Update on the bakelite gluing Feb 2002: first warning from BaBar  13 gaps (over 48) accepted (27%) (i.e. max 2 non contiguous unglued spacers)…the remaining.

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

RPC2010- Darmstadt- 9/12-Feb p.1 M. Abbrescia – University and INFN Bari New gas mixtures for Resistive Plate Chambers operated in avalanche mode.
27/02/2002M.D.P. - ATLAS Muon Week1 First results of Atlas RPC cosmic rays test Massimo Della Pietra Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M.
Development of high rate RPCs Lei Xia Argonne National Laboratory.
Status Update on Mechanical Prototype in Rome November 6,
Status of the LHCb RPC detector Giovanni Carboni - Roma 2 Introduction Detector requirements Ageing tests Oil vs. No-Oil Conclusions Report to LHCC - March.
Status of OPERA RPC production. A. Garfagnini Opera collaboration meeting Nagoya, 12 march 2002  RPC production at GT;  Schedule for OPERA in 2002; 
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
ATLAS RPC: Cosmic Ray Teststand at INFN Lecce G. Chiodini, M. Bianco, E. Brambilla, G. Cataldi, R. Coluccia, P. Creti, G. Fiore, R. Gerardi, E. Gorini,
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
UPDATE ON CMS RESISTIVE PLATE CHAMBERS CMS RPC Barrel Collaboration GR1, 5 Aprile 2004.
CMS - PAVIA1 Engineering Design Review RPC - BAKELITE.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
November 5, 2004V.Ammosov ITEP-Moscow, Russian CBM meeting 1 IHEP possible participation in CBM TOF system Vladimir Ammosov Institute for High Energy Physics.
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
RPC Development in Beijing and Potential for NO A Tianchi Zhao University of Washington May 16, 2005.
PLATE CHANGER for OIL microscopes Gabriele Sirri INFN Bologna for INFN Bologna and LNGS.
CLIC Workshop – CERN, October / 17 DC breakdown experiments for CLIC CERN, TS-MME Antoine Descoeudres, Trond Ramsvik, Sergio Calatroni, Mauro Taborelli.
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
RPC detection rate capability ≈ 1/ρ Float-Glass ( Ω-cm) RPC rate capability < Bakelite( Ω-cm) one. New kind of doped glass was developed.
Barrel RPC Chamber consists of 2 double-gaps, each equipped with a common plane of 96 strips read-out by 6 front-end boards. The two double- gaps have.
Bakelite surface vs Gap production Evaluation of First samples sent back from Korea Tests and QC of panels presently in GT Evaluation of second set of.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
RPCs of BESIII Muon Identifier  BESIII and muon identifier  R&D  Mass production  Installation Zhang Qingmin Advisor: Zhang Jiawen.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Gap Production for Upscope of the Endcap RPCs Sung Keun Park Korea Detector Laboratory Korea University February 5, 2010 Workshop on the Forward CMS RPC.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
M. Bianco On behalf of the ATLAS Collaboration
G. PassalevaRoma - July 28, 2004 Status of MWPC production site in Florence G. Passaleva.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
G. Carboni – Muon Meeting – RPC situation: RPC production in GeneralTecnica (GT) has suffered large delays, due to gluing problems (spacers)
