SCIENCE OLYMPIAD Elevated Bridge Div. B - C 2008-09 CeAnn Chalker

Slides:



Advertisements
Similar presentations
Boomilever Tennessee Science Olympiad Coaches Workshop October 27, 2012 Will Schleter
Advertisements

Science Olympiad Summer Institute Phoenix, AZ July , 2013.
Science Olympiad Summer Institute Phoenix, AZ July 16 – 20,
CeAnn Chalker Boomilever B & C – CeAnn Chalker
CeAnn Chalker Towers B & C – CeAnn Chalker
Engineered Floor and Roof I-Joists
SCIENCE OLYMPIAD Egg-O-Naut – C CeAnn Chalker
SCIENCE OLYMPIAD Wright Stuff – B
CeAnn Chalker * This presentation was prepared using draft rules. There may be some changes in the final copy of the rules. The rules.
Trajeggtory. Teams of up to 2, will build in advance, a device constructed out of specified materials to protect a raw egg from breaking when tossed horizontally.
Competency: Draw Wall Sections
Bottle Rockets - B CeAnn Chalker
SCIENCE OLYMPIAD Elevated Bridge Div. B - C CeAnn Chalker
Pasta Towers. The Challenge Teams of up to 2 will design and build the lightest pasta tower with the highest structural efficiency, capable of supporting.
BATTERY BUGGY Mike Johnson. LAY PERSON’S EVENT DESCRIPTION: Teams will construct a battery-powered vehicle that: moves as fast as humanly possible, and…
Hydraulic Digger Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.
Anatomy of A Bridge Atin Sinha, Ph.D., P.E. Albany State University Anatomy of A Bridge Atin Sinha, Ph.D., P.E. Albany State University.
Robo-Cross Dennis R. Papesh
Helicopters– C Matthew Chalker & CeAnn Chalker and
SOSI 2013 CeAnn Chalker Matthew Chalker
TOWERS B/C EVENT PRESENTATION Robert Monetza
Skilled Trades 1201 Floor Framing
Virginia Science Olympiad: Bottle rocket and towers
Presented: October 24 th, 2009 A Look at: Mousetrap Vehicle Out and Back.
Manila folder bridges.
SCIENCE OLYMPIAD SUMMER INSTITUTE CEANN CHALKER DENNIS PAPESH 1 Junkyard Challenge.
Trajectory ‘08 Dennis Papesh
Spaghetti Bridges The Pasta Sensations! Take a look at some designs…….
Scissor Lift Safety Training Working Safely on Scissor Lifts 29 CFR OSHA Scaffolding Safety Requirements.
Elevated Bridge.
Organized by: Department of Civil Engineering Sponsors: 31 st May to 3 rd June 2010.
BRIDGE BUILDING.
Elevated Bridge Building New York State Coaches Clinic October th 2009 Fishkill, New York.
Virginia Science Olympiad: BUILDING EVENTS Div C.
Science Olympiad Summer Institute 1 Presented by Dennis Papesh
MESA DAY BRIDGES. MESA BRIDGES Forces at Work Forces in a Bridge Building Better Bridges Rules Testing Procedures Materials Suppliers.
Robot Contest Guidelines for 601A Sound Controlled Robot Team Event 1: Each team will be timed in navigating their robot on a horizontal surface (the floor).
Trajectory 2010 Dennis Papesh
Electric Vehicle Alex Azima Lansing Community College
Virginia Science Olympiad: BUILDING EVENTS DIV B.
PASTA TOWERS. GOAL—Build the most efficient tower.
Robo - Cross Students will design and build a robot to collect items on a playing field, move them from one zone of the playing field to another, and.
Virginia Science Olympiad: BUILDING EVENTS Div C.
SCIENCE OLYMPIAD Egg-O-Naut - C CeAnn Chalker
Trajectory New York State Coaches Clinic October th 2009 Fishkill, New York.
TENNESSEE SCIENCE OLYMPIAD 2014 Science Olympiad Coaches Workshop University of Tennessee October 12, 2013 Betsy White  Elastic Launched.
Science Olympiad 2011 Coaches Clinic Division B Justine Cromer, Instructor.
M. Nelson, 21 Mar NorthWest Louisiana Autonomous Robotics Competition (NWLA-ARC) 2 Challenges – 4 Bottle Race – Board Challenge Awards for Event.
Bridge Building Challenge Materials: 24 ft. of 3/32” balsa wood and one bottle of Elmer’s glue, scissors NO OTHER MATERIALS MAY BE USED Specifications:
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
MOUSETRAP VEHICLE OUT AND BACK Mike Johnson. LAY PERSON’S EVENT DESCRIPTION: Teams will construct a mousetrap-powered vehicle that: moves as fast as humanly.
The problem is to design, construct and test the most efficient bridge within the specifications. Back to start of slide show.
Engineering Structures
CO2 Racing AMHS Year One. Performance: Time: s Rank: 1st.
Hovercraft b & c 2017.
Scrambler 2017.
SCIENCE OLYMPIAD Mission Possible – B CeAnn Chalker
What to do… Get a lab report from me Take out a pencil
SCIENCE OLYMPIAD Mission Possible – B Patrick Chalker
Science Olympiad Summer Institute Phoenix, AZ July 16 – 20, 20112
Stick Together & Civil Structures
Roller Coaster SOSI Patrick Chalker
Elkin High School Career and Technical Education
Loading Sand (cont.) Using Sand Hopper:
Boomilever 2019 Tennessee Science Olympiad Coaches Workshop
Science Olympiad Summer Institute
. The sheathing for a floor form is secured to the beam or girder side when forming a monolithic beam or girder and floor slab systemBlock bridging is.
Simple/Compound Machines
Gravity Vehicle San Diego Regional.
Presentation transcript:

