FUKUSHIMA RESPONSE George Attarian 1/21/2013. Fukushima Response Timeline: March 11: Event occurred March 18: INPO IER 11-1 issued (April 15) March 23:

Slides:



Advertisements
Similar presentations
Regulatory Implications of Fukushima for Nuclear Power Plants in the U
Advertisements

Fukushima Regulatory Impacts
INPO Update CMBG Meeting June 2013
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
Presented by: Muhammad Ayub Pakistan Nuclear Regulatory Authority Safety Enhancement at Nuclear Power Plants in Pakistan Prospects of Nuclear Energy in.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
ANS RESPONSE TO FUKUSHIMA LESSONS LEARNED Presented to: NESCC November 29, 2012 Washington D.C. Donald J. Spellman, Chair ANS Standards Board American.
Vermont Yankee Presentation to VSNAP 7/9/12 VY/Entergy Fukushima Response Bernard Buteau.
NRC Perspective of Recent Configuration Management Issues Tom Farnholtz Chief, Engineering Branch 1 Division of Reactor Safety, Region IV June 2014 CMBG.
LFR plant assessment against a Fukushima-like scenario Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European.
US NRC Protective Action Recommendation Study National Radiological Emergency Preparedness Conference April 10, 2008 Las Vegas, NV Randy Sullivan, CHP.
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
Lindy Hughes Fleet Fire Protection Program Engineer Southern Nuclear Operating Company June 4, 2013 Fire Protection.
Oconee RPS/ESPS Digital Upgrade Presented by: Michael Bailey June 3,
Federal Emergency Management Agency Radiological Emergency Preparedness Program Region I, Boston September 10, 2012.
Fukushima Incident Preliminary Analysis, Consequences and Safety Status of Indian NPPs Part-1 Dr. S.K.Jain Chairman & Managing Director NPCIL & BHAVINI.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
State-of-the-Art Reactor Consequence Analyses (SOARCA)
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
NEI Presentation on Nuclear Decommissioning Trust (NDT) Use Concerns.
Outcome of the EU Nuclear Safety Stress Tests Andrej Stritar Chairman, ENSREG.
NHUG - Boston - 08/04/20101 Considerations for Operability of Chillers and Chilled Water Systems NHUG Summer Meeting August 4, 2010 Tim Mitchell Component.
What about Japan?. Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6.
1 BREI Conducted Comprehensive Independent Reviews of Passive Heat Removal Systems with Ejectors-Condensers Euratom DEEPSSI Project for the design and.
1 RIC 2009 MELCOR Analyses to Address Regulatory Issues: Evaluation of System Success Criteria Hossein Esmaili USNRC March 12, 2009.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
TACIS Project: R8.01/98 – TRANSLATION, EDITING AND DIFFUSION OF DOCUMENTS (Result Dissemination) Probabilistic Safety Analysis Technology (PSA) TACIS R3.1/91.
Configuration Management of Post-Fukushima Regulations CMBG June 2013 David Gambrell Director, Severe Accident Management Southern Nuclear.
Fukushima Lessons Learnt and Follow-up Activities of Rostechnadzor Alexey Ferapontov, Acting Chairman Second European Nuclear Safety Conference
PH 8.01/99 - Seminar, Brussels, 9 November 2005 PH 8.01/99 – Seminar on “Dissemination of PHARE projects description and results” Overview of BG PHARE.
