The York County School Division Geothermal Heating and Air Conditioning: Is it Worth the Cost?

Slides:



Advertisements
Similar presentations
Sustainable School Design Creating Healthy, High Performance School Facilities Presented by Stephen M. Koontz, Energy Services Leader, Tampa Bay Trane.
Advertisements

Using Ground Source Heat Pump The Avenue Centre.
Chapter 3. HVAC Delivery Systems
Improve Facility Operation through Commissioning-A Case Study Mingsheng Liu, Ph.D., P. E. University of Nebraska.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Tom Johanson – DNV KEMA Senior Engineer Building Automation Systems.
New York Life Building 20 West Ninth Street Mike Thome Hoss & Brown.
Environmental Controls I/IG Lecture 14 Mechanical System Space Requirements Mechanical System Exchange Loops HVAC Systems Lecture 14 Mechanical System.
Sustainability Advocates Program New Advocates Training April 7, 2009 ENERGY AT NYU.
100% Outside Air and Dehumidification Management
Controlling Sutardja Dai Hall Andrew Krioukov Stephen Dawson-Haggerty, Jay Taneja David Culler.
Pentagon Washington, D.C. UMCS contract for modernization of the Pentagon Scope includes: Design, engineering and commissioning of the Building Operations.
Components of HVAC System
REFERENDUM 2014 Building Maintenance. Referendum 2014 Focused on providing a safe and healthy learning environment for students Fiscally responsible:
Jamesway Incubator Company Inc. HRS System By Dominic Babineau, Engineer.
ENERGY CONSUMPTION: MANZANITA HALL ENERGY UPGRADES BEN COHNDANNY GARNETT AUSTIN FROGGEPAUL SAIGEON MATT DUNCAN.
Variable Frequency Drives VFD Basics
Worcester Polytechnic Institute Gordon Library and Fuller Laboratory B.N. Tripathi Senior Vice President CES/Way.
ENERGY EFFICIENCY FOR END-USERS.  CSU Chancellors office coordinates the efforts to accomplish the goals established by Assembly Bill 32 for green house.
Franklin County Technical School Performance Contract Project.
ENERGY STAR ®. Earning the ENERGY STAR ® means a product meets strict energy efficiency guidelines set by the US Environmental Protection Agency and the.
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Reducing energy waste Good for us, great for the environment.
Bowie State University Fine and Performing Arts Center Zachary Lippert Faculty Advisor: Dr. Stephen Treado.
Charles F. Hurley Building Case Study B.J. Mohammadipour Bureau of State Office Buildings.
Earth’s Changing Environment Lecture 22 Energy Conservation in Heating and Cooling.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Massachusetts High-Performance Green Schools – Case Study Whitman-Hanson Regional High School Library & Media Center. This projects features include utilizing.
STAFFORD COUNTY PUBLIC SCHOOLS ENERGY MANAGEMENT PROGRAM 2009 UPDATE Bob Randall CEM,,BEP, CBCP Energy Manager Energy Manager.
Energy Trends. 2 Trift bridge 560’ long 333’ high.
Green Building Demonstration Project Adam Saling City of San Diego.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Geothermal Heating & Cooling Digging Deeper for Energy Savings Luann T. Kolstad Business Manager Prospect Heights School District 23.
Best Practices in Overall Sustainable Design Cal State University, Long Beach - Liberal Arts 2, 3 and 4 Renovation Presented By:Mark Zakhour,, CASp, LEED.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
Community Resource Committee Report to City Council January 15, 2015.
Name of Building(s) or Project Speaker(s) Organization(s)
Facility Improvement Program Town of Shirley June 17, 2013 Robert Reddish ABM Building Solutions.
Ray & Joan Kroc Corps Community Center Mathias Kehoe | Mechanical Option April 09, 2012.
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
Geothermal Heat Pump Systems Advantages of Geothermal
The lawrence berkeley national laboratory: a case study Revised 12/2/04.
1 Limestone County School District Energy Update Year Eleven Report September 2008 – August 2009.
Whitman-Hanson Regional High School Energy Efficient Systems: HVAC All fans and pumps are VFD controlled with fully reactive controls Condensing gas-fired.
Kendal Energy Policy Plan Community strives to: Carbon footprint reduction Promote the use of renewable resources Pursue other measures that can enhance.
University of Maryland’s Gossett Field House College Park, MD Jason Borowski Architectural Engineering Mechanical Option Pennsylvania State University.
HEATING AND COOLING SYSTEMS
Kendal Energy Policy Plan Community strives to: Carbon footprint reduction Promote the use of renewable resources Pursue other measures that can enhance.
Greenbriar East Elementary School Fairfax, Virginia Michelle L. Siano Mechanical Option Spring 2005 Senior Thesis.
GRES Education. The goals of the GRES Education program are to: help school districts reduce energy use, conserve water, and minimize waste production.
IMPROVING THE EFFICIENCY GEOTHERMAL or GROUND SOURCE HEAT PUMPS.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
INTERCONTINENTAL HOTELS GROUP Energy Star Audit.
Lack of dedicated building meter – Solution: Estimate square footage of Herberger in relation to total area serviced by meter – Estimate 12% of total.
Energy Conservation Building Upgrades Alma School District.
Copyright © 2015 Optimum Energy LLC. All Rights Reserved. Proprietary & Confidential Incorporating Energy Conservation Strategies into University Research.
7/15/2002PP.AFD.09 1 of 43 Yaskawa Electric America Variable Frequency Drives In HVAC Applications.
NOLAN JAMES AMOS Dr. William Bahnfleth, Faculty Consultant architectural engineering senior thesis mechanical option PHOENIXVILLE EARLY LEARNING CENTER.
Welcome ECC April 19, 2007 Harrington Elementary School.
The Energy Efficiency and Solar Nexus:
HEAT RECOVERY VENTILATION MAKING MONEY WITH SMALL COMMERCIAL RETROFITS
January 12, 2017.
Sean Weber Energy Engineer
Frisco ISD Geothermal Buildings
Grunenwald Science and Technology Building
Abbas Shirian, PE Certified GeoExchange Designer
Exploring Energy Management
Wayne State University Facilities Planning & Management
Presentation transcript:

The York County School Division Geothermal Heating and Air Conditioning: Is it Worth the Cost?

York County Schools: The Quest for Energy Efficiency –1997 Performance contract - replaced T-12 lighting in ten schools and installed DDC building automation systems in seven –2000 Installed the first geothermal system –2005 Energy Star Partner 10-point Reduction Award for decreasing energy consumption –2006 Energy Star Leader and 20-point Reduction Award for decreasing energy consumption –2007 Received first Energy Star Awards for four schools – all which were geothermal –2009 Received Energy Star Leader Top Performer Award –2009 Received Energy Star Awards for ten schools – six are geothermal –2010 Installed the ninth geothermal system in the York River Academy/Boys & Girls Club wing at York Middle School - nearly half of our schools are geothermal –2011 Retrofitting geothermal into Dare Elementary School – system #10

Proof Not Just Theory: Case Studies of Four Existing Geothermal Buildings 1. Seaford Elementary School 2. Queen’s Lake Middle School 3. York Middle School 4. Bruton High School

Case Study # 1: Seaford Elementary School Earned an Energy Star rating for four consecutive years.

Seaford Elementary School A Certified Energy Star Building

Energy Features before Geothermal Retrofit –F32T8 Fluorescent lighting –DDC Building Automation System –Air to air heat pumps –Fresh delivered through the heat pumps- fresh air delivery was ineffective

Energy Features after Retrofit –F32T8 Fluorescent lighting –Occupancy sensors –Geothermal heat pumps –DDC Building Automation System –Adjustable room temperature setpoints & overrides –Permanent humidity monitoring –Fresh air supplied to classrooms through dedicated makeup air systems –Increased amount of fresh air delivered to classrooms –Air-conditioned kitchen and hallways –Added a 10,501 sqft air-conditioned gymnasium

Seaford Elementary – Electrical Consumption (kWh) by Fiscal Year Consumption (kWh) by Fiscal Year

Seaford Elementary – Natural Gas Consumption (CCF) by Fiscal Year Consumption (CCF) by Fiscal Year Current Energy Intensity: 36.5 kBtu/sf/yr

Seaford Elementary School

Geothermal Well Fields –Not ordinary wells –A series of bore holes –Do not use ground water –Closed loop system –Factory welded long U tubes –50 year warranty –NO moving parts –NO maintenance

Case Study # 2: Queens Lake Middle School The first middle school in Virginia to earn an Energy Star rating. It has earned an Energy Star rating for four consecutive years.

