two contact switches to go through a labyrinth. Bumper.
TWO (2) Installation principles 1. Cabinets need to be installed straight, plumb, and level. 2. The area you are working in is rarely straight, plumb,
Robot Quick Build Session Transmission Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to.
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
RockOn! Canister Integration RockOn! 2009.
Installing a double Dreamscreen. Check measurement Left.
Representor: Yoo D. Moon Date : November 25, 2008.
Breaking, Measuring, and Adjusting Chain ~The most used drive system on a FIRST robot uses chains and sprockets. Understanding the proper techniques to.
Peppermill Demo Bayou Woodturners Demonstrator Jim Shackelford November 2009.
Build the Tumbler.
Here is the broken line. Step 5: Break loose encasing seal. With bar in vice as show, hit with hammer to break loose. Usually 2 or 3 hits will break loose.
Presented by Team 3350 (T-BOTS).  Students should lead their teams in the building, design, and all other aspects of the robot.  Knowledge of the Kit.
Machining a V-Block Flexible Manufacturing Copyright © Texas Education Agency, All rights reserved. 1.
Laser Enclosure to Elevated Rail Assembly Wyman Gordon Forging Locator Original Revision: 2/14/2013.
Cutting With a Jeweler’s Saw
C-Base Transmission Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Volvo 270 Outdrive R&R (for bellows replacement)
Trinity Highway Products Properly Installed SRT Post HBA System-Slotted Rail Terminal
Yamaha oil pump rebuild
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Assembly Instructions Additional documents needed for Assembly: GA Drawings on all Units Header Platform GA Drawings Motor Deck Platform GA Drawing Packing.
Air tank installation instructions Included parts: Raw aluminum air tank bracket 5/16-18 button head bolts (qty 4) M8x1.25 button head bolts (qty 4) M8.
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
How to Construct a Robot Part 7: Wiring and Controller Installation Copyright © Texas Education Agency, All rights reserved. 1.
Building a Computer Kate Chapin Capstone Project.
Universal Guide Installation Please read and understand the installation instructions fully before proceeding.
Showing Demonstrations on the TV How to connect the camera to our TV set.
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
Robot Quick Build Session RQBS Intro - Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma.
Title: Corvette C5 Column Lock Bypass Originator: John Neese Date: 30 Jan 2005 Revision: Sheet: 1 of 6 Column Lock Bypass.
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
General Instructions for “KidWind Light” wind tunnel.
Introduction Produced by Ron Markum, Team 1750 Ed Latimer, Team 476 Ken York, Team
BullBot is bull robot that can have bull fight with techniques of butting or lifting. Learn how bull fight, Korean traditional game, had started and kinds.
Quick Build - Mechanical The University of Memphis.
Build a Simple Electric Motor Uses a stator made of windings, an armature with two coils, and a commutator.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
Robot Quick Build Session Programming Session Produced by Ken York, Team 476 Ed Latimer, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma State.
Introduction Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Beginning Chassis Build Season. Parts List Structure 2x20 Beam (2) 2x16 Beam (4) 2x10 Beam (2) Large Chassis Connector (20) 1x1 Connector Pin.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
1 Equilibrium The Balancing Robot By: Kerry Scharfglass Whiz Kid.
WeldingRod’s Exactly Constrained 3D Printer Plate Identification and Stuffing.
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
Build A Motor You must follow the directions step-by-step!
STEP 1: ASSEMBLE INSERT PLATES 1.Assemble insert plates by press fitting roller bearing and adapter plate into assembly 1.1 Prep all mating surfaces to.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Assembly of steering.
VIEW SERIES with Sliding Door
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
Rear end assembly.
Bilge Pump Service Project Model Service Kit
2017 PWNAGE 8WD WCD CHANIN IN-TUBE CHASSIS ASSEMBLY INSTRUCTIONS
2.2 Gallon TourTank Installation
Teacher training resource: Robotic Assembly
Building a Nightstand Woods 1 Final Project Step #1
How to Change a Flat Tire
FIRST Long Island Presented by School-Business Partnerships of Long Island, Inc.
Mounting a BalanceBox®650 to a brick wall
CAD Assemblies
BUILDING AN AUTONOMOUS QUADCOPTER.
Presentation transcript:

Robot Quick Build Session Frame Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma State University College of Engineering, Architecture, and Technology

Frame Assembly Instructions Step 1 – Watch the instructional video(s) for assembling the C-base frame on Step 2 – Proceed with putting the frame together. You can use the video(s) in ‘pause’ mode, or you can use this presentation. You will make a 27” wide x 37” long kitbot frame.

