11 T Dipole for DS Status of CERN Activities M. Karppinen CERN TE-MSC On behalf of B. Auchmann, L. Bottura, B. Holzer, L. Oberli, L. Rossi, D. Smekens,

Slides:



Advertisements
Similar presentations
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

LQ & LM Status & Plan for FY08 – Fred Nobrega 1 LARP Collab. Meeting – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC Long Quadrupole (LQ)-Long Dipole.
Mikko Karppinen Nb3Sn Coil Production for 11 T Dipole Model Magnets.
Preliminary Design of Nb 3 Sn Quadrupoles for FCC-hh M. Karppinen CERN TE-MSC.
Raúl Morón Ballester TE-MSC-LMF
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
IR Quad Cost Estimate Status Marc Kaducak 02-Nov-2012 IR Quad Cost Estimate - M. Kaducak1.
Collaboration Mtg, St Charles, IL 10/5-6, 2005 A. Ghosh1 Conductor R&D Plan Arup K. Ghosh BNL.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
SMC Plans for new SMCs for Fresca2 program J.C. Perez EUCARD-WP7-HFM Short Model Coil review 12 December 2011.
Thoughts about the MQXF development plan P. Fessia Thanks to discussions within the MDT section (P. Ferracin, J. C. Perez, E. Todesco, P. Ferracin), L.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
HiLumi-LHC / LARP Conductor and Cable Internal Review October 16 th and 17 th 2013 H. Felice LARP Short Magnets Fabrication and Test experience relevant.
11-T Dipole Collaboration Review Cold Mass Fabrication and Tooling Procurement F. Savary, with contributions from B. Auchmann, E. Grospelier, S. Izquierdo.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
11 T Dipole Experience M. Karppinen CERN TE-MSC On behalf of CERN-FNAL project teams The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded.
Eucard-WP7-HFM 9 th Collaboration Meeting at Warsaw University of Technology Status on SMC & RMC Models J.C Perez on behalf of SMC collaboration team.
LHC IR UPGRADE - PHASE I CORRECTOR STATUS UPDATE N. Dalexandro, N. Elias, M. Karppinen, J. Mazet, J-C. Perez, D. Smekens, G. Trachez 03/02/10M. Karppinen.
F. Savary. Click here to add footer 2 Outline Context Constraints & Boundary conditions Project plan Production strategy A few words on QA Conclusions.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) SMC E U CARD WP7 HFM S TATUS UPDATE MEETING O CTOBER 2011 J.C. Perez.
11 T Dipole Informal Coil and Assembly Readiness Review CERN September 2013 Review committee: Herman Ten Kate CERN (Chair) Fred Nobrega FNAL Davide.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
F. Savary Question 1 A. Magnet design criteria for the prototype and production magnet to be tested before the installation into the tunnel.
Conductor Review Oct 16-17, 2013LARP Strand :Specs. Procurement, Measurement- A. Ghosh1 LARP Strand: Specifications, Procurement and Measurement Plans.
11 T Dipole Project Goals and Deliverables M. Karppinen on behalf of CERN-FNAL collaboration “Demonstrate the feasibility of Nb3Sn technology for the DS.
Outline: Strand R&D and strand procurement and inventory. Main parameters of the cable without a core. Results obtained during the cable development without.
Summary The process and the components The tooling Production back log estimation The handles and the estimated cost and delay.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
11 T Dipole Status May 2012 M. Karppinen CERN TE-MSC On behalf of CERN-FNAL collaboration.
24 Th January Status of the Conductor Development Status of the manufacturing for Alstom Status of the manufacturing for SMI L. Oberli.
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN.
SQXF Cu Cable Winding Test at LBNL Dan Cheng Dec 17, 2013.
29 th September 2009 EuCARD-WP7 HFM Conductor specification and procurement Luc OBERLI CERN, TE-MSC-SCD.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
LARP Collaboration Meeting 15 Nov 1-3, 2010 A2C- Materials Working Group Arup Ghosh (coordinator), Emanuela Barzi, Dan Cheng, Dan Dietderich, Soren Prestemon,
LARP CM15, SLAC, 11/3/2010GianLuca SabbiSummary of MS Parallel Sessions Summary of Magnet Systems Parallel Sessions GianLuca Sabbi LARP Collaboration Meeting.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
CERN Cabling Experience FRESCA 2, 11 T Dipole and MQXF A. Ballarino
Procurement Status Miao Yu 11/19/2013.
Coil Design and Fabrication
Model magnet test results at FNAL
11 T Dipole Integration & Plans M. Karppinen
ESAC Review February 2013 CEA Saclay
11 T cable development and procurement strategy at CERN
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
J.C. Perez on behalf of SMC collaboration team J.C. Perez
CERN Conductor and Cable Development for the 11T Dipole
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
Mechanical stability and QXF coil winding
To be presented at Nb3Al R&D Review,
Procurement of Nb3Sn strand for coils assembled at CERN
P. Ferracin and G. Ambrosio
the MDP High Field Dipole Demonstrator
11 T Dipole Project Overview and Status
SMC Design overview of the construction and project issues
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
MQXF updates P. Ferracin October 9th, 2014.
Presentation transcript:

11 T Dipole for DS Status of CERN Activities M. Karppinen CERN TE-MSC On behalf of B. Auchmann, L. Bottura, B. Holzer, L. Oberli, L. Rossi, D. Smekens, T. Sahner, L. Favre

11 T Activities 2-in-1 Demonstrator – EM-design optimization has started – Structural analysis in progress – Tooling design based on FNAL tooling is in progress – Quench analysis has started – Cabling trials (14.7 mm) imminent Beam dynamics studies in progress Cryo-magnet integration including (cryo-)collimator will commence in Q3 Common activities with other CERN HFM projects: – Sc-strand and cable, insulation, impregnation, reaction, thermal models, quench analysis, instrumentation etc.. May 13, 2011 Collaboration meetingM. Karppinen CERN TE-MSC2

May 13, 2011 Collaboration meetingM. Karppinen CERN TE-MSC3 Mid in-1 #2 CERN Coils Mid in-1 #2 CERN Coils End in-1 Demo End in-1 Demo End m Model End m Model End in-1 #1 FNAL Coils End in-1 #1 FNAL Coils

May 13, 2011 Collaboration meetingM. Karppinen CERN TE-MSC4

Status of cable production at CERN (1/2) 15.1 mm, 40 strands cable produced in 2010 and beginning 2011 (0.7 mm Cu and OST 108/127 stack material) – Stable key-stoned cabling at pitch 90 mm – Average cabling degradation on OST 108/ mm stack is 2.7 % at 12 T, 4 % at 11 T (good) – Maximum single strand degradation observed is 7 % May 13, 2011 Collaboration meetingM. Karppinen CERN TE-MSC5

Status of cable production at CERN (2/2) 14.7 mm, 40 strands tools being finalized (mandrel OK, rollers to re-touch). Cabling imminent OST 108/ mm strand order status – 4.7 km delivered (Jc > 2500 A/mm 2, RRR ≈ 70) – 25 km expected by May 31 st (delivery to be verified) Bruker PIT 0.7 mm strand order status – Specifications prepared – Meeting at Hanau on May 31st May 13, 2011 Collaboration meetingM. Karppinen CERN TE-MSC6

Cable Insulation Development S-glass braiding (on 4.5 mm cable) May 13, 2011 Collaboration meetingM. Karppinen CERN TE-MSC7

Coil Fabrication Tooling The Fermi mandrel design is being adapted to our winding and curing tooling. The mandrel blocks have been redrawn and converted metric & ISO. Price enquiry to launch this week. MB (Jeumont) curing moulds will be used for curing the binder – Spacers, oil circuits connections, coil handling tools to design May 13, 2011 Collaboration meetingM. Karppinen CERN TE-MSC8

Winding Tooling May 13, 2011 Collaboration meetingM. Karppinen CERN TE-MSC9

End Spacers CNC-machined set #1 complete (minimum strain design) Lead-time at CERN 8-10 weeks/set Industrial procurement: – 3 offers for 5-axis machining (to confirm after decision on spacer design) – Lead-times 6-10 weeks for the 1 st set – Relatively high programming and tooling cost SLS as fallback solution May 13, 2011 Collaboration meetingM. Karppinen CERN TE-MSC10

Curing Tooling Recycle LHC MB moulds – Spacers and base plate being designed – Longest available block 1960 mm – Oil circuit to refurbish – Dimensional control to do Re-use LHC MQ curing press May 13, 2011 Collaboration meetingM. Karppinen CERN TE-MSC11

2-in-1 Structural Analysis May 13, 2011 Collaboration meetingM. Karppinen CERN TE-MSC12 Pre-loading at the pole

Summary 11 T Dipole project is progressing on several fronts at CERN: – EM studies – Quench analysis – Structural analysis – Beam optics studies – Cable development – Tooling design & procurements Coil winding is expected to commence in Nov- Dec this year May 13, 2011 Collaboration meetingM. Karppinen CERN TE-MSC13