RPEWG Report Milorad Papic (RPEWG Chair) Salt Lake City, February 5, 2014 RS Meeting 1.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

WECC TRD/NERC TADS Webinar
The Western Electricity Coordinating Council Doug Tucker of WECC & Brian Keel of SRP November 16, TRD/TADS Webinar.
Interchange Authority Recommendations Board of Directors Meeting December 7, 2007.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
RPEWG Present and Future Activities Boise, August 17, 2011 RPEWG Meeting 1.
Doug Tucker Associate Staff Engineer TRD/TADS update and Future reporting.
NERC TADS Update Andrew Slone, Engineer, Reliability Performance Analysis WECC RPEWG Meeting May 14, 2013.
Marv Landauer Report to TSS on Annual Study Program Report Review Task Force April 2012 TSS Meeting Salt Lake City.
Al Badella Technical Operations Subcommittee Chair Operating Committee Report Oct 24th, 2013 Anaheim, CA.
Outage Reporting Hierarchy Background Data Capture Structure Next Steps.
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
NERC/GADS Reporting Requirements John Yale Hydro Plant Engineering Manager Chelan County PUD 1.
Business Continuity and Disaster Recovery Planning.
Why TADS Is Needed No systematic transmission outage data collection effort exists for all of North America Energy Information Administration data (Schedule.
FACILITY SAFETY: Creating a Safe and Secure Environment in the Community Health Center Presented by Steve Wilder, BA, CHSP, STS Sorensen, Wilder & Associates.
Al Badella Technical Operations Subcommittee Chair Operating Committee Report March 25,26 th, 2015 Salt Lake City, UT.
Family Resource Center Association January 2015 Quarterly Meeting.
DoD Information Technology Security Certification and Accreditation Process (DITSCAP) Phase III – Validation Thomas Howard Chris Pierce.
Review of Probabilistic Workshop held on September 9, 2014 Milorad Papic (RAWG Chair) Salt Lake City, January 13, 2015.
Andy Meyers ISAS Chair ISAS Report WECC Operating Committees March 2015 Salt Lake City, UT.
Orientation to the Accreditation Internal Evaluation (Self-Study) Flex Activity March 1, 2012 Lassen Community College.
CAR/SAM Regional Guidance Material on Air Traffic Services Quality Assurance Programmes NAM/CAR/SAM Quality Assurance Workshop Gustavo De León Regional.
Student Learning Objectives The SLO Process Student Learning Objectives Training Series Module 3 of 3.
U.S. Energy Information Administration Independent Statistics & Analysis ERUS 2014 Bulk Power and Reliability Proposed Changes to Form EIA-411.
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Including Student Growth in Educator Evaluation Day 3 Monitoring and Adjusting January, 2014.
2014 Calendar Year Customer Survey Results. Background Open for comment February 12, 2015 through March 31, 2015 for evaluation of prior year – 21 close.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Current and Future Applications of the Generic Statistical Business Process Model at Statistics Canada Laurie Reedman and Claude Julien May 5, 2010.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
Project Real-time Monitoring and Analysis Capabilities Mark Olson, Senior Standards Developer Texas RE NSRS October 5, 2015.
Application and Implementation of State Estimator at Idaho Power Company S. Kincic and M. Papic.
Performance Measure Recommendations Greg Pierce – Chair, Performance Measures Task Force Compliance and Certification Committee Meeting September 8-9,
Curtis Crews, Reliability Services Texas Reliability Entity, Inc. Changes in Relay Misoperations Reporting.
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
Community Assessment Training 3- Community Assessment Training 6-1.
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
Review of TADS Data for 2012 Voltage Class Name Metric AC Transmission Outages - Failed Protection System Equipment AC Transmission Outages - Human Error.
WECC 2013 TPL Coordination Analysis Report PCC Response Brian Keel.
RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
George Zhou, VGITF Chair October 14, 2015 Salt Lake City, Utah Variable Generation Interconnection Task Force Update to PCC.
Unit 8: Implementation, Part II Seminar Wednesday pm ET.
Impacts and Actions Resulting from the August 14, 2003 Blackout Minnesota Power Systems Conference November 2, 2003.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Integrated Reliability Measures Heide Caswell, Team Lead, Reliability Metrics Working Group (RMWG) Director of Network Performance, PacifiCorp Compliance.
Misoperations Reduction Strategy
Kenneth Silver Los Angeles Department of Water & Power
Reliability Assessment Guidebook (RAG): Status Report
Reliability Assessment Guidebook (RAG): Status Report
Workshop Session 1: Overview
WECC August 2017 Reliability Workshop James Merlo, PhD
Workshop Session 1: Overview
NERC Reliability Standards Development Plan
Larry Bugh ECAR Standard Drafting Team Chair June 1, 2005
Milorad Papic (RPEWG Chair) Salt Lake City, February 5, 2014
WECC August 2017 Reliability Workshop James Merlo, PhD
Misoperations Reduction Strategy
Performance Measure Recommendations
Kenneth Silver Los Angeles Department of Water & Power
NERC Reliability Standards Development Plan
Schoolwide Programs.
NERC Planning Committee Update
Presentation transcript:

RPEWG Report Milorad Papic (RPEWG Chair) Salt Lake City, February 5, 2014 RS Meeting 1

2 OUTLINE 1. An Update on NERC TADS Activities 2. An Update on 2013 WECC SOTI Report 3. RPEWG Activities (Discussion) 2

3 1. TADSWG Meeting in Atlanta, January 28-30, 2014 ● The TADSWG reviewed and discussed the ‘Unknown’ cause code outages as stated in one of the key findings of the 2013 State of Reliability (SoR) report. Information presented to the TADSWG indicate that the proportion of outages with ‘Unknown’ cause is declining (i.e. an improving trend). Through ongoing efforts of the TADSWG in providing clarification to reporting questions from the reporting entities it is expected that this improving trend will continue. Also, the TADSWG recommended that NERC staff, along with Regional Entities identify events with a high concentration of “Unknown” outages and entities reporting a high proportion of “Unknown” outages and work with these cases and entities individually to resolve any outage coding issues.