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
Results from the CMS-RPC tests at CERN Gamma Irradiation Facility Roberto Guida CMS-RPC (Bari, Beijing, Napoli, Pavia, Sofia) Seoul, October 2005.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
Marcello Abbrescia Muon general meeting, Mon 29-Apr p. 1 R&D on improved RPCs for phase 2 upgrade M. Abbrescia on behalf of the RPC upgrade group.
Marcello Abbrescia RPCs for CMS during Phase II RPC rate capability M. Abbrescia, The dynamic behaviour of Resistive Plate Chambers, NIM A 533 (2004) 7–10.
19/6/2002S. Patricelli Muon week1 Status of RPC production (1) zThe leading production for RPCs is the the gas volume production at GT. All other items.
Test on installed RPCs with the gas mixture. Preliminary results. Alessandro Paoloni on behalf of the OPERA RPC Group (Bologna, LNF, LNGS, Napoli, Padova,
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Ian Crotty HPL (Bakelite) Low Eta TDR Up-Scope 05 Feb 10 HPL for the Up-Scope of the CMS RE Low Eta as per the 1997 TDR in CMS Contents Specification Contingency.
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
RPC Barrel EDR Chapter 3 3. Production and control of Bakelite 3.1 Definition and standards Standard bakelite electrodes are composed by a bulk made of.
For 2016 RPCWorkshop 1 Charge Distribution dependency on gap thickness of CMS endcap RPC Sung Park, KODEL, Korea Univ On behalf of the CMS RPC group 1.
Siena 2002 Siena, 24/10/2002 G. Passaleva New results from an extensive aging test on bakelite RPC G. Passaleva INFN Firenze.
New Bakelite production or Phase 2 Salvatore Buontempo (INFN, Naples & CERN) on behalf of CMS Central TC Group Atlas & CMS meeting RPC Phase 2, November.
Final results from an extensive aging test on bakelite Resistive Plate Chambers Stefano de Capua University of Rome II “Tor Vergata” and INFN.
14/02/2008 Michele Bianco 1 G.Chiodini & E.Gorini ATLAS RPC certification with cosmic rays Università del Salento Facoltà di Scienze MM.FF.NN.
J. Polinski, B. Baudouy -The NED heat transfer program at CEA CEA Saclay, January 11th NED heat transfer program at CEA NED heat transfer program.
Updated Resistivity measurement on Mm-Batch-4 Bakelite & RPC Bakelite sample measurements Liang Guan TGRPC R&D Biweekly meeting
Activity report from LNF Panels Soldering tests Production site and tooling status WPC miscellanea (+7 cm layout, cathode costs, aging tests)
Long-term environmental effects on the ARGO-YBJ RPC array studied with the Detector Control System P. CAMARRI 1, R. CARDARELLI 1, L. PALUMMO 1, C. VIGORITO.
QC Procedures of Gaps for RE4 RPCs in Upscope K. S. Lee, S.
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
S.Movchan Straw manufacturing and QC
Update on Pavia MM mechanical prototype
Production ad Quality control of RPCs for the CMS muon barrel system
Quality Control in Straw Production
RPC Production at GT A Mass scale RPC Production
Recent DHCAL Developments
GRPC activity for EuDHCAL in IHEP-Protvino
Han Jifeng BESIII MUON GROUP IHEP, CAS
BESIII RPC Detector Jiawen Zhang
Presentation transcript:

Update on the bakelite gluing Feb 2002: first warning from BaBar  13 gaps (over 48) accepted (27%) (i.e. max 2 non contiguous unglued spacers)…the remaining 73% had more than 8 unglued spacers. The gaps were produced with the new bakelite (more later on) Afterwards all other experiments had the same problem RPCs Production has been stopped and a R&D program setup to overcome the problem. Feb 2002: first warning from BaBar  13 gaps (over 48) accepted (27%) (i.e. max 2 non contiguous unglued spacers)…the remaining 73% had more than 8 unglued spacers. The gaps were produced with the new bakelite (more later on) Afterwards all other experiments had the same problem RPCs Production has been stopped and a R&D program setup to overcome the problem. The following refers to the results and conclusions of the RPC INFN committee (S.Morganti, S. Nuzzo et al.) The following refers to the results and conclusions of the RPC INFN committee (S.Morganti, S. Nuzzo et al.) CMS Week June 2002 P.Vitulo-Pavia University

What does it mean “New Bakelite” ? The firm that produces the bakelite for all the LHC experiments (and others) has enlarged his production capability, including.. substitution of melaminic and phenolic impregnation lines substitution of the press. i.e. The bakelite is made in the usual way but probably through new production cycles (one example: the press cycle at different temperature and time ?) Note: the factory has been producing in the new configuration since jul-sept 01 but the experiments were using old batches of bakelite What does it mean “New Bakelite” ? The firm that produces the bakelite for all the LHC experiments (and others) has enlarged his production capability, including.. substitution of melaminic and phenolic impregnation lines substitution of the press. i.e. The bakelite is made in the usual way but probably through new production cycles (one example: the press cycle at different temperature and time ?) Note: the factory has been producing in the new configuration since jul-sept 01 but the experiments were using old batches of bakelite

The hypothesis: The ungluing of the spacers from the new bakelite is due to surface characteristics (chemical). Two approaches: 1.Chemical/mechanical: realization of an automatic machine for the cleaning and brushing of the bakelite panels surfaces 2.Only mechanical: realization of an automatic machine that could locally mill the zone of the spacers and of the frame Solution 2 was discarded because it required > 4-5 months Solution 1 ready in 4-5 weeks The ungluing of the spacers from the new bakelite is due to surface characteristics (chemical). Two approaches: 1.Chemical/mechanical: realization of an automatic machine for the cleaning and brushing of the bakelite panels surfaces 2.Only mechanical: realization of an automatic machine that could locally mill the zone of the spacers and of the frame Solution 2 was discarded because it required > 4-5 months Solution 1 ready in 4-5 weeks

Working Plan Phase I Selection of the panels Brushing tests Roughness measurements Spacers gluing Tension tests Phase II Construction of real gaps Low pressure (5 mbar) tests Linseed oil Phase III I vs HV Cosmic test Bakelite selection (ARGO, CMS) Gluing tests Selection of Brushing Methods Roughness measurements brushing and gluing of the bakelite strips The entire panel is treated Gluing of spacers Spacers ungluing tests Phase II Gaps construction LOOP OVER IF BAD Today we are here

Does the problem belong to all the bakelite batches? How to select a bakelite panel Does the problem belong to all the bakelite batches? How to select a bakelite panel -The quality of each sheet is proven by gluing 4 to 5 spacers strips before any kind of test. -The remaining part is cut in strips on on which different surface tratments are applied. -One strip is kept for chemical analysis. - Spacers are glued to the treated strips with the gluing machine. -The quality of each sheet is proven by gluing 4 to 5 spacers strips before any kind of test. -The remaining part is cut in strips on on which different surface tratments are applied. -One strip is kept for chemical analysis. - Spacers are glued to the treated strips with the gluing machine.

4 panels have been tested from a “bad” bakelite batch 4 panels have been tested from a “bad” bakelite batch PANELS not TREATED Tension values

-20 measurem. randomly distributed over the surface with random orientation of the meter -2 “old” ATLAS & BaBar and 1 “new” CMS -no sensible variations on the average roughness -20 measurem. randomly distributed over the surface with random orientation of the meter -2 “old” ATLAS & BaBar and 1 “new” CMS -no sensible variations on the average roughness PANELS not TREATED Roughness Measurements R z = ten-point height

Hard and soft brushing at 1700 r/min. Measurements were done transversally and longitudinally wrt the brushing direction. soft hard PANELS TREATED Mechanical Brushing

Something unexpected : the two sides are different ! Side A Side B Tension test on the two sides of the same panel Tension test on the two sides of the same panel Let’s call the two (indistinguishable) sides of each panel A and B: spacers were glued on both sides of the same panels and tension tests performed. Let’s call the two (indistinguishable) sides of each panel A and B: spacers were glued on both sides of the same panels and tension tests performed.

