Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.

Slides:



Advertisements
Similar presentations
CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Advertisements

Organization of Primary Entities
Construction Contracting
Lessons Learned: CM at Risk & Design Build
Guidelines for Successful Scope and Procurement The Problem Success rate for intelligent transportation systems life cycle is very low Success rate for.
Design-Build: RISKS OR REWARDS for the Consulting Engineer?
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
A Match made in Heaven? Connecting you with a builder.
Utah’s Use of CMGC & Project Delivery
Responding to Sources Sought and Request for Information Charles Williams September 8, 2011.
Your Deliver Method... …Pick it Early
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
CTC-470 Construction Administration Project Management Concepts.
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Measure L Program Implementation Management Considerations Report to the Board of Trustees San Joaquin Delta Community College District July 13, 2004.
CIVL202 Construction Engineering I Tutorial 6 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
PROJECT DELIVERY SYSTEMS
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
PROCEDURES FOR SELECTING THE CONTRACTOR
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
David McGiven FAC: Construction April 2006 Facility Advisory Committee (FAC) Construction Procurement David.
Policy 7003 Review BCPS Facilities Task Force – Policy Subcommittee Report July 16, 2015.
Honoraria for Design Build Projects Methodology Assessment Matrix.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
Procurement and Construction Management and Oversight What Board Members Need to Know Jerry Smiley, AICP 24 July 2013.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
Chief Legal Counsel, OSFC
Project Delivery Options in the California Construction Market CSI Fresno Chapter - February 16, 2010 PROJECT DELIVERY OPTIONS in the CALIFORNIA CONSTRUCTION.
Welcome to the OCR Academy. Overview of Rules & Law Craig Weise Construction Reform Program Director.
DESIGN-BUILD The Culture of Builders The “Design–Builder" is typically a general contractor. Some design–build firms employ professionals from both the.
January 24, …a delivery method which entails a commitment by the Construction Manager to deliver the project within a Guaranteed Maximum Price (GMP).
January 31, …a delivery method in which the construction team is known as the design-builder…and is responsible for taking a concept developed by.
1 Essa G. Al-Ansari 2nd PMI AGC Energy Forum DMS Debates DMS Debates Project owners should increasingly adopt the Cost Plus Model over LSTK.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
EXAMPLE – Quality Control Plan For Contractors To view the Pre-Award Phase presentation, please go to: Click on "PIPS"
Agency Construction Management :CM NOT AT-RISK
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
You passed the Bond or secured some funds What do we do now? 2014.
Project Delivery Methods CM CONSTRUCTION DOCUMENTS Kevin A. Delorey 11 Feb 2010.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
Construction Management At Risk Process
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
IDM Chapter 104 Utility Coordination Gail Lee Highway Utility Engineer, INDOT June 21, 2016.
© 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved. © 2014 HDR, all rights reserved.
CHANGING PROJECT DELIVERY SYSTEMS
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
2016 SAME Small Business Conference - Atlanta
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
Lease-Leaseback Project Delivery Method
CM at Risk v. Design-Bid-Build
PROJECT DELIVERY METHODS
Enterprise Content Management Owners Representative Contract Approval
CHANGING PROJECT DELIVERY SYSTEMS
Project Delivery Systems
Design-Bid-Build (Ch. 149) vs. Construction Manager at Risk (Ch. 149A)
PROJECT DELIVERY METHODS
Building Construction Delivery Systems
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC

Four Stops to a Project Delivery System  Can you use an alternate method?  Are we talking the same language? Defining PDS and their attributes  How to select the right PDS  Implementing the selected PDS

Ability to Use  State’s have been making changes to local laws and codes to allow APDS  FAA AC 150/ D provides for APDS

Defining PDS and their Attributes –Comparing PDS –PDS Overview

Selecting the Right PDS 1.Factors for Consideration 2.Suggestions for Selection 3.Additional Reference Material

Implementing the selected PDS 1.Contract Types and Language 2.Management Execution

What are the Options?  Design Bid Build  Single Prime; Mulitple Prime  Construction Manager  Construction Manager at-Risk aka CM/GC, CMR, CMc  Design Build  Design Build Operate Maintain  Design Build Operate Transfer  others

Options  Generally fall into 3 Categories –Design Bid Build –Construction management at Risk –Design Build

Options (continues)  Project Delivery includes Project Management  In-House  Outsourced –Program Management –Construction Manager as Owners Agent

Design Bid Build  Owner holds contracts separately with a designer and construction contractor  Design and Construction are sequential  Significant owner involvement requiring owner decisions  Costs are known at construction award  Responsibility for design is owner

Risk  Transfer of responsibility and significant risk from the owner to the for the entire construction effort, “performance risk”, including subcontract administration and coordination, cost and schedule.  The is responsible to each construction subcontractor for coordination, delay or impact on the overall construction effort.  The owner remains responsible to the builder for design errors.  The owner retains control of design quality.

Risk (continues)  The owner retains control of design quality.  The ability to gain the builder’s input to design, phasing, logistics and value management decisions is increased.  Daily Owner involvement, required resources and control over the construction effort are less.  The CM effort may add cost.

Design Build  The owner holds a single contract with the DB entity for the delivery of the entire project.  The design and construction often have overlap where construction may begin before design is 100% complete, similar to a fast-tracked project.  Procurement may begin prior to construction.  Specifications are performance-based rather than prescriptive.

DB (continues)  Minimal daily Owner involvement, resources and decisions are required as compared to DBB and  Design and construction quality are primarily controlled by the DB entity as the emphasis is on cost and schedule control.  Dependent on contract conditions and form, costs are generally known once the DB contract is awarded, and usually, though not always, are fixed no later than the midpoint of design when the scope is firm.

DB (continues)  Transfer of responsibility and most risk from the owner to the DB entity for the entire design and construction effort.  The ability of the builder to influence design, planning, phasing and value management are maximized..  Number of qualified bidders and high bid cost may limit competition.

Recommended Steps to Select an APDS  Identify and define what goals and objectives are most important to project success for your specific circumstances.  Identify and define the special or unique issues that must be addressed.  Recognize the limits of resources and expertise of your owner organization.  Select the PDS that most effectively can meet or achieve those requirements.  Recognize and acknowledge the trade- offs made in your selection of a PDS.

Implementation Considerations  Contract Type –Firm Fixed Price –Reimbursable –GMP  Management Execution –How the owner carries out its responsibilities vs. how design and construction firms carry out their collective responsibilities

Additional Reference Materials  Construction Industry Institute's (CII) Research Summary titled Owners Tool for Project Delivery and Contract Strategy Selection dated June 2001  CII Implementation Resource 165—2 titled Users Guide dated September  Design/Build Selector Tool found at the University of Colorado civil engineering web site.  Associated General Contractor’s books –Project Delivery Systems –DB guides and checklists

Four Steps to a Project Delivery System –Ability to use Alternate Methods –Establishing Options for PDS –and PM –Selection Methods