4 1. TADSWG Meeting in Atlanta, January 28-30, 2014 ● Non-Automatic outage data collection initiated in 2010 as part of TADS Phase II implementation was reviewed and discussed in light of the “sunset provision”. A 5-year sunset clause built into the TADS Phase II implementation that established an end to the non- automatic outage data collection at the end of 2014 unless benefits of the collection of these data can be demonstrated. Review and discussion on this subject will continue through 2014 and we plan to finalize the decision regarding the collection of the non-automatic outage data in the August 2014 meeting.

5 1. TADSWG Meeting in Atlanta, January 28-30, 2014 ● The TADSWG discussed the various controls presently in place to address the quality of TADS data being collected. NERC staff will review past Change Orders submitted to OATI (the webTADS vendor) and consolidate the various data quality related controls specified within them and consult with OATI to confirm their implementation status. TADS training also serves as a data quality control. At the next meeting, the TADSWG will review available training records provided by NERC staff and determine the extent to which these can be used to monitor effectiveness of the TADS training.

6 1. TADSWG Meeting in Atlanta, January 28-30, 2014 ● The TADSWG continue to review and address questions from reporting entities through the box and other event scenarios that are presented to the TADSWG. A common theme has been uncertainty around sustained cause codes (SCC). The TADSWG continued discussion on this subject to clarify its purpose and intent. The focus of the discussion was on the “weather>weather” example which had been discussed in several previous meetings. The TADSWG decided to revise an existing example scenario coding in the manual from ICC: Weather; SCC: Weather to ICC: Weather; SCC: Equipment Failure. This indicates that the initiating cause for the outage was due to adverse weather conditions and the duration of the outage was substantially due to the time required for the repair of resulting equipment failure. This clarification will be communicated as part of the next round of TADS training scheduled for the fall of ●

7 1. NERC ACSETF Survey ● As recommended in the 2012 State of Reliability report, additional data was gathered on equipment failure, including secondary cause codes and the type of equipment failure experienced. Resulting analysis found that Failed AC Substation Equipment was statistically significant and positively correlated to 2008–2012 automatic transmission outage severity. Among all cause codes, Failed AC Substation Equipment was also the second largest contributor to the 2012 transmission severity, with relative risk the second highest, excluding Weather and Unknown initiating causes. Analysis of the transmission outage and disturbance event information shows that circuit breakers are the most common type of ac substation equipment failure. Please refer to the 2013 State of Reliability report key finding 5 ● To further refine results from 2012 SOR Report, The NERC AC Substation Equipment Task Force (ACSETF) has endorsed conducting a survey to provide additional insight into Automatic Outages due to AC substation equipment failure. This survey is intended for TADS reporting TOs. By February 14, 2014, please complete the attached voluntary survey (Entry Form A). Please return your completed surveys to

8 1. NERC SOR 2014 Report Draft outline and chapter assignments: ● Chapter 1 - Key Findings and Conclusions – Howard & Naved ● Chapter 2 – Daily Performance Severity Risk Assessment – Naved & Svetlana (if statistical analysis needed) ● Chapter 3 – Risk Issue Identification – Svetlana, Andy & Howard  Response to Key finding 5 – Naved  Response to Key finding 6 – Elsa & Andy ● Chapter 4 – Reliability Indicator Trends – Naved, Svetlana, Matthew, Elsa ● Chapter 5 – Event Analysis – RRM, Elsa & Matthew ● Chapter 6 – Spare Equipment Database – Naved

9 1. NERC SOR 2014 Report ● Risk Issue Identification - Statistical Study based on 5-year TADS Data with Duration (presentation on new findings from a study is available) ● 2013 State of Reliability ● Key Findings 4: Protection System Misoperations are a Significant Contributor to Disturbance Events and Automatic Transmission Outage Severity ● Key Findings 5: AC Substation Equipment Failures are a Second Significant Contributor to Disturbance Events and Automatic Transmission Outage Severity ● Key Findings 6: Automatic Transmission Events with Unknown Cause Necessitate Analysis

10 1. Integrated Risk Assessment Approach – Severity Risk Index

11 1. Transmission Severity

12 2. An Update on WECC SCOTI Report Build upon NERC efforts related to reliability concepts and risk assessment (SOR Reports). The 2013 WECC State of the Interconnection (SCOTI) report will cover the evaluation of the overall bulk power system reliability risk. The main goal is to quantify performance, highlight areas for improvement as well as reinforce and measure success in controlling various reliability risks. What to include from TRD Outage Data and how RPEWG might help?

13 Questions