Tension tests on ARGO panels show the same behaviour ( ARGO has higher resistivity values) Tension tests on ARGO panels show the same behaviour ( ARGO has higher resistivity values) Side A Side B

Side A Side B B A Tension tests vs Roughness measurements do not evidence correlations Tension tests vs Roughness measurements do not evidence correlations Tension values Roughness values

Ry (  m) x 100 A A B B Tension tests vs Roughness measurements: CMS bakelite In this case the trend is opposite to the expected one Tension tests vs Roughness measurements: CMS bakelite In this case the trend is opposite to the expected one Tension values Roughness values

Roughness measurements done close to the region of the spacer mark vs Roughness vs Tension Roughness meausurements done in the same direction of the feed to the L.A. No correlation Roughness meausurements done in the same direction of the feed to the L.A. No correlation Rz(  m)

Automatic brushing and cleaning machine: L.A. “Automatic Laundry” Automatic brushing and cleaning machine: L.A. “Automatic Laundry”

BEFORE AFTER L.A. machine results on side A: ARGO 1500 r/min, 1m/min L.A. machine results on side A: ARGO 1500 r/min, 1m/min Detachment Tension values BEFORE and AFTER the L.A. treatment Detachment Tension values BEFORE and AFTER the L.A. treatment

BEFORE AFTER L.A. machine results on side B: ARGO 1500 r/min, 1m/min L.A. machine results on side B: ARGO 1500 r/min, 1m/min Detachment Tension values BEFORE and AFTER the L.A. treatment Detachment Tension values BEFORE and AFTER the L.A. treatment

With the same L.A. settings (1500 r/min; speed 1m/min) used for ARGO, samples of bakelite from other experiments were treated and gas volumes assembled: -ATLAS 5 gaps -CMS 3 gaps -ARGO 4 gaps Total number of spacers 2684 The 12 gaps were tested at low pressure before the surface treatment with linseed oil to check the number of “zero kg detachments” on the spacers. (tested at 540 gr) With the same L.A. settings (1500 r/min; speed 1m/min) used for ARGO, samples of bakelite from other experiments were treated and gas volumes assembled: -ATLAS 5 gaps -CMS 3 gaps -ARGO 4 gaps Total number of spacers 2684 The 12 gaps were tested at low pressure before the surface treatment with linseed oil to check the number of “zero kg detachments” on the spacers. (tested at 540 gr) 7 (over 2648) unglued spacers 3 gaps over 12 had at least 1 unglued spacer None of the remaining spacers disjoined during the pressure test 7 (over 2648) unglued spacers 3 gaps over 12 had at least 1 unglued spacer None of the remaining spacers disjoined during the pressure test

CMS: I vs HV curves in range (i.e. 2-5  8 kV), good surfaces quality after the linseed oil treatment, good spacer strength (i.e. > 56 mbar, the maximum overpressure available). Tested also 11 (9 w new bakelite and 2 w old bakelite) gaps (RB1-like) with brushed bakelite (no oiled yet) : 7 gaps ok up to 20 mbar, 1 gap had 1 disjoined spacer at 12 mbar, 1 gap had construction problem (i.e. big slit in the frame), 1 gap bad already at 1 mbar. ARGO: average I = ( )  8 kV (wrt  A) ( )  9 kV (wrt  A) ATLAS: no leakage up to 8 mbar, average I of 6.6  10.4 kV, Average rate 2 Hz/cm 2, working point greater than 94% CMS: I vs HV curves in range (i.e. 2-5  8 kV), good surfaces quality after the linseed oil treatment, good spacer strength (i.e. > 56 mbar, the maximum overpressure available). Tested also 11 (9 w new bakelite and 2 w old bakelite) gaps (RB1-like) with brushed bakelite (no oiled yet) : 7 gaps ok up to 20 mbar, 1 gap had 1 disjoined spacer at 12 mbar, 1 gap had construction problem (i.e. big slit in the frame), 1 gap bad already at 1 mbar. ARGO: average I = ( )  8 kV (wrt  A) ( )  9 kV (wrt  A) ATLAS: no leakage up to 8 mbar, average I of 6.6  10.4 kV, Average rate 2 Hz/cm 2, working point greater than 94%

Efficiency results from ATLAS