3-D visualization streamlines flow- accelerated corrosion and other nuclear plant inspection programs Costantino Lanza, CEO INOVx Solutions, Inc.

Slides:



Advertisements
Similar presentations
Consultants in Maintenance Management and Maintenance Planning
Advertisements

SPEARHEAD LASER SCANNING. SUNCOR FERRIER BATTERY #1 Complete laser scan plus the new tanks and piping added into the scan.
MAINTENANCE MANAGEMENT Module 9
Software Engineering CSE470: Process 15 Software Engineering Phases Definition: What? Development: How? Maintenance: Managing change Umbrella Activities:
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
Using GIS for Utility Mapping and Asset Management Sanitary Sewer, Storm Sewer, and Water Distribution City of Mason City Jessy Willadsen - Mason City.
WHY USE A FLUID SEALING SPECIALIST? FOR SAFETY & RELIABILITY BECAUSE…….
Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,
AFISS Prospectus of Services AFISS offers HACCP food safety and food quality systems development and management services including preparation for regulatory.
Design Intelligent P&ID's 3d Modeling Walkthrough & Visualization
Introduction to the State-Level Mitigation 20/20 TM Software for Management of State-Level Hazard Mitigation Planning and Programming A software program.
PowerCare Customer Support Agreement LP Products and Systems 2013 PM.
MSE507 Lean Manufacturing
INDUSTRIAL & SYSTEMS ENGINEERING
Copyright © 2007 Advantica Inc. (USA Only) and Advantica Ltd. (Outside USA). All rights reserved by the respective owner. Benefits of an Integrated Compliance.
Computers: Tools for an Information Age
Developing a Chemical Risk Management Program
Introduction to Systems Analysis and Design
“The Fundamentals of Process Troubleshooting” Developing Effective Troubleshooters Simulation Solutions, Inc. “The real plant is no place for practice.”
Risk-Based Inspection Program Best Practice – Executive Summary
Objective : To understand the fabrication, design, installation welding, inspection and testing for new construction in oil and gas industry After followed.
ACT 96 - Indoor Environmental Quality In conjunction with the requirements directed under WI Statute and Administrative Code, school building officials.
“How Industry Learns” --- Proposed Project --- Karen Paulk, ConocoPhillips, Chair, Process Safety Group & Ron Chittim, API CRE Chairs & Sponsors Workshop.
Tango Asset Management Capabilities Presentation 1.Desktop & Web Architecture 2.Equipment Management 3.Condition Management 4.Data Mining 5.Parameter Trending.
Copyright © 2003 by Prentice Hall Computers: Tools for an Information Age Chapter 14 Systems Analysis and Design: The Big Picture.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
Dailies, Weeklies, Monthlies, PSM Maintenance - Simplify IT If you’d like to reach SCS Engineers, Tracer Environmental Division please contact us at:
Solution Overview for NIPDEC- CDAP July 15, 2005.
Process Safety Management
Server Virtualization: Navy Network Operations Centers
Certificate in Pipeline Construction, Welding & Inspection LECA LEXTON ENERGY CORPORATE ACADEMY Copyright 2013 Lexton Energy Incorporated PCWI delivered.
1 Valero Benicia’s Mechanical Integrity Program Karen Muehlbauer Mechanical Reliability Manager Thursday, March 27, 2014.
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
Dillon: CSE470: SE, Process1 Software Engineering Phases l Definition: What? l Development: How? l Maintenance: Managing change l Umbrella Activities:
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Distributed Virtual Laboratory for Smart Sensor System Design Distributed Virtual Laboratory for Smart Sensor System Design Oleksandr Palagin, Volodymyr.
Security Professional Services. Security Assessments Vulnerability Assessment IT Security Assessment Firewall Migration Custom Professional Security Services.
Frankfurt (Germany), 6-9 June 2011 EL-HADIDY – EG – S5 – 0690 Mohamed EL-HADIDY Dalal HELMI Egyptian Electricity Transmission Company Egypt EXAMPLES OF.
11 Mobile GIS Technology >GTI’s technology for tracking and traceability with ASTM F2897: ─Tablet computer with mobile GIS data collection software ─High.
UNIT II RCM PROCESS Module 2 PLANNING AND PREPARATION " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
Glen Fields - Final Project Presentation. What Sets CSI Apart... GBA 573 Consultants Company Background Located in San Diego, CA 5 Engineering Consultants.
Bechtel National Inc. 1 Using Human Performance Analysis to Eliminate Errors Presented September 13, 2006 DOE Integrated Safety Management Best Practices.
MICHAEL BAKER Jr., Inc. Stress Corrosion Cracking SCC Workshop December 2, 2003 Engineering & Energy.
IAEA International Atomic Energy Agency AGEING MANAGEMENT ASSESSMENT Module 9 Session 9 Resource document: AMAT Guidelines, Reference document for Ageing.
Session 12 Information management and security. 1 Contents Part 1: Introduction Part 2: Legal and regulatory responsibilities Part 3: Our Procedures Part.
OCTAVE By Matt White. OCTAVE  OCTAVE® (Operationally Critical Threat, Asset, and Vulnerability Evaluation) is a risk-based strategic assessment and planning.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
Proven systems for managing asset integrity & reliability by implementing effective Ex maintenance and inspection strategies Streamlining the ATEX inspection.
Process Safety Management Soft Skills Programme Nexus Alliance Ltd.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
PIPELINES VIJAY VADER. PROCESS PLANTS  Essentially handling liquid/gases/solids  Need to transport them from one stage to another.  Transportation.
1 Identification & Elimination of High Potentials Lessons Learned - Discussion.
Virtual Track Surveying Paul Furniss. An introduction to Omnicom Engineering A few words from Gary Sanford the UK Sponsor What is the OmniSurveyor3D System?
Compliance Remediation
Internal Control Principles
An oil company in Canada
Presented by Jon Pastuszynski, Lead M&D Engineer
Fundamentals of PROCESS PLANT PIPING DESIGN
Traceability of Gas Pipeline Materials Research & Materials Manager
PREVENTIVE MAINTENANCE By: Mary Solomon Inyang. DEFINITIONS Preventive maintenance refers to regular, routine maintenance to help keep equipment up and.
HSE Case: Risk Based Approach.
Smarter Analytics An oil and gas producer in Canada improves safety and reliability with insights into equipment failure and preventive maintenance USD478,000.
Intelligent Predictive Maintenance Solution based on Interactive Virtual Reality and Industrial Internet of Things Coherence (INPREMAS)
JOINED AT THE HIP: DEVSECOPS AND CLOUD-BASED ASSETS
Managed Content Services
Distributed Virtual Laboratory for Smart Sensor System Design
Better with Augmented Reality
Capitalize on Your Business’s Technology
Presentation transcript:

3-D visualization streamlines flow- accelerated corrosion and other nuclear plant inspection programs Costantino Lanza, CEO INOVx Solutions, Inc.

Introduction 3D as valuable component of plant operations and maintenance –Improves asset management Best practice for certain tasks; expanding to other uses –Best practice in Engineering and Inspection Explore its use for Flow Accelerated Corrosion

Flow-Accelerated Corrosion (FAC) Major cause of catastrophic piping failures at power stations Mitigation programs includes standardized, formal, and rigorous inspection and documentation for nuclear units FAC susceptibility and severity has been correlated to geometry and “flow singularities” –expansions, contractions, orifices, tees, & elbows PHYSICAL CONTEXT IS CRITICAL!

3D visualization 1.Laser scan the actual plant equipment, accurately captures as-built environment 2.Convert scan data into high-fidelity 3D object model 3.Integrate with existing databases 4.Anchor all data, information, and knowledge to the as-built objects VIRTUAL REALITY MODELS OF THE ACTUAL PLANT

Getting to 3D Individual Laser Scans Globally Registered Point cloud Model Survey Grid CAD Model 1 2 As-built / As-is As-designed

Petroleum Refinery example Risk-based inspection at National Cooperative Refinery Association (McPherson, Kansas) 85,000 Bbl/day processing facility 50% of the facility in 3-D models Entire piping circuits are assessed “as a system” Number of inspection points reduced by 50%, inspection hours reduced by 20-30% Being integrated into CMMS, DCS, condition monitoring system, and outage planning processes and procedures Improved compliance with OSHA, API standards IMPROVE PLANT RELIABILITY AND UTILIZATION

Streamlined Inspections Inspection teams receive a booklet with everything they need to inspect a circuit –Location –Piping –Test routines –Thickness monitoring locations (TMLs) –Corrosion monitoring locations (CMLs) –Testing procedures Procedures are available in 3D, dynamically connected with plant data AVOID OUTDATED LEGACY DRAWINGS, P&IDS, PIPING RECORDS, DATA SHEETS; ELIMINATE NEED TO CREATE NEW ISOMETRICS

Potential Benefits for Nuclear Plants Reduced worker RAD exposure in the field by reducing inspection hours Improved insurability profile Improve accuracy of CFD predictive codes Avoid interpolating from approximate 2-D models Direct access of data from FAC management software Color code to show trouble spots, hot spots, etc. Avoid use of generic models for components –Moisture separator reheaters –Inlet/outlet piping headers –Condensers IMPROVE ANALYSIS; PERFORM IT SAFELY

Illustration Benefits Color-coded piping circuit Higher FAC susceptibility shown as higher temperature colorsHigher FAC susceptibility shown as higher temperature colors Intuitive understanding of spatial extent of FACIntuitive understanding of spatial extent of FAC Better communicate threats and recommendationsBetter communicate threats and recommendations Suggest solutions – e.g., eliminate short-coupled ells, change geometry of piping junction, increase size of the combined lineSuggest solutions – e.g., eliminate short-coupled ells, change geometry of piping junction, increase size of the combined line

Going beyond…Refinery crude unit

Boiler plant – world’s largest crude oil processing facility

Crude Tower Outlet…

Piping run to/from crude tower

From this…

To this…

EPRI Recommendations for FAC programs Ease training of backup personnel and maintain continuity of program when experts are lost to attrition and retirement Formalize sharing of data – ensure all staff operate from same “picture of reality Ensure high level of quality assurance in documenting procedures and preparing tasks Facilitate periodic review of all phases of the program Simplify management practices by which analyses, predictive models, and documentation are kept current Facilitate updating or revalidating records 3D VISUALIZATION ASSISTS WITH ALL THE ABOVE!

Summary 3D technology emerging as best practice –Already proven in other industries Many uses and applications Flow Accelerated Corrosion management and analysis greatly improved with 3D All aspects of physical asset management improve with 3D visualization

Questions? Contact me at: