Unit 205: Cold water systems

Slides:



Advertisements
Similar presentations
Inspect Water Distribution EO Air Gaps, Vacuum Breaker, and Back Flow Preventers TP 8 50 min.
Advertisements

ACTIVE LEARNING PROCESS
Plumbing 101 for Property Managers Presented by: [Put your name here] Welcome to... [Delete these logos and put your logos here]
HOT & COLD WATER SYSTEMS
International Mechanical Codes Scald Protection. – Where a combination potable water-heating and space-heating system requires water for space.
Welcome to Energy efficiency for gas-fired and oil-fired domestic heating and hot water systems Session A: Course introduction.
Unit 206: Domestic hot water systems
Unit 206: Domestic hot water systems
Cold feed to hot water cylinder Sink Basin Bath Drain valve Stop valve WC cistern 100 litre (minimum storage cistern)
Presentation on Taps & Valves Used in Cold Water Systems
Objective of the session.
Chapter 20 Plumbing Plans.
Understanding and Designing Plumbing Systems
Screened Warning Pipe A screened water pipe is a requirement under the water regulations. The pipe should be one size larger that the supply pipe.
Unit 206: Domestic hot water systems
Unit 208: Central heating systems
Unit 205: Cold water systems
Outcome 2 Materials used to install domestic central heating pipework Unit 208: Central heating systems.
Unit 206: Domestic hot water systems
Unit 205: Cold water systems
Unit 206: Domestic hot water systems
Harnessing Free Heat. The Energy Harness provides hot water using multiple heat sources, making the best use of low grade heat. It improves the efficiency.
Unit 206: Domestic hot water systems
Lesson One.
Presentation on Installation of a Domestic Cold Water Storage Cistern
Hydronic Mechanical Controls
Screened Warning Pipe A screened water pipe is a requirement under the water regulations. The pipe should be one size larger that the supply pipe.
Foundations of Real Estate Management BOMA International ® Module 3: Building Operations I Domestic Water ®
Unit 205: Cold water systems
Unit 208: Central heating systems
© 2009 Michigan State University licensed under CC-BY-SA, original at Water Quality.
NGfL CYMRU GCaD PLUMBING APPLIANCES & COMPONENTS.
Basic Home Plumbing.
Trade of Plumbing – Phase 2 Module 2 – Unit 9 Module 2: Domestic Hot and Cold Water Services Unit 9 – Valves and Taps Duration – 11 Hours.
Use & Re-use Water is used in a conventional way such as bathing or washing dishes, except for the toilet. The water is used and cleaned a second time.
Presentation on Feed and Expansion Cistern. Central Heating At the end of this part you should be able to: Identify general system methods of feed and.
Outcome 1 (part 2) Types of domestic central heating systems installed in domestic dwellings Unit 208: Central heating systems.
CORK GLASS LTD. Introduction Cork Glass have 8 machines that use either fresh or recycled water as a coolant as part of the production process. This created.
Backflow Prevention for Fire Sprinkler Systems State of Illinois Plumbing Code.
Bellwork Fill out your KWL sheet about plumbing Fill out your KWL sheet about plumbing What do you K now about plumbing? What do you K now about plumbing?
Outcome 3 Pressure, force and flow of water Unit 203: Scientific principles for domestic, industrial and commercial plumbing.
Saving Water The water industry in England and Wales loses 3.36 billion litres of water a day in leaks.* This waste is on top of leaks within domestic.
Water Recycling. Why? Do you think water should be recycled? Why? How do you think water is recycled?
Water Distribution Systems Pressures Locating Reservoirs Location in Ground.
Cold Water Understand and apply domestic cold water system installation and maintenance techniques.
How do we harvest rainwater and why should we.. Why Harvest Rainwater? Decrease the volume of potable water used for irrigation. Recharge the groundwater.
HOT WATER Understand and apply domestic hot water system installation and maintenance techniques.
Unit 209: Drainage systems
Unit 209: Drainage systems
Unit 209: Drainage systems
Plumbing Valves.
National Diploma Mechanical and Electrical Services Construction Cold Water Supplies.
Rainwater harvesting and greywater re-use
Rainwater harvesting.
Plumbing system fundamental and design course
WATER DEMAND (Chapter 24)
Outcome 1 (part 1) Types of domestic central heating systems installed in domestic dwellings Unit 208: Central heating systems.
Electrical Gas Plumbing Heating & Cooling
PLUMBING APPLIANCES & COMPONENTS
Hot water Systems Heaters.
5508BESG Services and Utilities Lecture 1
5508BESG Services and Utilities Lecture 2
Cold water supply and Treatment
Hot Water Systems Cylinders and Systems.
Cisterns and Insulation
Common Requirements Taps and Valves.
Domestic Hot and Cold Water Service
Boiler Safety Valve Regulations
Presentation transcript:

Unit 205: Cold water systems Outcome 2 Requirements of the cold water supplies into domestic dwellings

Requirements Incoming mains Mains Ferrule/isolation Meter/isolation Communication pipe 750-1,350mm deep 15mm (min) Stop valve DOV Service pipe 25mm MDPE (min) Ducted Rising main 15mm (min) Stop valve DOV

Requirements Water meters Internal and external meters Internal meter needs to be cross bonded for safety A boundary meter box

Requirements MDPE pipe is blue to identify wholesome water Minimum size to modern property is 25mm Soft copper can be used (R220) Meter is commonly installed at the property boundary in a chamber (protection, frost, reading) Some meters are internal and installed to rising main Water can be isolated in the road, at the meter, or at the point of entry to the property Everything from the external stop valve at the meter is regulated under the Water Regulations 1999.