Queens Lake Middle School A Certified Energy Star Building

Energy Features before Renovation –F32T8 Fluorescent lighting –DDC Building Automation System –Air to air heat pumps –Fresh delivered through the heat pumps-found broken and seized dampers –Gymnasium, locker rooms and kitchen were not air-conditioned

Energy Features after Renovation –F32T8 Fluorescent lighting –Occupancy sensors –Geothermal heat pumps –VFD equipped circulating pumps –DDC Building Automation System –Adjustable room temperature setpoints & overrides –Permanent CO2 and humidity monitoring –Air-conditioned gym, locker rooms, kitchen and hallways –Fresh air supplied through heat wheel style units –Increased amount of fresh air delivered to classrooms –Square footage increased from 47,767sqft to 56,075 sqft

Queens Lake Middle – Electrical Consumption (kWh) by Fiscal Year Consumption (kWh) by Fiscal Year

Queens Lake Middle - Natural Gas Consumption (CCF) by Fiscal Year Current Energy Intensity: 32.9 kBtu/sf/yr

Queens Lake Middle School

The Real Savings of ? The Real Savings of Geothermal? √Reduces utility bills √Eliminates equipment √Decreases space requirements √Reduces electrical service size √Simplifies building automation √Simplifies HVAC equipment √Reduces HVAC maintenance √Decreases hydrocarbon fuel consumption √Reduces water consumption

Case Study # 3: York Middle School An Energy Star Certified Building

York Middle School An Energy Star Certified Building

Energy Features before Renovation –F34T12 fluorescent lighting –Pneumatically controlled unit ventilators –Fresh air was delivered through the unit ventilators - fresh air delivery effectiveness was questionable –Pilot DDC Building Automation System –Natural gas fired boilers –Gym, locker rooms and kitchen were not air-conditioned

Energy Features after Renovation –F32T8 Fluorescent lighting –Occupancy sensors –Geothermal heat pumps –VFD equipped circulating pumps –DDC Building Automation System –Adjustable room temperature setpoints & overrides –Permanent CO2 and humidity monitoring –Air-conditioned auditorium, gymnasium, locker rooms, kitchen and hallways –Fresh air supplied through heat wheel style units –Increased amount of fresh air delivered to classrooms –Added 24,500 sqft classroom space and media center

York Middle School – Electrical Consumption (kWh) by Fiscal Year

York Middle - Natural Gas Consumption (CCF) by Fiscal Year Current Energy Intensity: 27.1 Btu/sf/yr

York Middle School

Systems compromised √Capacity of ground loop must exceed capacity of heat pumps √Sand and water don’t mix √Building usage changes

Case Study # 4: Bruton High School The first high school in Virginia to earn an Energy Star rating. It has earned the Energy Star rating for four consecutive years.

Bruton High School A Certified Energy Star Building

Energy Features before Renovation –F34T12 fluorescent lighting –Pilot DDC Building Automation System –Packaged all electric rooftop multi-zone units –Fresh air delivered through the multi-zone units- fresh air delivery was ineffective –Gym, locker rooms and kitchen were not air- conditioned

Energy Features after Renovation –F32T8 Fluorescent lighting –Occupancy sensors –Geothermal heat pumps –VFD equipped circulating pumps –DDC Building Automation System –Adjustable room temperature setpoints & overrides –Permanent CO2 and humidity monitoring –Air-conditioned gym, locker rooms and kitchen –Fresh air supplied through heat wheel style units –Increased amount of fresh air delivered to classrooms –Added a 2,870 sqft air-conditioned practice gymnasium

Bruton High School – Electrical Consumption (kWh) by Fiscal Year Current Energy Intensity: 29.2 kBtu/sf/yr

Bruton High School

Comparison of a Geothermal Installation versus a Traditional HVAC System Bruton High School – (152,656 sq ft) total yearly cost includes electricity and propane gas Tabb High School – (157,307 sq ft) total yearly cost includes electricity and natural gas

A Side by Side Comparison… Which would you rather maintain?

Lessons Learned √Educate staff √K.I.S.S. √Remove glycol √Vault or no vault √Mark it! √Insulate like you mean it √Dedicated make-up air system √Cooling load beats heat load √Drastically reduces maintenance costs √Continuous commissioning

Mark Tschirhart Supervisor of Resource and Security Control green.yorkcountyschools.org