NERC Compliance An NWP Perspective

Slides:



Advertisements
Similar presentations
1 Joint U.S.-Canada Power System Outage Investigation Interim Report Causes of the August 14 th Blackout in the United States and Canada.
Advertisements

WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
Notice of Proposed Rulemaking on Standards WECC Board of Directors Meeting December 7-8, 2006.
NERC Reliability Readiness The Next Steps Mitch Needham NERC Readiness Evaluator September 24, 2007.
MARKET INTERFACE COMMITTEE OC and PCC Approval Items March 6-7, 2008 Albuquerque, New Mexico.
COMPLIANCE 101 Module One.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
PER
PER Update & Compliance Lessons Learned
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
Reliable Power Reliable Markets Reliable People Challenges and Opportunities in the Power Industry in Alberta CERI Conference October 22 & 23, 2007 Warren.
Transmission Transporting Electricity by Wire Darcy Neigum Montana-Dakota Utilities Co.
The Mathematics of the Great U.S. Blackout August 14, 2003 Ralph Fehr, P.E. Engineering Consultant.
August 14, 2003 Blackout Final Report
REN-Rede Eléctrica Nacional,S.A. Can the California and New York crisis occur in Europe ? Rui Pestana IST - 25th October 2003.
1539pk 2003 MAJOR POWER GRID BLACKOUTS IN NORTH AMERICA AND EUROPE Copyright © P. Kundur This material should not be used without the author's consent.
1 U.S. Energy Information Administration, Annual Energy Review All energy input US average = 90.3 MWh per person, per year. Corresponds to 10.3 kW.
NERC and Regional Efforts to Ensure Reliability Dave Nevius, NERC Sr. VP David Cook, NERC VP & General Counsel Louise McCarren, WECC CEO Don Benjamin,
1. 11/26/2012: NERC Board of Trustees adopted CIP v5 CIP thru CIP CIP and CIP Version 5 Filing FERC requested filing by 3/31/2013.
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
Jeffery J. Gust IOWA INDUSTRIAL ENERGY GROUP FALL CONFERENCE Tuesday, October 14, 2014 MidAmerican Energy Company.
Reliability Standards Update
ERCOT’S COMPLIANCE ASSESSMENT PROGRAM Mark Henry Compliance Manager March 23, 2005.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
August 2003 Blackout Review Brant Eldridge Executive Manager - ECAR.
1 Blackout 2003 See:
August 14 th NE Blackout and Common Roots of Blackouts Damir Novosel, PhD President KEMA Inc., T&D Consulting BLACKOUT AMERICANO E ITALIANO:
Averting Disaster - Grid Reliability Issues and Standards National Energy Restructuring Conference April 1, 2004 Washington, DC.
GOP and QSE Relationship Jeff Whitmer Manager, Compliance Assessments Talk with Texas RE June 25, 2012.
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
City of Leesburg Electric Department Internal Compliance Program (ICP)
Federal Energy Regulatory Commission June Cyber Security and Reliability Standards Regis F. Binder Director, Division of Logistics & Security Federal.
1 Arizona Corporation Commission BTA Workshop Presenter: Steven Cobb May 23, 2008.
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
APPA RELIABILITY STANDARDS & COMPLIANCE SYMPOSIUM Case Study: City Utilities of Springfield, MO January 11, 2007.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
FERC’s New Reliability Initiatives Kevin Kelly Director, Policy Analysis, OMTR Federal Energy Regulatory Commission NARUC Annual Meeting Nashville, TN.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
Overview of WECC and Regulatory Structure
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Status Report for Critical Infrastructure Protection Advisory Group
1 August 14, 2003 Blackout MAC Meeting October 8, 2003 Paul Murphy IMO.
Mandatory Electric Reliability Standards and Transmission Expansion Suedeen G. Kelly Commissioner Federal Energy Regulatory Commission The Canadian Institute.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
Bill Lewis, Compliance Team Lead NERC Reliability Working Group May 16, 2013 Texas RE Update Talk with Texas RE April 25, 2013.
1 RIC 2009 Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation George Wilson NRR/ADES/DE/EEEB March 11, 2009.
RELATIONSHIP BETWEEN COMPETATIVE POWER MARKETS AND GRID RELIABILITY PJM RTO EXPERIANCE vis – a – vis PRACTICES FOLLOWED IN INDIAN GRIDS.
Standing Up The New Electric Reliability Organization Ellen P. Vancko North American Electric Reliability Council.
COMPLIANCE ROLLOUT Vann Weldon Compliance Training Administrator March 23, 2005 NERC FUNCTIONAL MODEL REVIEW.
Congestion Management in a Market Environment David Nevius Senior Vice President North American Electric Reliability Council.
CIP Version 4 The Basics. CIP Version 4- Background Centers around expanded criteria for Critical Assets – FERC thought Risk Based Methodologies used.
1 Power System Restoration. 2 Not Active 3 4 Compliance Audit Process APPA E&O Technical Conference – Atlanta April 16, 2007.
1 MOSC Presentation Grid Collapse 2003 September 22/2004 Information is preliminary subject to ongoing investigations Certain material is from NERC and.
Impacts and Actions Resulting from the August 14, 2003 Blackout Minnesota Power Systems Conference November 2, 2003.
SEMINAR PRESENATATION ON WIDEAREA BLACKOUT (AN ELECTRICAL DISASTER) BY:Madhusmita Mohanty Electrical Engineering 7TH Semester Regd No
Reliability Standards Committee 2009 Scope and Plan Judith James Manager, Reliability Standards.
NERC Reliability Readiness The Next Steps
Kenneth Silver Los Angeles Department of Water & Power
MOPC Meeting Oct , 2016 Little Rock, AR
“FRCC RESTORATION PLAN (BLACKOUT & BLACK START)” - TRAINING -
Phil O’Donnell, Manager Operations and Planning Audits
NERC TPL Standard Overview
Joint U.S.-Canada Power System Outage Investigation
Impacts and Actions Resulting from the August 14, 2003 Blackout
Phil O’Donnell, Manager Operations and Planning Audits
Overview of WECC and Regulatory Structure
Presentation transcript:

NERC Compliance An NWP Perspective Robert Ford Reliability Compliance Program Manager Operations Division Portland District US Army Corps of Engineers 09 August 2012

Northeastern Blackout August 14, 2003 On August 14, 2003, large portions of the Midwest and Northeast United States and Ontario, Canada, experienced an electric power blackout. The outage affected an area with an estimated 50 million people and 61,800 megawatts (MW) of electric load in the states of Ohio, Michigan, Pennsylvania, New York, Vermont, Massachusetts, Connecticut, New Jersey and the Canadian province of Ontario. The blackout began a few minutes after 4:00 pm Eastern Daylight Time (16:00 EDT), and power was not restored for 4 days in some parts of the United States. Parts of Ontario suffered rolling blackouts for more than a week before full power was restored. Estimates of total costs in the United States range between $4 billion and $10 billion (U.S. dollars). In Canada, gross domestic product was down 0.7% in August, there was a net loss of 18.9 million work hours, and manufacturing shipments in Ontario were down $2.3 billion (Canadian dollars). Excerpt from the “Final Report on the August 14, 2003 Blackout in the United States & Canada”, from the U.S.-Canada Power System Outage Task Force, dated April 2004.

Northeast Blackout What Happened? Started with 3 Generators and 4 345kV Transmission Lines Generators – Unscheduled Shutdowns Conesville Unit 5 (375 MW) – 12:05 PM Greenwood Unit 1 (785 MW) – 1:14 PM Eastlake Unit 5 (597 MW) – 1:31 PM Transmission Stuart – Atlanta – 345kV – Brush Fire – 2:02 PM Harding-Chamberlain – 345kV - Unknown – 3:05 PM Hanna-Jupiter – 345kV – Vegetation Contact – 3:32 PM Star-South Canton – 345kV – Unstable – 3:41 PM The Event then cascaded to affect major portions of the Northeastern US and parts of Canada.

Northeast Blackout The Result NEW YORK CITY TORONTO, CANADA

Northeast Blackout Root Causes Inadequate System Understanding Failure to assess and understand the inadequacies of the power system and to even have systems on-line to evaluate the system. Inadequate System Awareness Didn’t understand the deteriorating condition of the power system. Some detection systems were off-line at the time. Inadequate Tree Trimming Failure to manage growth in transmission right of ways. Inadequate Real-time Contingency Diagnostic Support Failure of Interconnected Grid Reliability Organizations to provide assistance to the system. In fact, one major provider opened its lines to isolate it from the disturbance.

Northeast Blackout Relevant Quotes “Our investigation leads to the conclusion that electric reliability has been seriously compromised by the fragmented and ineffective regulation of the electric transmission system.” Michigan Public Service Commission “The FirstEnergy operator still seemed unsure about exactly what was happening.” NERC Analysis of the 2003 Northeast Blackout ``We are a major superpower with a third-world electrical grid.'' Gov. Bill Richardson of New Mexico ``If there had been more lines available at the time this event occurred, it's possible they could have absorbed the load and kept the failure from spreading.'' Jack Hawks, vice president for planning of the Electric Power Supply Association

Enter The Energy Policy Act of 2005 Enacted, by Congress, in response to the 2003 Northwest Blackout Calls for sweeping standards designed to make the Bulk Electric System more robust and reliable Intended to be an industry “partnership” process

What is the Bulk Electric System? The Bulk Electric System (BES): More than $1 trillion (U.S.) in asset value More than 200,000 miles—or 320,000 kilometers (km) of transmission lines operating at 230,000 volts and greater. More than 950,000 megawatts of generating capability. Nearly 3,500 utility organizations serving well over 100 million customers and 283 million people. NERC Reliability Compliance Standards deal with Generation and Transmission Assets that are connected to the Bulk Electric System (BES).

