Heidi Aggeler, Managing Director Presented by: Presented to: BBC Research & Consulting 1999 Broadway, Suite 2200 Denver, Colorado.

Slides:



Advertisements
Similar presentations
This Power Point Presentation is designed to: To learn/review how to create/complete and submit an eGrants VISTA Grants Continuation Application based.
Advertisements

CONSOLIDATED ANNUAL REPORT (CAR) TRAINING Presented By: John Haigh Office of Vocational and Adult Education And Heather Fleck DTI Associates, Inc.
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Accessing and Using the e-Book Collection from EBSCOhost ® When an arrow appears, click to proceed to the next slide at your own pace. To go back, click.
PCMH Supplemental Grant Interim Reports Technical Assistance Call March 28, 2012 Nina Brown, MPH, CHES, Public Health Analyst, OQD Michelle Bright, Public.
Periodic Department Review A System of Affirmation LaMont Rouse Executive Director of Assessment, Accreditation & Compliance.
1 Community Investment Impact System (CIIS) CIIS 8.1 CDFI TLR Excel Upload February 2011 US Department of the Treasury Community Development Financial.
2 eGrants Coaching Unit 3 create/edit Service Opportunity Listings Grantee Recruiter search for listings, register, & apply to serve Applicants view.
Strategies for Developing Efficient and Effective Annual Count Processes Stephanie Lampron, DeAngela Milligan, and Marcia Calloway.
AUDITS Process and Corrective Actions OIG RolesGAO ROLES – OIG –OIG Lead Auditor –OCFO – owner of MATS and Agency Audit Process –OEI AA – Designated OEI.
Natural Resource Publications Management Publishing Reports in the Natural Resource Technical Report (NRTR), Natural Resource Report (NRR), and Natural.
The Quote Request Model Joanne Woytek. 2 Conference ‘11 Why Use the Quote Request Tool  Only recommended method for: Determining what is available on.
2014 Report Cards How to prepare and distribute 2014 district and school report cards.
Sole Source Training.
1 Vendor RFI - Event User Guide. 2 Minimum System Requirements Internet connection - Modem, ISDN, DSL, T1. Your connection speed determines your access.
1-2 Training of Process FacilitatorsTraining of Coordinators 5-1.
PDI TRAINING SESSION: Risk Management Registration for International Travel You will need a CSU EID.
DIRECT CERTIFICATION Patricia Winders Director’s Conference July 29, 2015.
1 The HRSA Electronic Handbooks (EHBs) Judy Ceresa HRSA - Division of Grants Policy Elisa Peet HRSA Call Center August 27, 2007.
ETID Electronic Turn-in Document
UNCLASSIFIED User Guide Applicant. UNCLASSIFIED Table of Contents What is the SAFETY Act? Applicant Guide Help Desk.
Social Work Practicum/Field Placement Database Instructions Field Instructors.
Komen Grants eManagement System GeMS. Why Online Grants  Reduce the amount of administrative paperwork being completed by applicants and grantees. 
Komen Grants eManagement System GeMS. Why Online Grants  Reduce the amount of administrative paperwork being completed by applicants and grantees. 
District Planning in ePlan July Consolidated Planning & Monitoring Eve Carney Executive Director Renee Palakovic Director of Planning
EPlan for Advanced Users 2015 ESEA Directors Institute August 27, 2015.
TECHNICAL DOCUMENTATIONPARTNERS DOWNLOAD DATA Download water quality data in MS Excel, CSV, TSV, and KML formats. Learn how to use the portal and data.
Moodle (Course Management Systems). Assignments 1 Assignments are a refreshingly simple method for collecting student work. They are a simple and flexible.
1 ARRA Recipient Reporting FederalReporting.gov Briefing In-Bound Recipient Reporting April Reporting Cycle Enhancements March 29, 2010.
1 Reportnet for Noise: Feedback from member countries Colin Nugent Eionet National Reference Centres for Noise meeting Copenhagen October 2009.
Cindy Collins ETEC 665 Electronic Submissions Submitting Proposals Through Grants.Gov.
Documents posted at QRIS 2011 Program Quality Improvement Grant RFP Bidder’s Conferences February & March 2011 Wendy Valentine Director,
Social Innovation Fund Creating an Application in eGrants Technical Assistance Call 1 – 2:00 p.m. Eastern Time on Friday, March 19, ;
How to Submit An Amendment Tips from the 21 st CCLC Unit Updated September 17, 2009.
Submitting Course Outlines for C-ID Designation Training for Articulation Officers Summer 2012.
MAS/FPS Fall Directors’ Workshop MDE OFS Updates October 2014 Office of Field Services.
Online Bid Submission in Bid4Michigan Screen Walk Tutorial Compiled by Christine Mitchell 1/4/2011.
Walk through the reporting process for Barcelona Convention using Reportnet Miruna Badescu, Giuseppe Aristei.
System for Administration, Training, and Educational Resources for NASA External Training Requests for Users and Supervisors November 2009.
Focus School Grant ApplicationFocus School Grant Application Consolidated Planning & MonitoringConsolidated Planning & Monitoring June 16, 2015June 16,
On Site Review Process Office of Field Services.
NYS Division of Homeland Security And Emergency Services (DHSES) E-Grants Tutorial Creating an Application for the EOC RFP To access DHSES E-Grants you.
The Basics Craig Johnson Grant Administrator Department of Medicine Instructor.
1 PRINCIPAL INVESTIGATOR USE OF THE ST ScI ELECTRONIC GRANTS MANAGEMENT SYSTEM January, 2001.
Commission on Teacher Credentialing Ensuring Educator Excellence 1 Program Assessment Technical Assistance Meetings December 2009.
Consolidated Plan Enhancements Goal: Support planning that leverages resources and multiplies outcomes through enhanced data, technology and system updates.
Electronic Annual Review Files A Guide for Faculty Members.
A Review of CPD Maps | ArcGIS | HUD Open Data Online Mapping Tools.
07/16/2007 C&G Officer User Guide for eCAFSlide 1 C&G Officer User Guide for eCAF.
Research and Innovation REPORTING and PAYMENT (in practice) v
Komen Grants eManagement System GeMS. Why Online Grants  Reduce the amount of administrative paperwork being completed by applicants and grantees. 
2012 TELPAS Online Testing & Data Collection. Disclaimer  These slides have been prepared by the Student Assessment Division of the Texas Education Agency.
NIMAC for Accessible Media Producers: February 2013 NIMAC 2.0 for AMPs.
Virginia Administrative Training Module 1: Processing, Online, Scoring and Reporting Training Presentation Training Presentation Working Within PearsonAccess.
How to complete and submit a Final Report through Mobility Tool+ Technical guidelines Authentication, Completion and Submission 1 Antonia Gogaki IT Officer.
How to Guide: Performance Feedbacks Learn how to complete, upload and publish Performance Feedback forms.
Component D: Activity D.3: Surveys Department EU Twinning Project.
Rev. May 2016 cuResearch User’s Manual. What is cuResearch? Introduction to cuResearch More information is available on the CURO website:
School Improvement Updates Accreditation (AdvancED) Process ASSIST Portfolio for Schools May 2016 Office of Service Quality Veda Hudge, Director Donna.
Welcome! To the ETS – Create Client Account & Maintenance
Accounting: Graded Unit 2 F8KF 35
Consolidated Plan Practices
Instructions for Submitting MIPPA 2017 State Plans
Planning & Reporting in the eCon Planning Suite
NIFA - Planning Accountability & Reporting Staff
Appeals Process Screener Training Module Module 6
Presenter: Roberto Tazoe Assistant Director,
Presenter: Diana Castillo
CTSA27 So you want COMIRB to be your sIRB: What you need to know.
Stakeholder Update Building A New Trauma Registry
Presentation transcript:

Heidi Aggeler, Managing Director Presented by: Presented to: BBC Research & Consulting 1999 Broadway, Suite 2200 Denver, Colorado tel fax The eCon Plan Suite from a User’s Perspective August 14, 2013 Midwest Regional Conference

2 BBC Research & Consulting 1999 Broadway, Suite 2200 Denver, Colorado tel fax Our Experience with the eCon Plan Suite ■ Completed first eCon Plan (Five-year Consolidated Plan and elements of the Action Plan) for the City and County of Denver (submitted to HUD January 15, 2013) ■ Completed first eCon Plan (Five-year Consolidated Plan) for the City of Lakewood (draft January 2013) ■ Assisted the City of Santa Fe with first eCon Plan submission (May 2013) ■ Assisted the State of Indiana with their 2013 Action Plan using the eCon Plan Suite (May 2013)

3 BBC Research & Consulting 1999 Broadway, Suite 2200 Denver, Colorado tel fax How does the eCon Plan Suite differ from the Standard Consolidated Plan? ■ Narrative is significantly reduced for some elements and enhanced for others. Format is often Q&A. ■ Increased opportunity to reference and use recently completed market studies and needs assessments (Denver Mayor’s Housing Task Force example) ■ For states, Method of Distribution (MOD) needs to be appended ■ Requires specific input from partners (e.g., public housing authorities, public facilities planning and management, economic development officials) ■ More direct description of public and stakeholder input. Upfront expectations about the organizations to be consulted in preparation of the Consolidated Plan.

4 BBC Research & Consulting 1999 Broadway, Suite 2200 Denver, Colorado tel fax How does the eCon Plan Suite differ from the Standard Consolidated Plan? ■ Greater importance placed on certain data: disproportionate need, homeless counts and surveys, assisted housing and homeless facilities. ■ Enhanced understanding of Census data may be required to complete the narrative (e.g., disproportionate need, economic development data). ■ More direct requirements for priorities, reasons for funding allocation decisions, goals and objectives, institutional delivery, anticipated resources.

5 BBC Research & Consulting 1999 Broadway, Suite 2200 Denver, Colorado tel fax Helpful Hints for Using the eCon Plan Suite RECOMMENDATION NO. 1: Download an MS Word version of the Suite before you start inputting data. Use the Word document to prepare the Action Plan or Consolidated Plan. Once complete, copy and paste the information into the eCon Plan Suite. Use the MS Word document you created for the draft comment period. Why is this recommended? ■ There is a risk of losing data in the online version (your computer freezes, Suite freezes, wrinkles within the software). ■ Multiple people can work on the various screens and narrative at the same time (see Recommendation No. 2). May also want to consider development of internal documents (e.g., Excel workbook with input fields) to collect and analyze needed data.

6 BBC Research & Consulting 1999 Broadway, Suite 2200 Denver, Colorado tel fax Helpful Hints for Using the eCon Plan Suite RECOMMENDATION NO. 2: Coordinate early with participating organizations/agencies. From our (recent) experience, we think this could be the most challenging part of the eCon Plan! The data and information needed for the eCon Plan Suite may exceed what organizations/agencies have provided in the past. To facilitate receiving what you need in a timely manner, we recommend you send the relevant fields to departments and agencies well in advance of your data input date. We have had success sending blank versions of the eCon Plan MS Word download to departments and having them complete relevant tables and narrative directly into the Word document.

7 BBC Research & Consulting 1999 Broadway, Suite 2200 Denver, Colorado tel fax Helpful Hints for Using the eCon Plan Suite RECOMMENDATION NO. 3: Respect the Suite’s data input preferences. ■ Save your work frequently due to the instability of the Suite. ■ The Suite doesn’t like anything other than a number in data fields (do not use “%” or decimal point). ■ If you have trouble copying text, try and try again. The Suite may ask to allow the data (choose “Yes”). ■ Don’t format the text before you copy and paste into the Suite, as this will change. ■ The narrative sections of the eCon Plan have character limits. Prepare your narrative sections accordingly by conveying information in the fewest words possible. ■ The MS Word download version may not contain all of the data elements that are required in the online version. Ensure that you also review the online sections when sending requests to organization/agencies, and include the online pieces in those requests.

8 BBC Research & Consulting 1999 Broadway, Suite 2200 Denver, Colorado tel fax Helpful Hints for Using the eCon Plan Suite RECOMMENDATION NO. 4 : Frequently consult the eCon Plan Suite desk guide. The guide is helpful, easy to understand and in many cases contains explanations of what is expected for the field (beyond what the description in the Suite suggests). Access the desk guide at:

9 BBC Research & Consulting 1999 Broadway, Suite 2200 Denver, Colorado tel fax Helpful Hints for Using the eCon Plan Suite RECOMMENDATION NO. 5 : If important, update data fields. Because the Suite must accommodate a wide range of states and cities, the Census data used for many of the tables is that which is most commonly provided for all geographic levels. More recent information may be available for larger states and cities. You can access updated data from American Fact Finder at

10 BBC Research & Consulting 1999 Broadway, Suite 2200 Denver, Colorado tel fax Helpful Hints for Using the eCon Plan Suite RECOMMENDATION NO. 6: your HUD representative when you “submit.” ■ Submitting is done by changing the status of the plan from “in progress” to “submit” on the Administrative screen AD-25. ■ Don’t assume that the Suite notifies your HUD representative that the plan has been submitted for review. ■ Make sure you provide scanned or original, signed copies of the SF-424 and certifications to your HUD representative and/or upload them into the Suite. ■ You will probably need to provide an electronic copy of the “Grantee Unique Appendices” (with MOD, scanned public comments) to HUD separately, as the Suite doesn’t always allow access.