The European Union’s CARDS programme for the Balkan region – Contract No. 52276 This project is funded by the European Union Regional Electricity Balkan.

Slides:



Advertisements
Similar presentations
World Bank and SPS With special emphasis on the recently established multi-donor Standards and Trade Facility Cees de Haan Agriculture and Rural Department,
Advertisements

Permanent High Level Group meeting Athens, September 9 th, 2003 Towards a Standard Market Design for the SE Europe Electricity Market Prof. P. Capros,
2 nd Workshop MFG, , Bucharest The current status on the Market Design of the SEE REM and the way forward.
Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
Bente Danielsen, ERGEG Transparency Project Team leader Alain Taccoen, ENTSO-E WG Market Information and Transparency, convenor Florence Forum June 2010.
Gas Development Master Plan Steering Committee Meeting – 28 March 2013 GDMP Overview.
Electricity Security of Supply European System Adequacy Forecast XV Florence Forum, November 2008.
Hydropower Development: Experience of Nepal
Basic Considerations  outlines the process by which the Government of Kenya will develop its national strategy for participating in an evolving international.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
The current overall EU policy framework: Europe 2020 strategy, Innovation Union and Energy 2020 Strategy On March 2010, the Commission presented a Communication.
Integration of Regulatory Impact Assessment into the decision making process in the Czech Republic Aleš Pecka Department of Regulatory Reform and Public.
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
A PROCUREMENT ASSESSMENT MODEL Joel Turkewitz World Bank April 2003.
The Knowledge Resources Guide The SUVOT Project Sustainable and Vocational Tourism Rimini, 20 October 2005.
RCC meeting Gas Regional Investment Plan project TITRE 18/10/2012 RCC meeting Gas Regional Investment Plan project CRE.
1 M ESH PROJECT : P RODUCTION OF A M ANUAL FOR S TATISTICS ON E NERGY C ONSUMPTION IN H OUSEHOLDS Developing energy consumption data to meet users needs.
Economic Transmission Case Study: Champlain Wind Link Vermont System Planning Committee March 10, 2010.
Review of eStorage’s first year results WP3 Benefits of Storage and Regulatory Framework & Market Design 30 October 2013 Wim van der Veen - DNV KEMA.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
Project Implementation Monika Balode Joint Technical Secretariat Lead Partner Seminar 16 October 2009, Šiauliai.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
 Strong reforms underway in Serbia, still numerous challenges ahead  Importance of setting priorities within national agenda  Joint efforts of all.
Experiences as a ER buyer and a general outlook Olle Björk Swedish Ministry of Sustainable Development Washington
Rome Energy Meeting 2008 Rome, November 2008 Investments Opportunities and Project Finance in the Energy Market Luigi Marsullo President Finpublic.
Developing the New Zealand Energy Strategy IPS Roundtable Series on energy sustainability 4 August 2006 Stuart Calman.
The Draft SADC Annex on Trade in Services UNCTAD Secretariat Sub-regional Conference on Improving Industrial Performance and Promoting Employment in SADC.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
Joanna Fiedler Enlargement and Neighbouring Countries Unit DG Environment European Commission REReP → RENA Vision of the European Commission PEIP Regional.
1 18-Month Outlook October March 2005 Presented by Greg Hine IMO Long-Term Forecasts and Assessments.
Tradable green certificates ASCerT Sandor MOLNAR REEEP - REC Workshop Szentendre 2003.
INTRODUCTION TO THE UNIDO/REEEP TRAINING MANUAL ‘SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA’ User Manual.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
Green Investment Schemes: Maximizing their benefits for climate and society Diana Urge-Vorsatz 24th. April.2008.
Regional Training/Consultations on Capacity Development for Sustainable Growth and Human Development in Europe and CIS Application of Capacity Development.
Stationary and Area Source Committee Update OTC Committee Meeting September 13, 2012 Washington, D.C. Hall of the States 1.
Forest Carbon Partnership Facility (FCPF) Readiness Procedures July 9, 2008.
XIV th Florence Forum 24/25 September 2007 Tahir Kapetanovic / Nicolas Bonnesoeur Chairmen of the CEER Electricity Security of Supply TF C07-SOS-03-03a.
Ms. Tshilidzi Ramuedzisi Chief Director: Energy Planning Integrated Energy Plan: Introduction and Background 1.
Reliable Power Reliable Markets Reliable People Transition of Authoritative Documents – Information Session September 2009 Doyle Sullivan Evelyn Kelly.
Stabilisation & Association Process: the EU Policy for South East Europe Brussels December 2004.
Proposed Analytical Approach - Modeling Phase 3 - Formation of new team December 9, 2003 Steering Committee Presentation.
Draft of Terms Of Reference For Hiring a Consultant “Study for establishing the regulation and tools in implementing of DG connection to distribution network”
1 IFRERA first year meeting July 2005 Lyon IFRERA Progress meeting and workshops Lyon 20 – 22 July 2005.
REPUBLIC OF MACEDONIA STATUS REPORT ON MEETING THE COMMITMENTS OF THE ATHENS MOU SEEERF IV PERMANENT HIGH LEVEL GROUP MEETING Athens, Greece September.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
MINISTRY OF EUROPEAN INTEGRATION General Directorate for Regional Development Regional Policy and Pogramming Directorate REGIONAL OPERATIONAL PROGRAMME.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Utilities’ Update on Energy Savings Assistance Program Studies Ordered in D LIOB Meeting August 21, 2013 Sacramento, California.
Goran Majstrovic Davor Bajs Energy Institute HRVOJE POŽAR Croatia PREPARATION FOR LARGE SCALE WIND INTEGRATION IN SOUTH EAST EUROPE Joint TSO.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
IV Athens Forum 3-4 June 2004 Towards a GAS market in the South East Europe Fabio Tambone – Sergio Ascari WG CEER SEEER.
European Developments Transmission Workgroup 1 st December 2011.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
Status Report of the Electricity Regional Initiative Ms Asta Sihvonen-Punkka ERGEG Electricity Focus Group (EFG) Chair The Regional Initiatives: Progress.
The regulators’ role in integrating non-market related environmental goals in energy markets Finn Dehlbaek, Deputy Director, Danish Energy Regulatory Authority.
Dr. Nyamajeje C. Weggoro Director, Productive and Social Sectors EAC Secretariat THE DAR ES SALAAM-TANGA- MOMBASA NATURAL GAS PIPELINE AND EAST AFRICAN.
Croatia: Result orientation within the process of preparation of programming documents V4+ Croatia and Slovenia Expert Level Conference Budapest,
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
Nordic transport infrastructure market – modelling and forecasting methods for asset management and business development Markku Riihimäki, Pekka.
Integrated policy frameworks
Eastern European Partner countries
Gas Regional Initiative
ASSTAR Project Overview & User Forum Objectives
Marine Strategy Framework Directive (MSFD)
Integrated Energy Plan: Introduction and Background
Marine Strategy Framework Directive (MSFD)
Presentation transcript:

