Flight Validation of Instrument Flight Procedures

Slides:



Advertisements
Similar presentations
1 Documentation Legal Framework Air Navigation Orders Guidelines ATS Manual Airport Manual Safety Management Manual ICAO Annexes Licenses / Certificates.
Advertisements

Module N° 4 – ICAO SSP framework
Module N° 3 – ICAO SARPs related to safety management
Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
Introduction to Navigation Specifications
Navigation Applications perspective on ADQ
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
International Flight Inspection Symposium
P. GAYRAUD /B. RABILLER Cologne the 21st of June 2007
High Level Overview of ICAO Responsibilities
Performance based navigation: The ICAO PBN programme
EPSON STAMPING ISO REV 1 2/10/2000.
International Committee for Airspace Standards and Calibration ICASC.
CERTIFICATION PRINCIPLES AND PROCEDURES
Establish Verification Procedures (Task 11 / Principle 6)
ICAO Provisions for Safety Management
Flight Validation and Pilot Training
Ch3. CP AND ENVIRONMENTAL MANAGEMENT SYSTEMS Course on Cleaner Production Middle East Technical University Department of Environmental Engineering Ankara.
APAC PBN Seminar F.LECAT (ICAO)
What SMS means for an Operator’s relationship with the CAA
 QUALITY ASSURANCE:  QA is defined as a procedure or set of procedures intended to ensure that a product or service under development (before work is.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
Area Nav: RNP Evolution
CAR/SAM Regional Guidance Material on Air Traffic Services Quality Assurance Programmes NAM/CAR/SAM Quality Assurance Workshop Gustavo De León Regional.
Software Quality Assurance Implementation Plan June 15, 2004 Defense Nuclear Facilities Safety Board Chip Lagdon Director Office of Quality Assurance Programs.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
WORKSHOP LANGUAGE PROFICIENCY REQUIREMENTS IMPLEMENTATION March 2010 Rome - Italy REGULATORY ISSUES ON TESTING Eleonora Italia Enac Personnel Licensing.
ICAO Aerodrome Safety Workshop Almaty, Kazakhstan – 18 to 22 November 2002  AERODROME MANUAL.
Introduction to PBN Seminar ICAO PBN Implementation 1.
TDAW103A Practical Training Balance Mark Christie workplace project Cluster workplace project Use training packages.
International Civil Aviation Organization and ISO/TC 211 ISO/TC 211 Seminar Berlin, 29 October 2003 ISO/TC 211 Seminar Berlin, 29 October 2003.
SPED Certification Program September 17, 2003 Houston, TX.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Important informations
ICAO Requirements on Certification of Aerodromes Module - 2
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
1 SBAS Implementation in the regions of ACAC and ASECNA Project with Community research funding Al-Hoceima Demonstration.
EVALUATION. VIDEO -WHATS FOR LUNCH GENERAL AVIATION PILOT EXAMINER REVIEW  30% TO 40% OF REGIONS GENERAL AVIATION PILOT EXAMINERS ARE NOT CONDUCTING.
LECTURE 4: ICAO CHART requirements
Single Pilot Resource Management (SRM) And The CFI
United Nations Oslo City Group on Energy Statistics OG7, Helsinki, Finland October 2012 ESCM Chapter 8: Data Quality and Meta Data 1.
Maintenance RAST Conclusions 15 June Maintenance Procedures SE-17, SE-18, SE-19, SE-20 Output 1 (SE-17)  FAA will issue guidance, to their field.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
Definitions, Goals and Objectives Embry-Riddle Aeronautical University Chapter 3.
Chapter 6 Requirements for a Maintenance Program.
ICAO COSCAP - SA May AERODROME CERTIFICATION COURSE How can aerodrome certification be achieved? Establish an appropriate regulatory system within.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Authority Requirements Margit Markus Tallinn, 7 May 2009.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision  Aeronautical Information Services Provider.
ISO17799 / BS ISO / BS Introduction Information security has always been a major challenge to most organizations. Computer infections.
APAC PBN Seminar F.LECAT (ICAO)
Flight Validation Process of RNP APCH Procedures: Thailand Case Study
Air Traffic Organization
Agenda Item 6 GNSS Development Status and Future Work Eric Chatre, EC/ESA Rapporteur Technical WG, GNSS Panel Thank you… Good morning… I am ... and.
Draft PANS-AIM Chapter 4 ICAO Headquarters: 4th-8th November
Training Course on Integrated Management System for Regulatory Body
Session – 4: Existing ICAO Standards relating to Air Traffic Control
Systems Design, Implementation, and Operation
This teaching material has been made freely available by the KEMRI-Wellcome Trust (Kilifi, Kenya). You can freely download,
USOAP Continuous Monitoring Approach (CMA) Workshop
RNAV-RNP CERTIFICATION SUMMARY RNAV-RNP EVOLUTION RNAV-RNP CERTIFICATION SUMMARY2 On-Board Navigation Monitoring 2016.
Air Traffic Quality Assurance Program
AIS Manual (Doc 8126) Air Navigation Procedures for AIM Seminar
PANS-AIM (Doc 10066) Air Navigation Procedures for AIM Seminar
Balanced Approach to Noise Mitigation
Balanced Approach to Noise Mitigation
NAM/CAR/SAM Quality Assurance Workshop Gustavo De León
USOAP Continuous Monitoring Approach (CMA) Workshop
Aerodrome Certification Workshop
Presentation transcript:

