Charlie Lake Sewer Collection System & Lagoon Upgrades Thursday June 20 th, 2013.

Slides:



Advertisements
Similar presentations
JOINT MEETING OF ESSEX AND UNION COUNTIES Virtual Plant Tour.
Advertisements

Princeton Wastewater Servicing Study
Ministry of Environment Environmental Protection Division Presentation to CRD Sewage Forum, Sept. 26, 2005 Sewage is regulated in British Columbia by the.
Why Does the Lake Community Need a Sewer Septic tanks are failing. The life expectancy of a septic tank in “ideal” conditions is 20 years. In many cases.
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
Wastewater Treatment Project Update May 15, 2013.
Sanitary Sewer System Rate Study September 2012 Keystone Municipal Services.
Regional Water Service Development Cost Charges Update October 2014 Bryan Shoji, P.Eng. General Manager, Infrastructure Services.
Paying A Fair Rate. Notice Regarding New WATER & SEWER RATES  Council Meetings (Open Session) June 18, 2007 – Special Meeting June 18, 2007 – Special.
Town of Plattsburgh Cumberland Head Sewer District Welcome To CUMBERLAND HEAD SEWER DISTRICT INFORMATIONAL MEETING JULY 2009.
WASTEWATER SYSTEM MANAGEMENT by John Lisenko Wastewater systems are indispensable for community health. One of the signs of progress and civilization is.
City of South Burlington City Council Adopted January 12, 2013 FY 2014 Budget - Keys to Financial Success Prepared by Sandy Miller, City Manager and Bob.
0 Scoring Community Development Block (CDBG)Grants Water/Sewer Apps April 8, 2013 SEIRPC CDBG Scoring Committee.
Cuba’s Future Development Needs, Funding Models, and Alternatives. A Perspective of the Operation of a Cuban Water & Sewer Utility. Eduardo Vega-Llort,
Response to LDEQ Consolidated Compliance Order and Notice of Potential Penalty.
1. The installations of grinder pumps and lines from residences on private property to M.D. collection lines is the final link in finishing a project.
2013 Stormwater Workshop June 13, 2013 Sponsored By Michiana Stormwater Partnership John J. Dillon Director, LTCP Management City of South Bend.
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting July 12, 2012.
A Tale of Three WWTPs (Frangel, Town of Kent, Kent Manor ) NYC Watershed/Tifft Science and Technical Symposium September 19, 2013 Thayer Hotel, West Point,
May 21 Osler Community Hall Community Information Night1 5/21/2014.
Presentation to CITY OF PALM COAST, FLORIDA WATER AND WASTEWATER RATE STUDY AND BOND FEASBILITY REPORT Prepared in Conjunction with the Issuance of Utility.
Gilbert Road Light Rail Extension Transportation Project Advancement Agreement City Council Study Session December 4, 2014.
CITY OF NORTH PORT US41 CORRIDOR UTILITIES MASTER PLAN US 41 Utility Corridor Study Presentation April 27, 2010.
City of Fargo Meadow Creek Area Flood Risk Management – Project 5944 Public Information Meeting June 21, 2010.
Holden Heights Community Improvement Project Update Orange County Board of County Commissioners December 17, 2013.
Wastewater Treatment & Collection System Improvements.
The City of North Bend Sanitary Sewer System
2015 Municipal Budget Overview Borough of Montvale April 14, 2015.
Federal, state and local government entities working together to meet the health, welfare and public safety needs of Wyoming’s citizens. January 11, 2011.
TRANSPORTATION POLICY COMMITTEE FINAL REPORT AND RECOMMENDATIONS PROFESSIONAL AND TECHNICAL STAFF COUNCIL ALUMNI CENTER APRIL 2, 2003.
City Of Phoenix Water Rates June 30, 2011 Denise Olson Deputy Finance Director Finance Department.
2013 City Budget Manhattan ~ Kansas Work Session Two.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
City of Polson April 5, 2010 PUBLIC HEARING Water System Improvements PRESENTATION ON PRELIMINARY ENGINEERING REPORT.
2012 – 2016 FINANCIAL PLAN OVERVIEW City of Pitt Meadows DM #94656.
Sunshine Coast Regional District Development Cost Charges July 3, 2014 Infrastructure Services Committee Bob Twerdoff.
1 st Quarter 2015 Financial Report City Council Meeting June 11, 2015.
2013 Business Planning Process. Business Planning Process Guidelines Budget Preparation Preparation of Business Plans Management Review Presentations.
Water Connection Fee Analysis Elk Grove Water District Finance Committee January 30, 2013.
Village of Almont WATER, SEWER, AND SSO RATES 2012 – 2013 FISCAL YEAR.
Commissioners’ Briefing on Front Foot Benefit and House Connection Rates November 16, 2011.
Road Map to the Future: The Consolidation of Sewer Infrastructure in Rutherford County, NC November 16 th, 2015.
Ordinance Amending Chapter 37 Orange County Code Utilities Department October 21,
Sewerage Infrastructure Development in Sarawak
Public Information Meeting Wastewater Treatment January 26, 2016.
March 3, 2016 Discovery Sewer/RWQCB LSM Vallecitos Water District Regional Water Quality Control Board (RWQCB) Lake San Marcos February 10, 2010.
Potential Consolidation of WMWD’s Murrieta Division into EMWD April 15, 2015 Paul D. Jones II, P.E. General Manager, Eastern Municipal Water District
Sanitary Sewer Fee Study March 4, Summary Sausalito’s 75-year-old sewer system is old and deteriorated. While the current rates have allowed the.
CITY OF ARCATA -WATER AND WASTEWATER CAPITAL IMPROVEMENT PROGRAM: RATE SETTING.
City of McCall Sanitary Sewer I&I Study Community Stewardship for Economic Benefits Nathan Stewart, PE, City Engineer Matt Neukom, PE, Project Manager.
City of Joliet 2016 Proposed Budget November 30, 2015.
Phase II and Compost Facility Upgrade Projects February 16, 2012.
SOLID WASTE MANAGEMENT CAPITAL PROJECTS ASSESSMENT Board of County Commissioners FEBRUARY 24, 2009.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
2015 Annual Financial Report December 31, Total Revenue $13,068,887Total Expenditure $14,006,870 Revenue Budget $14,957,884Expenditure Budget $15,669,564.
Status Update on USEPA Compliance Sausalito City Council February 26, 2013 SMCSD Directors Raymond Gergus, President Bill Ring, Vice President Ann Arnott.
Grey Owl Municipal Water feasibility study
RUSSELL - ROSSBURN WATER SUPPLY
Water and Wastewater Rates
Water & Wastewater Capacity Charge Work Shop
Overview of the CoJ Water & Sanitation Master Plan
City of Johnston East of Merle Hay Road Infrastructure Improvements
SEWER SERVICE FEE RATE STRUCTURE ALTERNATIVE
Final Rate Study Findings
UNDP-GEF Project on Lake Tanganyika Best Practices and Challenges
Colchester Interceptor System Improvements Project
Public Hearing Sanitary Sewer Fees
City of Rehoboth Beach Water and Wastewater Financial and Rates Review
Wastewater Facilities Upgrade Project
Presentation transcript:

Charlie Lake Sewer Collection System & Lagoon Upgrades Thursday June 20 th, 2013

Agenda Overview of System Project Background/History Objective of Upgrades Proposed Upgrades Cost Estimate & Project Schedule Financials Questions

Overview of Existing Collection and Treatment System

Overview of Existing Service Connection

Existing Community Sewer System

Project Background/History Collection system originally built in 1991 Upgrades to the lift station and outfall replacement line in Monitoring Program ; undertaken to help establish system capacity issues

Objectives of Collection System and Lagoon Upgrades Provide a reliable sewer system during peak conditions Provide capacity in the system to allow for development in key areas Provide efficient treatment for future increased flows

Proposed Collection System Upgrades

How will it help the system now?  Eliminates sewage back-ups within the collection system for current users  Provides more capacity at the lift station during peak events How will it help the system in the future?  Provides capacity in the system for future development in key areas

Proposed Lagoon Upgrades Convert cell 3 into 2 Aerated Lagoons Abandon Cells 1 & 2 Install 2 complete mixed tanks

Proposed Lagoon Upgrades How will it help the system in the future? ▫Upgrading the treatment system will enable increase capacity for future growth in key areas ▫Continuing to meet wastewater treatment requirements through year round discharge

Cost Estimate for Proposed Upgrades Collection System Upgrades$2.4 Million Lagoon Upgrades$2.8 Million Total Estimated Costs: $5.2 Million

Schedule for Collection System Upgrades Preliminary and Detailed Design Summer/Fall 2013 Tender Winter 2013 Construction Spring 2014

Schedule for Lagoon Upgrades Preliminary Design Summer 2013 Environmental Impact Study Ministry of Environment Approval Fall 2013 Detailed Design Tender Winter 2013 Construction Spring 2014

Financing How will the proposed upgrades be financed? ▫Fair Share$3.2 Million ▫Gas Tax$2.0 Million *No financial impact for residents for capital works

Financial Sustainability Capital and Operational Reserves ▫Parcel Tax – All Lots  Estimated at $100-$150/year  For future capital projects related to replacement of the existing system Development Cost Charges (DCC’s) ▫For New Lots  For future capital projects related to increasing capacity within the system to accommodate growth

Neighbouring Sewer Rates MunicipalityMetered*/Set RateCost/yr Charlie Lake – PresentSet Rate$240 FSJ Airport SubdivisionMetered$1,440 City of FSJ – Inside Municipality Metered$472 City of FSJ – Outside Municipality Metered$1,200 City of FSJ – Bulk Rate$450/m 3 City of Dawson CreekMetered$493 TaylorSet Rate$268 * Metered costs based on a example of 400 m 3 /yr

Summary Why the proposed upgrades? Will residents be affected?