1 NEI Process Discussion. 2 Topics for Discussion Relationship to NFPA 805 Relationship to Regulatory Guide Technical Process currently in NEI
March 11, 2011 to Present. Presentation Overview Reactor Design and FeaturesChronology of EventsCurrent Status of Each ReactorRecovery Actions Kashiwazaki-Kariwa.
NRC Region I Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2010 NRC Region I Joint Exercise.
Summary of Session 3 Post-Fukushima Operational Safety Improvements 1 Fred Dermarkar IAEA International Conference on Operational Safety Vienna International.
Teknologi Pusat Data 12 Data Center Site Infrastructure Tier Standard: Topology Ida Nurhaida, ST., MT. FASILKOM Teknik Informatika.
Breakout Session V: Mitigation Strategies for Beyond Design Basis External Events (NTTF Recommendation 4.2) Fukushima Regulatory Response Workshop April.
MEHB 513 Introduction on nuclear technology assignment GROUP MEMBERS:ID: SEEH CHONG CHIN ME YEE QIAN WAHME TING DING PINGME LIM JIA YINGME
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Enhancing Safety at America’s Nuclear Energy Facilities U.S. Industry’s Fukushima Response Joseph Pollock, Nuclear Energy Institute Christopher H. Mudrick,
Enhancing Safety at America’s Nuclear Energy Facilities U.S. Industry’s Fukushima Response Joseph Pollock, Nuclear Energy Institute Christopher H. Mudrick,
Post-Fukushima Severe Accident Management Update Kim, Hyeong Taek KHNP- Central Research Institute July KINS Safety Analysis Symposium.
FLEX Mitigation Strategies Overview (Rec 4.2) Fukushima Regulatory Response Workshop April 5, 2012.
Response to NRC Information Requests for NTTF Recommendation 9.3 Sue Perkins-Grew Director, Emergency Preparedness NEI.
Version 1.0, May 2015 SHORT COURSE BASIC PROFESSIONAL TRAINING COURSE Module V Safety classification of structures, systems and components This material.
Defense-in-Depth and Mitigative Measures
Spent Fuel Pool Instrumentation NRC Order EA
Janet R. Schlueter Senior Director, Radiation and Materials Safety
Office of Nuclear Materials Safety and Safeguards
10 CFR Part 61 Low Level Waste Disposal Rulemaking Update
LLW Forum Meeting October 16, 2017 Alexandria, Virginia
Joseph D. Anderson, Chief
Flooding Walkdown Guidance
Mitigation of Beyond Design Basis Events (MBDBE) Rule Implementation
U.S. NRC – Today and Tomorrow
NRC Cyber Security Regulatory Overview
Diversity analysis for advanced reactor design
Robert Kahler Branch Chief
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions
BASIC PROFESSIONAL TRAINING COURSE Module III Basic principles of nuclear safety Case Studies Version 1.0, May 2015 This material was prepared.
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
Grid Stability and Safety Issues Associated With Nuclear Power Plants
Session Name: Lessons Learned from Mega Projects
Decommissioning Rulemaking
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
TRTR Briefing September 2013
Version 1.0, May 2015 SHORT COURSE
BWROG – Emergency Procedures and Severe Accident Guidelines (EPG/SAG) Revision 4 Highlights Ken Klass (Talen Energy), Lesa Hill (Southern Nuclear) & Phillip.
New Regulatory Requirements in Japan
Safety Standards Committee meetings 24th TRANSSC meeting Agenda item 3
Presentation transcript:

FUKUSHIMA RESPONSE George Attarian 1/21/2013

Fukushima Response Timeline: March 11: Event occurred March 18: INPO IER 11-1 issued (April 15) March 23: NRC TI 2515/183 issued (May 13) April 25: INPO IER 11-2 issued (September 20) April 19: NRC TI 2515/184 issued (June 30) May 11: NRC Bulletin issued (July 11) June 8: NEI The Way Forward issued July 12: NRC NTTF issued August 1: INPO IER 11-4 issued (January 28) August 1: INPO Equipment Survey issued (November 4)

Fukushima Response Timeline September 1: INPO IER 11-1 Supplement issued (March) September 9: NRC SECY issued, SRM issued October 18 October 3: NRC SECY issued, SRM issued November 8 December 14: NRC holds first public, issue specific meetings on SECY January 18-19:NRC holds second public issue specific meetings and presents draft 50.54(f) letter with enclosures March 9: 50.54(f) letter and enclosures and Orders issued to the Licensee for Tier I NTTF’s

Fukushima Response NRC Near Term Task Force (NTTF) Recommendations (12) Clarifying The Regulatory Framework (1) Ensuring Protection (2) Enhancing Mitigation (5) Strengthening Emergency Preparedness (3) Improving the Efficiency of NRC Programs (1)

Fukushima Response NTTF Impact NTTF 2.1 Flood and Seismic 50.54(f) letter to licensee New flood analysis beyond design basis Seismic currently following GI 199 NTTF 2.3 Walkdowns 50.54(f) letter to licensee Walk down the site for all external design basis events: flood; seismic, other external events NTTF 4.1 SBO Rule making

Fukushima Response NTTF Impact NTTF 4.2 By order Additional pumps and related equipment FLEX approach NTTF 5.1 Harden Vents By order BWR Mark I & II only Filtration system not in order NTTF 7.1 Spent Fuel Pool Instrumentation By order Level only Primary and backup Control Room or Alternate Shutdown monitoring Qualifications

Fukushima Response NTTF Impact NTTF 8 EDMG EOP SAMG integration Rule making NTTF 9.3 Emergency Preparedness Staffing 50.54(f) letter to licensee Extension of the EP Rule Staffing impact to multiple Unit plant sites Communication guidance

Station Blackout Definition 10CFR50.2 Definition The complete loss of alternating current (ac) electric power to the essential and nonessential switchgear buses in a nuclear power plant. Station blackout does not include the loss of available buses fed by station batteries through inverters or by alternate ac sources as defined, nor does it assume a concurrent single failure or design basis accident.

Alternate AC Sources An alternating current (ac) power source that is available to and located at or nearby a nuclear power plant and meets the following requirements: Is connectable to but not normally connected to the offsite or onsite emergency ac power systems; Has minimum potential for common mode failure with offsite power or the onsite emergency ac power sources; Is available in a timely manner after the onset of station blackout; and Has sufficient capacity and reliability for operation of all systems required for coping with station blackout and for the time required to bring and maintain the plant in safe shutdown (non-design basis accident)

Current NRC Rule 10CFR Loss of all alternating current power (a) Requirements. (1) Each light-water-cooled nuclear power plant licensed to operate must be able to withstand for a specified duration and recover from a station blackout as defined in § The specified station blackout duration shall be based on the following factors: (i) The redundancy of the onsite emergency ac power sources; (ii) The reliability of the onsite emergency ac power sources; (iii) The expected frequency of loss of offsite power; and (iv) The probable time needed to restore offsite power.

Current NRC Rule (cont’d) (2) The reactor core and associated coolant, control, and protection systems, including station batteries and any other necessary support systems, must provide sufficient capacity and capability to ensure that the core is cooled and appropriate containment integrity is maintained in the event of a station blackout for the specified duration. The capability for coping with a station blackout of specified duration shall be determined by an appropriate coping analysis. Licensees are expected to have the baseline assumptions, analyses, and related information used in their coping evaluations available for NRC review.

Regulatory Guide Reg. Guide 1.155, Station Blackout Specifies a method acceptable to the NRC staff for complying with 10CFR50.63 Twenty four pages of detailed guidance EDG Target Reliability Levels Restoration of Offsite Power Ability to Cope with a Station Blackout Quality Assurance Guidance for Non-Safety Systems and Equipment

NUMARC Guidelines and Methodologies for Implementing the Nuclear Management an Resources Council (NUMARC) Station Blackout Initiatives Three Hundred Pages of Detailed Guidance, Examples, Topical Reports, and Questions & Answers Endorsed by Reg. Guide as Acceptable Guidance for Compliance to 10CFR50.63 Contains Detail Beyond Reg. Guide 1.155

Typical Results Plant Specific SBO Coping Analyses Produced Specifies How Long You Have to Cope Without AC Power Typically 4 or 8 hours Specifies How Coping is Achieved Batteries, alternate ac power, RCS leak rates, water sources, pumps, instrumentation & control, etc. Requires Containment Isolation Typically Addresses Pre- Hurricane Preparations for Coastal Plants Excludes Concurrent Design Basis Events Assumes Restoration of at Least One Source of Offsite or Onsite AC Power is Successful Before the Coping Period Ends