SCIENCE OLYMPIAD Elevated Bridge Div. B - C CeAnn Chalker

Elevated Bridge Students will design and build the lightest structure with the highest structural efficiency

General Parameters B & C Testing maximum load 15 kg. Only 1 structure entered per team No Impound Teams maintain a log containing data for future improvement

General Parameters B & C Cont’d Structures must be of only wood and bonded glue (any type of glue) No particle board, plywood, beaverboard, or other composite wood are allowed (this includes bamboo and paper) Unlimited laminations by students is allowed

General Parameters B & C Cont’d Entire structure must be made of wood pieces no larger that ¼ x ¼ inch in cross-section Dowels must not exceed ¼ in diameter Must accommodate a loading block that is 5.0cm x 5.0cm x 2.0cm w/a ¼ inch diameter hole in the center

Construction Parameters Bridge Span Minimum Div. B – 35.0 cm Div. C – 45.0 cm Bridge Span Maximum – 5.0 cm beyond Minimum Bridge Span Div. B – 40.0 cm Div. C – 50.0 cm

Construction Parameters cont’d Bridge may not touch the surface of the Test Base within the clear span boundary at any time Bridges may not extend below the top of the Test Base Bridges may not be braced against any edge of the Test Base for lateral support

Construction – Clearance Under Bridge Center Portion of Bridge must be raised above the level of the Test Base to the underside of the bridge to the following clearances Div. B – 10.0 cm long x 10.0 cm high Div. C – 25.0 cm long x 7.5 cm high

Testing B & C A chain and bucket will be suspended from the loading block Structures will be tested by loading sand into the bucket up to 15 kg. Students will be the only ones to handle their structures

Testing B & C cont’d Students must wear goggles Students may adjust the structure until they begin loading the sand Teams are given 10 minutes to load the sand into the bucket Structures must be marked by team so judges can identify them

Testing B & C cont’d Sand loading stops – When failure of the structure occurs When maximum load is supported (15 kg) When the chain comes in contact with the structure When the bridge or loading block touches the Test Base between the span boundary lines or the bucket touches the floor

Testing B & C cont’d Load Supported includes – Loading block Eyebolt Washer Wing nut Bucket Sand

Scoring B & C Structural Efficiency = Load Supported (grams) / Mass of the Structure (grams)

Scoring 3 Tiers B & C 1 st tier Structure meets all specifications under materials & construction will be ranked by their structural efficiency

Scoring TiersB & C 2 nd tier Structure does not meet all specifications under materials & construction but can be tested will be ranked by their structural efficiency

Scoring Tiers B & C 3 rd Tier Structure can not be tested for any reason will be ranked by the lighter mass

Scoring Tie Breakers Ties will be broken in favor of the lighter structure 2 nd tie breaker will be the lowest overall bridge height