Compliance Organization This slide illustrates the relationship of different entities with regard to compliance. NERC could be described as a contractor hired by FERC. The Western Electrical Coordinating Council is our Regional Reliability Organization.

Regional Reliability Organizations Compliance now affects all who have a share in the scheduling, generation, transmission, distribution, and sale of the bulk electrical power supply system in the US, Canada and parts of Mexico. NERC – North American Electric Reliability Council FERC – Federal Energy regulatory Commission WECC – Western Electric Coordinating Council MRO – Midwest reliability Organization SPP – Southwest Power Pool SERC – Southeastern Electric Reliability Council RFC – Reliability First Corporation NPCC – Northeast Power Coordinating Council FRCC – Florida Reliability Coordinating Council ERCOT – Electric Reliability Council of Texas

NWD Registered Entities Reliability Compliance Program Managers (RCPMs) Northwest Division Portland District – Robert Ford Seattle District – Matt Walden Walla Walla District – Robert Wall Omaha District – Gary Hinkle Kansas City District – Christopher Sickler

NERC Reliability Standards Resource & Demand Balancing (BAL) Sets standards and procedures for the balancing of load with that of demand including: Disturbance Control, Contingency Reserve, Frequency Response, Automatic Generation Control. Communications (COM) Ensures that all players associated with the Generation to Transmission Mission have adequate tools and techniques for efficient communication. Critical Infrastructure Protection (CIP) Sets down standards for protection of physical and logical access to cyber assets determined to be critical to the Bulk Electric System. Resource and Demand Balancing BAL-005 All generation, transmission, and load operating within an Interconnection must be included within the metered boundaries of a Balancing Authority Area.

NERC Reliability Standards Emergency Preparedness & Operations (EOP) Preparation & Planning for “less than normal” conditions including: Emergency Operations Planning & Preparation, Load Shedding Plans, Disturbance Reporting, System Restoration Plans (Blackstart), Loss of Control Centers Facilities Design & Connections (FAC) Establishes connection & performance requirements for Transmission and Generator Owners including Facility Ratings, Vegetation Controls & Maintenance, Operating Limits, New Facility Planning Each project must have a procedure for recognizing sabotage to power system as opposed to vandalism. Must have a procedure for reporting to power system authorities. Must have a procedure for reporting to the FBI and other Law Enforcement.

NERC Reliability Standards Interchange Scheduling & Coordination (INT) Deals with coordination and communication between regional energy power system entities Interconnection Reliability Operations & Coordination (IRO) Mandates planning and coordination of transmission and generation operations of BES Assets Modeling, Data & Analysis (MOD) Provides requirements for the documentation, modeling and forecasting of BES Assets CIP-002 Identify Critical Assets/Critical Cyber Assets. CIP-003 Develop Security Management Controls for Critical Cyber Assets.. CIP-004 Training and Background Checks for Personnel with Physical and Cyber Access to Cyber Assets. CIP-005 Develop an Electronic Security Perimeter for Critical Cyber Assets.

NERC Reliability Standards Nuclear (NUC) Requires coordination between Nuclear Plant Generator Operators and Transmission Entities. Personnel Performance, Training & Qualifications (PER) Provides standards for the staffing, qualifications & training of System and Transmission Operators Protection & Control (PRC) Provides requirements for installation, coordination and communication of BES Asset Protection Circuits Circuit Breakers, relays, etc. Resource and Demand Balancing BAL-005 All generation, transmission, and load operating within an Interconnection must be included within the metered boundaries of a Balancing Authority Area.

NERC Reliability Standards Transmission Operations (TOP) Provides operational & coordination requirements for Transmission System Operators Transmission Planning (TPL) Provides system performance & self-assessment requirements for Transmission System Operators Voltage & Reactive (VAR) Provides operational, coordination and communication requirements for BES Transmission and Generation Assets with respect to voltage control CIP-006 Develop and Maintain Physical Security of Critical Cyber Assets. CIP-007 Critical Cyber Systems Security Management. CIP-008 Incident Reporting and Response Planning for Critical Cyber Assets. CIP-009 Recovery Plans for Critical Cyber Assets.

NERC Reliability Standards Possible interest to FPOM Project Access CIP – Restricts physical access to those individuals that have a verified need, training and identification verification. System & BiOP Operations & Planning EOP – Sets definite procedures for System Restoration, Emergency Operations & Load Shedding IRO – Sets down requirements and procedures for advanced date and current day coordination of operations of the BES. MOD - Requires model validation testing of generation units which, without proper planning, may be in conflict with seasonal passage criteria. TOP – Sets requirements for Outage Coordination. Bottom Line: The NERC Standards adds yet another authority into the mix of agencies that determine the operating characteristics of Federal and Private generation assets in the Northwest. Resource and Demand Balancing BAL-005 All generation, transmission, and load operating within an Interconnection must be included within the metered boundaries of a Balancing Authority Area.

Questions ????