Typical Limitations Beyond SBO Coping Battery Depletion Water Sources Run Out – CST Inventory RCS Inventory Losses - PWR RCP Seal Leakage BWR Suppression Pool Heat-up & Saturation Emergency Lighting Battery Packs Deplete Increasing Manual Actions for Available Personnel as SBO Time Increases

Beyond SBO Coping Strategies Medium Size Generators to Re-Energize Battery Chargers Emergency Engine Driven Pumps to Replenish Water Sources – CST Make-up Medium Size Generators and Pumps to Restore RCP Seal Injection RCP Shutdown Seal Package Designs to Limit Leakage BWR Hardened Wetwell Venting Systems and Suppression Pool Make-up with Cool Water Helmet Mounted LED Lights for Personnel or Longer Lasting LED Emergency Lights Pre-Plan and Pre-Stage More Emergency Equipment to Make Manual Actions Easier and Train More Personnel to Use it

What is FLEX? Response to NRC Mitigating Strategies Order (EA ) Provides a diverse and flexible means to prevent fuel damage while maintaining containment function in beyond design basis external event conditions resulting in an: Extended Loss of AC Power, and Loss of Normal Access to the Ultimate Heat Sink Objective: Establish an essentially indefinite coping capability by relying upon installed equipment, onsite portable equipment, and pre-staged offsite resources 17

Diverse & Flexible Coping Capability (FLEX) 18 Protection of Plant Equipment Prevention of Fuel Damage Design Basis External Events SBO Coping Capability SAMGs Emergency Plans Design Basis External Events SBO Coping Capability SAMGs Emergency Plans Increased Defense-in- Depth Diverse & Flexible CopingStrategy (FLEX) Emergency Response CurrentCurrent plus FLEX

Tier 1 FLEX Approach 19

FLEX Mitigation Strategies FLEX employs a three phase approach: Phase 1 - Initially cope by relying on installed plant equipment, Phase 2 - Transition from installed plant equipment to onsite FLEX equipment, Phase 3 - Obtain additional capability and redundancy from offsite equipment until power, water, and coolant injection systems are restored or commissioned. Diverse and flexible to enable deployment of the strategies for a range of initiating events and plant conditions 20

Representative High-level Example (BWR) Phase 1 Initial Coping Capability Use RCIC for RPV makeup from suppression pool Rely on DC Power for key instrumentation and controls Phase 2/3 Extended Coping Capability Charge battery to maintain DC power Use Reliable Hardened Vent for containment heat removal Provide extended RPV makeup with portable pump 21

Representative High-level Example (PWR) Phase 1 Initial Coping Capability Turbine-driven AFW for SG makeup from Condensate Storage Tank Rely on DC Power for key instrumentation and controls Phase 2/3 Extended Coping Capability Charge battery to maintain DC power Provide extended SG makeup with portable pump Provide RCS makeup with portable pump, as needed 22

NRC Advance Notice of Rule Making Rule Making Objectives What specific objectives should the SBO rule be designed to achieve? How should actions taken in the NTTF 4.2 be used? What regulatory approach to SBO mitigation that follows the conceptual approach outlined in NTTF 4.1? How can regulatory action in NTTF 8.0 be best integrated with SBO? How can regulatory action in NTTF 5.1 be best integrated with SBO? How can regulatory action in NTTF 7.1 be best integrated with SBO?

NRC Advance Notice of Rule Making Relationship between 10CFR and the new SBO rule Keep existing rule and supplement with scenarios that go beyond the existing rule. Integrate existing rule with new requirements into a new rule for SBO. Supersede the existing SBO rule with an enveloping rule. Comments have been submitted, ACRS meeting to be held. Ball in NRC court.