Requirements The Water Regulations state: As far as reasonably practicable, a stop valve should be located inside the building, above floor level, as near as possible to the point of entry. It should be installed so, when closed, will prevent water going to any point in the building. Water undertakers recommend no more than 150mm of MDPE is above floor level (it degrades in sunlight). Either a screwdown (BS1010) or a level arm (BS6675) stop valve can be used.

Requirements The stop valve works by the handle being turned. This in turn screws down a jumper with a washer attached. This washer is pushed against a seating to create a watertight seal. If the valve jams, a cost effective method of repair is to replace the head gear only. The DOV works using a spanner or key on the square drive. This in turn screws down a jumper and washer onto a seating, to create the watertight seal. A DOV must be installed above the incoming stop valve and at every low point in the system.

Requirements Plumbing system must comply with the Water Regulations Every plumber must prevent contamination of wholesome water Advance notice must be given of installations Benefit from becoming an Approved Plumbing Contractor, after passing the Water Regulations training course WRAS has produced the guide to the Water Regulations, which is the essential guide for plumbers

Requirements Two key tests with cold water systems: Pressure Flow rate Pressure is normally first tested near to the point of entry Flow rate is tested at each outlet

Requirements Pressure Pressure refers to the force behind water flow. Normally, in domestic situations, a visual check is suffice but when installing certain appliances, a more accurate reading needs to be taken – water softeners, combination boilers, un-vented cylinders, or if pipework is being altered dramatically. Pressure in plumbing systems can be created by two basic means: either a pump can be fitted (mains water is also pumped water), or pressure can be created by the weight of water – the head.

Requirements Flow rate This is the volume of water discharging to an appliance, and is measured in litres per minute. So, if the flow rate was poor, the bath would take longer to fill up. Normally, in a domestic situation, a visual check would suffice but you can always check by using a flow cup or weir cup (this would be critical when setting up a combination boiler or monitoring an unvented cylinder). 60 litres/min = 1l/sec 6 litres/min = 0.1l/sec

Requirements Pressure and flow These can be effected by: Daily demand (peak periods) Location Age of property Distribution main size Incoming main size Installation pipe size Materials used Number of elbows etc Blockages

Requirements Direct system This is a cold water system where all the cold water in the property is supplied directly to each outlet on mains pressure – high pressure. The size of service pipe to the house is usually 25mm MDPE, which is connected to 15mm copper in the house. Old houses may have 20mm MDPE copper or lead mains. On a direct system, it is important to take precautions against backflow.

Requirements Direct system This is a cold water system where all the cold water in the property is supplied directly on top of each outlet on mains pressure – high pressure.

Direct system The only stored water is for the hot water system via the cylinder. Only one DOV is required to drain the system down. All pipework can be 15mm due to the system being high pressure.

Requirements Direct system Another direct system is when a combination boiler is used, and both hot and cold are directly off mains. In this case, there is not stored water at all. An unvented or water jacket heater hot water system would be the same.

Requirements Direct system Advantages: Potable water at every draw off point Good pressure at all draw off points No concerns about storage cisterns in lofts Disadvantages: If the mains is turned off you are without water Pressure varies during the day and at peak times pressure can be very low (6.30–8.30am and 5–7pm) Care when fitting showers/mixer taps

Requirements Indirect system This is a cold water system in which the cold water is taken via the rising main to a high-level storage cistern. From there, most of the cold water outlets are fed – low pressure – except the kitchen sink, which is mains-fed to supply wholesome water. The distribution pipe from the storage cistern needs to be either 22mm or 28mm, and reduces in size as appliances are fed.

Requirements Indirect system A low pressure system feeding most outlets in the property.

Requirements Indirect system Advantages: Stored supply of hot water, should mains be turned off The system pressure is unaffected by peak time demand (constant pressure) Disadvantages: More pipework in roof space – risk of freezing Possible contamination of water at draw-off points – storage cistern Only one draw-off point gives potable water More expensive

Requirements Cold water storage If a cold water storage cistern is required, both BS6700 and the Water Regulations outline: If supplying either hot or cold – 100-150lts If supplying both hot and cold – 230-250lts By inspecting the loft to see the CWSC, or by testing the outlets, the system can be identified. City and Guilds 6035 Level 2 Unit 205

Requirements Rainwater harvesting This can save a householder large volumes of mains water and reduce the pressure on this resource. These storage cisterns are installed below ground and collect water from gullies. The average size may be 5,000 litres.

Requirements Grey water recycling This system collects waste water from baths, showers and washing machines. It is commonly used to flush WCs.

Requirements With both rainwater and grey water, it is important to prevent contamination of wholesome water These systems must be independent Pipework must be identified properly These systems are easier to install on new builds rather than retro-fit These also help with the increasing green demands of society

Requirements To identify which system is installed in a property the plumber could: Take a pressure reading at various outlets Go up in the loft and identify the cistern sizes Turn off the incoming mains and identify the outlets that stop flowing An important factor is, whichever system is installed, the outlet has sufficient pressure and flow for the appliance.