Handshake over DIP 10/08/20091R. Alemany - BE/OP/LHC.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Implementing A Simple Storage Case Consider a simple case for distributed storage – I want to back up files from machine A on machine B Avoids many tricky.
Feedback on phase adjustment with BPTX Using scope and LHCb BPIM boards to readout BPTX signal BPIM only used for triggering, phase measurements (BPTX1-BC1,
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
How to improve operational efficiency ? [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] Beam Commissioning Workshop, Evian Jan 2010.
ITS Subsystems Availability MACS Week, June 2011 E. Sargsyan PP a-ESA_ITS_MACS_Week_June2011.pptm E. Sargsyan ITS Subsystems Availability 1.
Tuesday 10 th April - morning Access for:  point 3 Jerome Landaro TCSG one jaw didn't move  point 5 Qps expert on RPMBB.UJ56.RCBXH1.R5  point 6 TCDQ.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
Handshake with the experiments 04/09/20091 R. Alemany (BE/OP/LHC) LHC Experiments Handshake.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
00:15: Stable beams fill 1883, 1.1E33 cm-2s-1.  Seems the 144 bunches beam 1 doe not fit properly on the injection kicker waveform. Systematically the.
RBAC Content: LHC Operational Mode Piquet Roles RBAC Strict LHC Operational mode and CMW Acknowledgements: Pierre C., Wojtek S., Stephen P., Lars J., Verena.
Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
6. Shift Leader 1. Introduction 2. SL Duties 3. Golden Rules 4. Operational Procedure 5. Mode Handshakes 6. Cold Start 7. LHCb State Control 8. Clock Switching.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
Technical Stop feed-down P.Charrue on behalf of the BE Controls Group 5th September 2011P.Charrue - 8h30 meeting1.
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
Transfer Line Test preparation meeting V. Kain, R. Alemany.
LHC machine status ~ Daily Summary ~ Daily beam commissioning meeting Week 42 - October 13 th, 2015 CERN, Geneva, CH M. Lamont and S. Redaelli for the.
Tuesday 26 th April – morning shift 08:00 Great news, cryo is back! Unluckily it was followed by many other problems, one after the other one. So, spent.
Lumi scan limits checked (in preparation for next fill VdM scans).  Trims of up to 150 um per beam in IP1 & IP2 both planes both beams were done (IP5.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
LAN Topologies Part 1. What is topology? Topology is the physical or logical interconnection of communicating devices Physical Topology: LANtopology,
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
LHC Beam Commissioning Meeting V. Kain & R. Alemany
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Hand-shake Signals Between LHC Machine and Experiments
-9:00: Test IP transverse adjustment (CMS) and optics verification.
ATLAS-AFP interlock validation
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Monday 14th March Second fill with pilot + 3 nominal bunches
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Saturday 30th June - Sunday: Rocky !
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Yesterday Issue of injection kicker not pulsing:
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Bernhard Holzer, Joerg Wenninger
Week 36 plan Todo’s: And also: 12+b injection.
Sunday morning Recovering from 400 kV disturbance.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Thursday :00: Physics fill from the night shift
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Wednesday 03/11 – The Plan Finish electron-cloud program:
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 14:00 beam dump Access:
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
LHC Morning Meeting - G. Arduini
LHC Fast Timing Commissioning
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Summary for LPC (March 7th, Ralph Assmann)
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Thursday - setup 10:00 Starting pre-cycle. 11:30 Injection.
Thursday 20th July - morning
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Presentation transcript:

Handshake over DIP 10/08/20091R. Alemany - BE/OP/LHC

10/08/20092R. Alemany - BE/OP/LHC

MachineExperimentComment STANDBYVETODefault when nothing is happening WARNINGPREPARE10 minutes warning, experiment starts preparing IMMINENT2 minutes warning READY - Machine ready for injection, adjust or dump - Experiments ready for action OKSuccessful completion of action 10/08/20093R. Alemany - BE/OP/LHC

Questions How to handle the FULL INJECTION phase? INJECTION PROBE BEAM INJECTION SETUP BEAM INJECTION PILOT BEAM INJECTION IPHYSICS BEAM Proposal: after receiving the READY from all the experiments, LHC starts the injection process: injection probe beam, injection setup beam, injection probe beam and injection physics beam. Then, only once the whole injection process is finished, LHC sends the message OK and STANDBY. 10/08/20094R. Alemany - BE/OP/LHC The experiments can follow up the injection looking at the BEAM MODE published via DIP.

How to handle the PROBLEM message? PROBLEM means anything except an action that requires a beam dump, i.e. is interlocked. or PROBLEM Proposal: LHC expects the message PROBLEM as an alternative to PREPARE or READY. Outside these three phases INJECTION, ADJUST and DUMP  Machine doesn’t use Handshake protocol and therefore the Machine doesn’t listen to msg PROBLEM. Other mechanism needed. Suggestion?  telephone. 10/08/20095R. Alemany - BE/OP/LHC

How to communicate that the LHC synchronization phase is done and experiments can switch to LHC timing? Proposal: – Change beam mode to INJECTION PROBE BEAM – Check that the RF power is on – Prepare the RF Beam Control for filling (here we do all the synchronization) – Send the Handshake DIP message to experiments IMMINENT – Etc…. (the sequence goes on with other tasks) The beam mode change to INJECTION PROBE BEAM signals the start of the synchronization, the DIP message IMMINENT signals that the synchronization has been done successfully. 10/08/20096R. Alemany - BE/OP/LHC

LHC Beam Modes 10/08/2009R. Alemany - BE/OP/LHC7