….Repair Indefinitely 1 A New Class of Retrofits:… ACEEE 2010 Summer Study Examples of Candidate Measures for “Existing Baseline” Douglas Mahone Cal Technical.

Slides:



Advertisements
Similar presentations
SEATTLE ENERGY CODE ENFORCEMENT PROCEDURES: PLAN REVIEW AND INSPECTION John Hogan, A.I.A., P.E. Seattle Department of Planning and Development 700 Fifth.
Advertisements

1 Energy Efficiency and Iowa Utilities Presentation to the Energy Policy Advisory Forum, convened by Governor-Elect Chet Culver January 4, 2007 Presented.
It can be as easy as patching a hose. TEAM UP! FOR COMPRESSED AIR SAVINGS.
A Comparison of Measure Avoided Cost Calculations using Utility TOU Load Shapes and DEER Hourly Measure Savings 14 March 2006.
Save Energy and Money PNM Energy Efficiency Programs
Overview of Collected Integrated Chiller Retrofit Case Studies Dr. Lisa Gartland (510) ,
Fall 2009 Workshop Level 1 Energy Audits - Energy Use Analysis - - Walk Through Analysis - Mr. Matt O’Brien, AIA, LEED AP November 17, 2009.
AIR QUALITY SERIES S MART E NERGY U SE FOR A H EALTHIER B USINESS C LIMATE AND C LEAN A IR Utility Energy Efficiency and Conservation Programs: Present.
PNM Energy Efficiency Business Rebates for Facility Managers Retrofit Rebate Opportunities July 13, 2010.
Commercial Energy Efficiency Program GAPPA May 27, 2014.
Commercial Energy Efficiency Program IFMA Luncheon July 16, 2014.
Statewide Measure Cost Update Overview & Discussion.
ENERGY MANAGEMENT & EFFICIENCY JOSÉ D. NUÑEZ, LEED AP VICE CHANCELLOR FACILITIES PLANNING, MAINTENANCE & OPERATIONS "Facilities Excellence" 1 “This Way.
RENEWABLE ENERGY LEADERSHIP SUMMIT 2005 AN OVERVIEW OF UTILITY EFFICIENCY PROGRAMS.
State Incentives for Energy Efficiency Commercial and Industrial New Jersey Board of Public Utilities Office of Clean Energy Mona L. Mosser Bureau of Energy.
Energy Assessment Spreadsheet Ashok Kumar Somik Ghose Rahul Pendse Charanya Varadarajan.
Industrial Pump Motor VFDs: Provisional Standard Protocol Christian Douglass Regional Technical Forum 5/12/2015.
CNN Center John Hester Turner Properties, Inc.. CNN Center Built in ,583,000 square feet on 18 floors Five structures joined by a common atrium.
1 Connecticut’s New Energy Code Connecticut ASHRAE Tech Session October 13, 2011 Frederick F. Wajcs, Jr. Senior Energy Engineer Connecticut Light and Power.
Auraria Higher Education Center Case Study John Ismert & Frank Ellis Auraria Higher Education Center Facilities Management.
Brought to you by: Connecticut Energy Code Frederick F. Wajcs Senior Energy Engineer Northeast Utilities February 10, 2011.
Using Energy Efficiency to Increase Your Bottom Line
Green Building Demonstration Project Adam Saling City of San Diego.
Lawrence Livermore National Laboratory Building 111 Mike Holda Lawrence Berkeley National Laboratory (510) or (209) ,
1 PredictiveOnLine PREDICTIVE SYSTEMS ENGINEERING Vintec Knowledge Ltd.
Lisa F. | May 20, 2014 Introduction to Lighting Incentives & Process for Medium/Large Customers.
Landscape for Deemed Lighting Workpapers Building Code and Voluntary Program Relationship Building Code Changes Driven by Big Vision Voluntary Program.
Foothill College & Space Science Center Bill Kelly Viron Energy Services (510) ext 13,
Commercial Forecast Adjustment Draft June 19, 2002.
Efficiency Vermont your resource for energy savings The Economic Benefits of Energy Efficiency.
Grocery Measure: EC Motors for Display Cases Regional Technical Forum June 16 th, 2015 Mohit Singh-Chhabra.
Phoenix Convention Center Phoenix, Arizona Lessons Learned from ARRA Projects Solution ShowcaseLessions Learned from ARRA Projects Walter Tersch, LEED.
Name of Building(s) or Project Speaker(s) Organization(s)
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
Vanderbilt Energy: 15,000 20,000 25,000 30,000 35,000 40,000 45,000 18,708,842 Kilowatt Hours.
Energy Conservation Initiatives Joan Kowal Energy Manager, UMCP May 1, 2008.
ALEJANDRA MEJIA SEPTEMBER, 2015 Savings To Code Discussion: Repair Indefinitely Rule Sets.
The lawrence berkeley national laboratory: a case study Revised 12/2/04.
Week 12 Overview of equipment and building envelope as part of the energy audit.
Strategies for moving away from subsidies for basic CFLs Presentation to the CPUC Energy Division June 16, 2009 Reuben Deumling Associate, Energy Economics.
ALEJANDRA MEJIA OCTOBER 22, 2015 Savings to Code Subcommittee: Update and Preview of Expected Deliverable.
Air Conditioner Efficiency. Air Conditioner Problem Suppose an older home in San Antonio is equipped with a central air-conditioning unit with SEER rating.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
01/15/16Prop 39 Update - Maintenance & Operations - Sustainability Initiatives Unit1 CALIFORNIA CLEAN ENERGY JOBS ACT LAUSD PROPOSITION 39 ENERGY EFFICIENCY.
Contribution of Federal Standards Toward 6 th Plan Efficiency Goals Conservation Resources Advisory Committee Meeting June 4,
Computer System Support   The costs of installing, operating and maintaining computer systems are called total costs o ownership or TCO  TCO includes.
Overview for Local Energy Committees February 10, 2016.
….Repair Indefinitely 1 A New Class of Retrofits:… ACEEE 2010 Summer Study A Brief History of EULs in California Douglas Mahone Cal Technical Forum March.
Northwest Power and Conservation Council Perspective Program for Commercial New Construction CNC Small Office RTF July 2007.
Hawaiienergy.com Graceson Ghen. hawaiienergy.com  Hawaii’s energy conservation and efficiency program  Administered by Leidos Engineering, LLC under.
Energy Conservation Building Upgrades Alma School District.
Absolute Energy Savings LLC First and foremost a service company Types of customers Customized energy savings programs Quick payback projects to detailed.
November 2, 2011 Comprehensive Lighting: Solutions for the Greater Good David Landers Manager, Business Energy Management Efficiency Connections Northwest.
Draft SMECO EmPOWER Plans April 15, 2011.
Hawaiienergy.com Walter Enomoto Energy Efficiency Advisor Maui County.
Changes for 2016 Moving Forward! 2016 ECM Fan Box Bright Energy Solutions! LED High Bay! Chillers! Ready for 2016.
Existing Condition Baseline Programs & Codes and Standards
SCE “To-Code” Pilot Lessons Learned
Technical Advisory Group Meeting on BGE’s Conservation Program
Why We Arrived With Windows Upgrade Support ?
pplelectric.com/businessrebates
Twenty Questions ? ? This set of questions and answers has been prepared by GE to present the current understanding (May 2006) of provisions contained.
LED Lighting VS TRADITIONAL LIGHTING
2018 Retro-Commissioning (RCx) Program
Demand Side Management Potential Study Measure List Overview
Regional Sales Manager
Regional Sales Manager
Regional Sales Manager
Regional Sales Manager
Presentation transcript:

….Repair Indefinitely 1 A New Class of Retrofits:… ACEEE 2010 Summer Study Examples of Candidate Measures for “Existing Baseline” Douglas Mahone Cal Technical Forum March 19, 2015

….Repair Indefinitely 2 A New Class of Retrofits:… ACEEE 2010 Summer Study Current Baselines Associated with Failure Scenarios Retrofit: Replace upon burnout. –Equipment replaced on failure, triggering code required eff –Savings evaluated relative to the code baseline. Early replacement. –If the program induces an upgrade of equipment that would have remained in place because it still had some useful life left, –Savings relative to the actual estimated efficiency of the older equipment being replaced, for the remainder of its useful life. Retrofit: Replacement beyond useful life. –Equipment operating beyond its deemed useful life, is deemed close to failure and treated like the replacement upon failure –Savings evaluated relative to the code baseline

….Repair Indefinitely 3 A New Class of Retrofits:… ACEEE 2010 Summer Study Examples of Problemmatic Measures Commercial Lighting Fixtures –Old fixtures can be kept in service Replace lamps & ballasts as needed –Change out with new, efficient fixtures If >10% of fixtures, code requirements triggered: –Must meet reduced LPD (lighting power density) as if new –Must install controls – automatic shutoff, daylighting, occupancy –Exception: if LPD 85% of code requirement, no controls required –Problem: still just meeting code –Programs can only pay for beyond code

….Repair Indefinitely 4 A New Class of Retrofits:… ACEEE 2010 Summer Study Currently Best Example IOU program filings for lighting alterations: –Savings estimates reduced from 379 GWh/yr ( ) to 189 GWh/yr ( ) CEC proposing to relax lighting alteration code requirements –Pushback from industry –Fewer lighting controls, relaxed threshold

….Repair Indefinitely 5 A New Class of Retrofits:… ACEEE 2010 Summer Study Examples of Problemmatic Measures Constant volume air handler –Old air handler can be kept in service Replace bearings, motors, controls as needed –Change out with new, efficient VAV air handler Code requires new air handlers to be VAV –Problem: still just meeting code –Programs can only pay for beyond code

….Repair Indefinitely 6 A New Class of Retrofits:… ACEEE 2010 Summer Study A New Class of Retrofits: Repair Indefinitely Measures Three Criteria 1.Failure mode is not catastrophic - kept in service indefinitely through repairs and part replacements; 2.History of rebuild/repair rather than replace; and 3.Far cheaper to rebuild/repair than to replace Other Examples Large electric motors – often rewound Large pumps and fans - difficult to replace Chillers - often rebuilt and repaired Windows – can last the life of the building

….Repair Indefinitely 7 A New Class of Retrofits:… ACEEE 2010 Summer Study Need to Demonstrate Problem to CPUC Need more than anecdotes Why each measure is a lost opportunity Why customers are not “cheating” on code What costs to get to code are, what costs to go beyond code are How prevalent? Magnitude of lost savings statewide Can you provide more examples? Help answer these questions?

….Repair Indefinitely 8 A New Class of Retrofits:… ACEEE 2010 Summer Study Please send to: Douglas Mahone (cell)