The European Union’s CARDS programme for the Balkan region – Contract No This project is funded by the European Union Regional Electricity Balkan Infrastructure Study (REBIS) & Generation Investment Study (GIS) Progress Reports, 22 October 2003 This project is realised by the PwC Consortium

PwC Consortium2 REBIS – Amended ToRs Since the Athens process meeting in Rome, the TORs of the REBIS work have been amended. The overriding objectives of the work are the: 1.Production of a report on the progress achieved in the creation of national and regional market rules enabling a functional regional market and; 2.Identification of what work, if any, remains to be completed. The GIS study has been incorporated into the overall project scope.

PwC Consortium3 GIS – current status Work to be undertaken by PwC, CMcK, Atkins, MWH, SEEC and Adica consulting. The interactions between regional market development (under REBIS) and priority investments (under GIS) captured through the involvement of the Consortium in the two separate strands of the project. Administrative delays in finalising of contract Work is being part-funded by the original REBIS Consortium

PwC Consortium4 REBIS – Activities to date First engineering data gathering visits undertaken in July 2003 and responses to the detailed technical questionnaire are being received. 11 questionnaires distributed, a few still outstanding. Major objective: –to understand the current infrastructure, limitations and management –to formulate approach to improvement to match REM requirements –to modify ideal market requirements to something manageable within current and future technical constraints.

PwC Consortium5 REBIS – Next steps Commercial and legal meetings scheduled mid-November in the region. –Invitations currently being sent out to ministries, regulators, TSOs and utilities. –Objectives to understand current position and expected developments and to explain commercial and legal questionnaires. Draft commercial and legal questionnaires developed. –To be finalised and issued to recipients in November –Objective to provide information to underpin understanding of current and planned developments within beneficiary countries and region We aim to derive draft proposals during Q for refinement during the remainder of the year.

PwC Consortium6 GIS - Aims Two main strands of the GIS work: 1.demand forecast; 2.generation and infrastructure requirements assessment. Focus on CARDS countries Also covers Romania and Bulgaria Consultation with Donors and recipient countries through Athens process forum.

PwC Consortium7 GIS - Deliverables Demand deliverable: comprehensive demand forecast, which takes into account impacts of reform, and most recent projections and uncertainty associated with economic growth in the region. Reliant on factors such as: 1.Historic demand data 2.Economic data for beneficiary countries; 3.Price elasticity of electricity demand 4.Impact of energy efficiency measures.

PwC Consortium8 GIS - Methodology Generation and infrastructure requirements assessment to be undertaken using WASP and GTMax software packages, which have been extensively used in the region. Deliverables: alternative development options based on: 1.Least cost plans for national utilities without the benefit of regional co-operation; 2.Unconstrained least cost development plan for all regional power systems participating in the SEE REM; 3.Detailed market simulation for 2010 and 2015 to consider operating conditions in the SEE REM based on the candidate projects identified in the regionally integrated scenario.

PwC Consortium9 GIS - considerations Locational marginal pricing: –Assess the potential for “approximately similar LMPs” –Important to define LMP clearly –Consider added value of later investments to achieve similar LMPs when compared to uniform prices. Use of previous analysis: –Maximise use of previous work undertaken in the region –Meet with Donors to ascertain data and analysis availability –Liaise with other consultants on concurrent studies

PwC Consortium10 GIS – Anticipated Consultation Two general workshops for stakeholders, both linked to Athens process meetings. At the first, in approximately 6 months, we anticipate discussing the demand forecast and the alternative power supply options. At the second, in approximately 11 months, we expect to discuss the draft final report including the final results of the demand forecast and the results of the generation expansion analysis.