PROJECT 1 Pulse FM Nathaniel Gray - 201168185. Outline of Proposed Development Scope of proposed development ‘Pulse FM’ is a local Geelong community radio.

Slides:



Advertisements
Similar presentations
Special Bulletin St Patricks Parish, Ringsend & Irishtown Saturday 5 th / Sunday 6 th February 2011 Issue No. 06 A / 2011 (012A) Parish Office:
Advertisements

PRESENTATION ON TURNKEY CONSTRUCTION.
A Presentation by Alec McHarg on Regional and Urban Sustainable Issues… As part of a sustainable and Socially Cohesive Society… Deep in our culture is.
Andrew renfree PULSE - home. andrew renfree PULSE - home.
Example of an Appropriate Development Concept for the Hine Junior High School Site This concept is an example of how the site could be developed for the.
1. Background 2. Design 3. Cost 4. Fundraising PLACE OF WORSHIP – there are around 500 members of St John’s and services are held throughout the week.
Dame Colet / Haileybury Youth Centre
Certificate in Digital Applications – Level 02 Creative Multimedia – DA202.
MOVIE THEATER BUILDING DESIGN OBJECTIVES: The student will learn to construct a building using various architectural elements. The students will work together.
Composition Elements Com Tech 1 WJ. Veldhoen. Visual Composition Visual composition delivers interesting messages with text and artwork…
Urban Art Bar. scrawl 2002 Objective To introduce modern day urban art to Scotland through a major part of it’s culture… Drink To become a part of the.
Commercial Building Project Portfolio
Lerman Architects & Town Planners Haifa University Library Expansion of the library and renovation of the existing area.
Senior Architect (WZ)I C.P.W.D.Mumbai MULTIPURPOSE HALL FOR SPORTS AUTHORITY OF INDIA GANDHINAGAR.
TWO POINT PERSPECTIVE procedure
Kapi’olani Community College Art 155 Information Architecture In-class Presentation Week 2B.
Blue Prints.
Design process. Design briefs Investigating Designing Producing Analysing and evaluating Design process wall charts.
Nicolas tye architects Where did the design go? School design.
Store Design Visual Merchandising 2. Store Design Visual Merchandising 2.
A2 Coursework EdExcel. Deciding on a project Do a thought shower of different ideas for a theme: – Don’t worry about what is possible at this stage –
Jacob Ruiz W# ET Senior Design Instructor: C. Koutsougeras Advisors: R. Rode May 9, 2014 Jacob Ruiz W# ET Senior Design Instructor:
Schematic Design Proposal Dan Rusnack 11/14/03 Lighting/Electrical option Thesis project The Hall Corporate Headquarters.
© 2008 Delmar, Cengage Learning Property Security, Emergency Response, and Fire Protection Systems Chapter 13.
Land Use Study for the Community of Winchester July 9, 2012.
POC-CENT: Core Four Group March 14, 2010 March 3, 20101POC-CENT (Univ. of Cincinnati)
Pre Production Concept Story Development Visual Development Technical Direction Production Management.
State-of-Meaning NDSU Area Transit and Bus Stop. Mission Statement “… To Preserve Essential Tradition By Recognizing the existing and adding Innovation.
Investment Project Century Tower, Larnaca, Cyprus.
Presented By: By: By: Web Address: Topic Number: Topic Number: Date: Date:
CITY OF RAINIER RAILROAD CROSSINGS 1. Project # 2 Team Members Portland State University City of Rainier Lars Gare, City Administrator ODOT Rail David.
Macquarie Fields Public School Early Stage 1: Kindergarten Design project This task was the first learning experience kindergarten students undertook in.
Roosevelt and Jackson Elementary Schools
Newseum and Freedom Forum Headquarters Washington, D.C. Ryan Wise Lighting/Electrical Option Consultant: Dr. Mistrick Dec. 14, 2007.
Lecture 15 - Timber Wall Framing Example
Working Technologically Early Stage 1 – Stage 3. Students evaluate by: recounting the steps taken to reach a final solution discussing their likes and.
Forest View Elementary School Everett, Washington Elementary School Project of Distinction DYKEMAN 2008 Exhibition of School Planning and Architecture.
IMPACT OF ADDITIONAL RESIDENTIAL DENSITY ON Redevelopment of North Toronto Collegiate Institute February 19, 2004 Architects Crang and Boake Inc. Teeple.
AT – 201 Introduction to Architecture Dan Trent August 28,
Aquatic Facility Concept Design. “Every Dog has its Day” Park Valley Pool Pool is 28 years old and nearing the 4-9 years of identified life expectancy.
Design Brief This is your opening statement of what you plan to do and what type of light you will be designing and making. First write an outline of the.
Refining the Use Cases 1. How Use Cases Evolve  Early efforts typically define most of the major use cases.  The refining stages complete the process.
Unique assets … of Glentrool: 1.Surrounded by forest 2.Local tourist attractions 3.Amazing local scenery and outdoor activities 4.Only village in the.
Alvar Aalto in Rovaniemi
TCS Multi-Professional Leadership Challenges Registration Guidance Document page 1 of 3 TCS Multi-Professional Leadership Challenges for all Primary &
This submission will be used by Area of Distinction Juries and the Caudill Class Jury. The slides may also be paired with jury comments in the Convention.
Recruitment and Selection. Recruitment Procedures WHY do we need to recruit? Promotion – old position becomes available 2. Retirement 3. Death 
To reach and transform our town with the love of Jesus Whitfield Parish Loving Jesus – Loving each other – Loving our town.
Chapter 5 Planning. Importance of Planning It could be said that nothing is more important in the development of a recreation facility than the planning.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission EA DA New NE MLK & Multnomah.
Submission Requirements & Instructions
The Victorian Games & Apps Challenge Design Brief (PowerPoint)
OCTOBER 2016 International BIM Competition 2017
Design V Prof. Jill Bouratoglou
Basics a modern, flexible and colourful society is locked in static and grey buildings as a result people flee into virtual worlds, games, internet, perfect.
HOUSES AND THE CONCEPT OF HOME FOR THE BRITISH
Construction Documents
City Council September 18, 2017
ِAcoustics الصوتيات , د. سعود صادق حسن .1 Arch 353
Design a sports and leisure centre complete with swimming pool which requires very little electrical energy from the national grid to run. Decide on the.
Chapter 5 Planning.
Commercial Building Project Portfolio
Architectural Drawings
OCTOBER 2016 International BIM Competition 2017
Building of Architecture
Graphic Communication
Architectural Drawings
115-Unit Mixed-Use Project (711 E
Stoke Medical Centre RIBA Plan.
RIBA Plan Tom Robinson sir david Swindells Vii
Presentation transcript:

