The Crippled Team The Story of CONFIRM CS 524 – Software Engineering Dr. Sheldon X. Liang 18 Sept 2007 Darryl Nakata.

Slides:



Advertisements
Similar presentations
ER Tutorial 2 Chapter 9 - Questions 3, 4 and 5 V3.0 Napier University Dr Gordon Russell.
Advertisements

ScreenACT INFORMATION SESSION. On the Agenda ACT Screen Development Fund Cannes 2015 Screen Industry Pod.
 IRS Regulations - $.560 per mile (eff 1/1/14)  From official travel base or point of departure – whichever is closer to destination  Multiple destinations.
Anatomy of 4GL Disaster CS524 - Software Engineering I Fall I, Sheldon X. Liang, Ph.D. Nathan Scheck CS524 - Software Engineering I Fall I, 2007.
Your executive Partner in achieving Project Management Excellence IBCL-PMI - Project Management & Outsourcing Seminar use only Outsourced.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Seven Cert IV - M. S. Martin March 2012.
Poor Performance in Implementation Mike Rickman CS524 – Software Engineering Azusa Pacific University Dr. Sheldon X. Liang.
NEES Project Management Workshop June 16 June 18 1 Segment 2.
Grant implementation STOP TB workshop December 2005.
Chapter 11 Software Development Horror Stories. Sampling of Software Problems = Faye Starman gets an electric bill for $6.3 million instead of $63 due.
Facilitate by: Mr. Ok Libounna Director for Financial Affair, Church World Service (CWS)
Software engineering Module 1 -Introduction to software process Teaching unit 1 – Requirements engineering Ernesto Damiani Fee University of Bozen-Bolzano.
Effective Project Management: Traditional, Agile, Extreme
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
Solving Problems in IS: Systems Approaches Logical framework in which to work. Logical framework in which to work. Serves as a reminder. Did I forget anything?
I.1 ii.2 iii.3 iv.4 1+1=. i.1 ii.2 iii.3 iv.4 1+1=
IST 210 Database Design Process IST 210 Todd S. Bacastow.
By Jim Halios.  Healthcare.gov  State of California payroll system  State of Pennsylvania unemployment compensation system.
Presented by Levent Yıldızgören TTC Language Services Ltd & Learnproject.
NEW PRODUCTS MANAGEMENT Merle Crawford Anthony Di Benedetto
{ IAFF 6159: 10 Interdisciplinary Seminar on International Science & Technology Policy Spring 2013: Syllabus.
U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration USDOT – PHMSA HMEP Grants Major Audit Findings NASTTPO April 25,
University of Virginia Software Development Processes (CS340 John Knight 2005) 1 Software Development Processes.
Quality Control Reviews (QCRs) [April 2012]. Quality Control Reviews (QCRs) Welcome The Nexia International Audit Committee The quality control programme.
PRJ566 : Project Planning and Management Project Initiation Document: Scope, Constraints, Legal, Moral and Ethical Issues, Risk Management.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
NO A Project Status John Cooper & Ron Ray October 18, 2006.
Module 11 Session 11.1 Visual 1 Module 11 Executing and Controlling the Work Session 11.1 Managing Execution: Executing and Controlling the Work.
Week 3 Outline Post-Mortem By: Jamaral Johnson. 2 After Actions Review In this presentation I will do my best to highlight what went wrong. This is just.
Interorganisational Systems. Interorganisational Systems Information Partnering It is the driving force behind the emerging electronic marketplace. Case:
System Development, Acquisition & Maintenance Controls.
Introducing Project Management Update December 2011.
Social Networking The Ning.com way. World Population 6,602,224,175 (July 2007 est.) * According to 2005 estimates by the World Health Organization (WHO),
STATUS UPDATE FOR CPRA January 26,  Study combines Cong. Boustany Recon with LCA Chenier Plain Effort  Cost Share Agreement signed in Jan
Ethics in HR. Bullying and Corporate Psychopaths at Work Clive Boddy 35% of the US work force has suffered from corporate bully's 15% of the work force.
Cybot and OSCAR Elementary School Tutorial Dec02-03 December 10, 2002 Client: Electrical and Computer Engineering Department Advisors: Dr. Lamont, Dr.
© Nano Time Limited – October 2008 Source Planning What –Analytical process that for creating procurement and supply strategies for key categories Wh y.
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
Lessons Learned from a Failed System Implementation Ann Shawver, City of Roanoke VGFOA Spring Conference June 5, 2006.
© 2011 wheresjenny.com Eurozone unemployment hit record high in May.
Knowledge Management Systems Lecture 7 Payman Shafiee.
Joint Report to Select Committee on Appropriations by Northern Cape Department of Health Northern Cape Department of Roads & Public Works supported by.
Christchurch Earthquakes
Lecture Notes - Richard Ssembatya1 Information System Project Management Lecture Five By Richard Ssembatya MSc. Cs, BSc CS, CCNA, IT Essentials, ICDL Institute.
Presentation to the Ad-hoc Joint Sub-Committee on Parliamentary Oversight and Accountability Wednesday 20 March 2002 PUBLIC SERVICE MONITORING AND EVALUATION.
1 Advanced Computer Programming Project Management: Basics Copyright © Texas Education Agency, 2013.
Written by: Harry Goldstein Published: IEEE Spectrum, September
Project Failure RYAN BIBBY – PROJECT 5 ASSIGNMENT 2 TASK 1.4.
What went wrong with the draft lottery? George W. Divine H. James Norton Website:
Report to RMS July 14, 2004.
Voluntary Separation Incentive Plan (VSIP)
Corporate-level evaluation on efficiency
Voluntary Separation Incentive Plan (VSIP)
Project Case Comparison
Business Travel Services
Database Design Process
Two way tables CoachRailCarAirTotals Jan Feb Mar Total
Internal Audit Quality Assurance and Improvement Program
Chapter 11 – Project Dashboard
Update on Shrimp Trade Issues for 2016
Review of End of Year/ End of Grant Reports
Projects: In the Beginning
SAFETY COMMITTEE MEETING November 8, 2018
April May April May June July July June August Sept August
Projects: In the Beginning
Midterm Samples Software products consist of developed programs and associated documentation. Essential product attributes are Maintainability Dependability.
Don’tPayAll.Com Brings Amazing Offers For You. Travel Bookings at Discounted Price with Expedia Coupons.
Agate: What Good is a Moose?
XRN 4954 – MiR Drop 5 - Status Update
Presentation transcript:

The Crippled Team The Story of CONFIRM CS 524 – Software Engineering Dr. Sheldon X. Liang 18 Sept 2007 Darryl Nakata

Why “The Crippled Team” Team -> Sports “Crippled Team” –Lakers Current Job Situation Development vs. Sustainment

Who Was Involved? AMR Corp. –Subsidiary of American Airlines Corp. –Created successful SABRE system –Formed AMRIS Information System arm of corporation Marriott Hotels Hilton Hotels Budget Rent-A-Car Intrico Consortium –Formed by AMRIS, Marriott, Hilton, Budget

The CONFIRM Project Background –SABRE AMR’s Reservation Control System –80% Airline reservations thru similar systems –Only 20% hotel reservations –CONFIRM (Mar 1987) Comprehensive travel industry reservation program Combine airline, hotel, car rental Marriott, Hilton, Budget Intrico Consortium (Oct 1987) AMRIS – “Managing Partner – Development”

What Eventually Happened July 1992 –3½ years after starting –Intrico disbanded –$125 Million –AMR sued Marriott, Hilton, Budget –Marriott, Hilton, Budget sued AMR –AMR agreed to pay est. $160 million

What Happened In Between Initial Agreement (Sept 1988) –Two phases: Design & Development –Completed by June 1992 (45 months) –$55.7M initial estimate –$1.05/reservation operating cost est.

What Happened In Between, II Dec 1988 –“Base Design” presented by AMRIS –Marriott claimed “inadequate” specs –Later audit described specs as too general (1992) Mar 1989 –AMRIS declared specs complete –Unacceptable to partners –Reworked for next six months

What Happened In Between, III Sept 1989 –Design Phase completed –Price estimate increased to $72.6M –Cost of reservation increased to $1.30 –Partners accepted plan –Deadline revised to July 1992 Feb 1990 –Missed deadline for terminal screen design and BAA phase –AMRIS admitted being behind schedule (13 wks)

What Happened In Between, III Summer/Fall 1990 –Partners concerned with progress –AMRIS assures being on schedule, but eventually admits to being over 1 year behind Feb 1991 –AMRIS presents “re-plan” –Functionality – Hilton only by June 1992 –New price: $92M

What Happened In Between, IV SummerFall 1991 –About ½ people were looking for new positions –AMRIS President resigned 1992 –8 AMRIS Executives fired (April) –Intrico disbanded (July) –AMRIS files countersuit (Sept)

What Went Wrong Schedule slips “Traveled Work” “Spin” – not dealing with reality Lack of Ethics Dishonesty Failed Tests

Lessons Team: Provider & Client Client responsibilities: –Clear requirements –Accountability –Awareness (vigilance) Provider responsibilities: –Right people –Right product

Crippled Team? Not seeing the signs (blind) Not hearing what was really being said (deaf) Not saying what was wrong (mute) More…?

Questions?