Final Product Picture You will be making a 27” x 37” robot: 27” front and back, with 37” sides

This is what you should have: 4 original rails, 2 rails cut to 27” Save the 8” cut pieces for this year’s robot ….. File the ends after they are cut. Have 2 of the 6 rails cut at the cutting station to make them 27” long. There is a reference hole marking this location on each rail.

Insert the frame connectors into the end holes of the 4 long rails (not the 2 cut ones) until you can get a 1.75” long frame bolt through the ‘ears’ on the connector. It is a tight fit so you might have to tap them in. Put the nylock nuts on but do not tighten them yet. Repeat for both ends of all 4 long rails. Leave the nylock nuts loose. Notice: The orientation of the bracket is not correct in these PowerPoint slides. See the andymark.biz video.

Repeat to assemble the inner frame. When you are done it should look like this. 27” cut rail Long rail This frame connector goes in the 4 th and 5 th holes from the end of the cut rail. Install Nylock nuts but do not tighten.

Use a non-mar hammer for the bearings; if not available, cushion the hammer taps with a block of wood or similar material. Make sure the bearings are bottomed-out in the wheel hub recess. They should only stick out about 1/8” inch. Be sure and add the spacer! It will keep the chain from rubbing the wheel.

Use a low clutch setting on the drill to avoid stripping the threads in the plastic. Self-tapping screws, 1” long (from the ‘sandwich’ bag); 3 per wheel is sufficient. You only have to put sprockets on 2 wheels today, but you can put all 4 on if you think you want to try 4- wheel drive later.

Gather these parts. Assemble the other wheel, reversing the spacers if you intend to try 4-wheel chain drive later. If not, the spacer order does not matter as long as you use one long and one short. Long outer rail End rail Make sure the sprocket faces the inside of the frame (Note: You cannot see the sprocket in this view) Short spacer Long inner rail Long spacer

Push the frame connectors into the end rails and bolt them up. Note: If the frame connectors on the long rails do not go in far enough to get the frame bolts through, you may not have driven the wheel bearings in all the way. Disassemble and correct. Tighten all the frame bolts! Notice the staggered sprocket pattern of the two wheels to allow for optional 4-wheel chain drive later.

Measure where the chain needs to be cut: drape the chain over both sprockets, slide the transmission to the end of its slots, and identify the link to cut. If you have never measured or cut chain before, ask a mentor to help you. Motor closer to the center of the robot. Push to the end of the slot. Late Change: Loosen these two bolts so the angle bracket is loose during installation. See the andymark.biz video. Attach the transmissions using the short ¼-20 screws and put the nylock nuts on loose. The exact location of the transmission box on the frame is not critical but it should be 1/3-1/2 of the way down the frame for this lay-out. You can change this at a later date if you want. Note: There should be ‘left’ and ‘right’ transmissions made so that the motors are both towards the center of the robot for better weight distribution. But this is not critical.

Use a 3/8” chain break to cut the link. It should look like this after using the chain break. Drive the pin out the rest of the way with a punch. This is best done over the open jaws of a vise if you have one; if not, one of the holes in the frame will do……. Here is the chain cut in two.

Install the chain over the two sprockets and connect it using a master link. Have a mentor help you if you have never done this before.

Push the transmission box to tighten the chain and then tighten all 4 bolts. Repeat for the other side, remembering it is preferred to have the motors face each other and be towards the center of the robot. If your transmissions are not left/right this is OK as it is only for better weight distribution. If you want, you could have the Transmission Team change the motor orientation – it’s not that hard.

Finished robot frame below. You cannot continue until the Electronics Team is ready with their board. Note: Hold onto the (3) ¼-20 x 1.75” bolts and Nylock nuts that were in your ‘sandwich’ bag. You will need them to help mount the electronics board to the frame.