PROJECT 1 Pulse FM Nathaniel Gray

Outline of Proposed Development Scope of proposed development ‘Pulse FM’ is a local Geelong community radio station that currently occupies an attractive position at 68 Little Ryrie Street. The station is looking to re-invent itself in order to make the station more relevant to the local community, and to make it a more viable venture. The building in question consists of studios, offices and a large amount of unused space. The design is to be finalised ultimately provide a more useable and efficient building for the station and provide avenues for the generation of income.

Qualities The site occupies a unique position in the Geelong CBD. It is very central and easily accessible by pedestrians, whilst also being off the main streets, which provides for a little more privacy. Views from the site are minimal, due to the height of some of the surrounding buildings. The internal mud-brick walls hold a certain intrinsic value, and are very unique to the site. They provide an opportunity to influence the internal feel of the building.

This image shows early development of the plan, and at the bottom of the page some ideas on the form of the building. The idea that the structure of the development is based on is a pulsating of ideas and values from the radio station out into Greater Geelong

Image showing more investigation into a simple, free-flowing internal layout. At this stage of development it was decided that a café would be an ideal commercial venture on this site due to the lack of café’s in the central Geelong area, and also due to the number of people that were going to be frequenting the site once developed. It was decided to incorporate a stage area where local acts could play to small audiences inside the café, and also be played out on live to air radio.

The roof structure of the existing building gave an opportunity to re- consider its entire form, as it was somewhat in disrepair, and it can simply be lifted off. The central mudbrick wall of the building provides a suitable structure from which to pitch a new roof. This elevation describes how the roof structure and west façade simply form a bioclimatic skin over the existing building.

NORTH FACADE WEST FACADE

As the brief required a managers office, and space for 4 other staff, I thought that a second storey was necessary, however, I investigated the incorporation of these facilities in the downstairs layout, and came up with this design for the four office space. The space provides privacy for each person, but also promotes a sense of team, and a feeling of being part of a bigger whole.

Final Floor Plan

Diagram showing flow of spaces

This pictorial shows the west façade with sails attached to the upright posts. These sails are used to enclose the sound hallway, but can also be employed as signage or for local artwork.

The sound hallway creates a passage way where users experience sound, light, and shadow

Internal Perspective from stage

Perspective looking to front of building

Perspective of Sound Hall

Construction Concept – Roof connection detail

Central Design ideas and concepts PULSE FM BEING AT THE HEART OF THE GEELONG COMMUNITY the idea of stage and offices (people and Music) being at the centre of the building, reaching out – live music being broadcast AN INTEGRATION INTO THE COMMUNITY people can experience the atmosphere of the building without entering – the sound/light hall is inside the ‘skin’ of the building but its outside the building core. most approach to the building is from the west heading down Little Ryrie St. The entrance to the hallway is from Little Ryrie St, so people are drawn into it by the sound light and shadow. AN ADAPTABILITY AND CONNECTION OF SPACES to get away from putting a second storey on, spaces can have more than one use. Sections of the café can be transformed into meeting or training spaces. But all space remains connected, whether through sight, sound or light. This complete connection gives a welcoming atmosphere and encourages involvement.

ROOF FORM the roof form dictates the shape of the ceiling which promotes the permeation of sound and light through the entire building MUSIC TURNED INTO ARCHITECTURE this is reflected in the façade. The uprights represent the beat; the different heights represent different sounds, and the material in-between the uprights (fabric of sails and the timber louvers) represent a different filler sound between beats. There is a connection between the beat of the building and the ‘pulse’ of the building. This alludes to the connection of the heart of the radio station and the greater Geeling community.