Flight Validation of Instrument Flight Procedures ICASC Draft Guidance Material for the Quality Assurance Manual For Procedure Design (Doc 9906) Glenn Bissonnette Fabrizio Maracich

ICASC Introduction Currently representing 12 countries with 20 members from the International Flight Inspection/Calibration Community comprising Regulatory Authorities, Service Providers, Equipment Manufacturers, Academia, Research Organizations and System Integrators Established in 1995 to support the International Flight Inspection Symposium ICASC has an established working relationship with ICAO and was recently listed as a recognized international organization to participate in suitable ICAO forums.

ICAO Tasking - Wellington ICASC Meeting ICASC Operations and Safety Work group tasked with creating draft guidance material for flight validation pilot training and certification requirements First workgroup meeting held at ICAO Headquarters in June 2009 Recognized shortfall of flight validation guidance material Recommended adding FV material to the Quality Assurance Manual for Flight Procedure Design Doc 9906 Volume 5 Flight Validation of Instrument Flight Procedures Volume 6 Flight Validation Pilot Training and Evaluation

Flight Inspection Vs Flight Validation Flight Inspection evaluates signals in space to meet intended use. Flight Validation is a flight assessment of a new or revised IFP to confirm it is operationally acceptable for safety, flyability, design accuracy, ARINC 424 coding and required infrastructure

Need for Flight Validation Connects Virtual to Real World IFP data bases and System (FMS/Simulator) databases have varying degrees of accuracy Flight Validation verifies: Course and Path clear of obstacles No interference experienced IFP delivers aircraft to proper aiming point All published data is correct

Data Accuracy and Integrity ARINC 424 leg path & terminators provide the desired ground track and vertical path Requires accurate survey data Types of Data Errors: Survey Data errors common Terrain and obstacle data may be incomplete Conversions between geographic datums Input errors to FAS data

Flight Validation of Instrument Flight Procedures QA Doc 9906, Volume 5, Draft Flight Validation of Instrument Flight Procedures Procedures for Air Navigation Services-Aircraft Operations (PANS-OPS, Doc 8168) requires States to perform ground and flight validation of instrument procedures Object of conducting FV is to ensure safety, procedure data integrity and flyability Volume 5 attempts to provide the framework for the validation process Preflight Validation Simulator Evaluation as required In-Flight Validation Post Flight

Validation Process Overview Flight Validation encompasses both ground and flight elements Includes Pre-Flight, In-Flight, Post-Flight activities required for evaluating IFP’s FV must be conducted: For initial certification of IFP For recertification after flight path and database changes to an existing IFP By a qualified and experienced flight validation pilot

PRE FLIGHT FLIGHT POST FLIGHT Procedure Design Ground Validation Quality Assurance Conduct Pre-Flight Validation Outcome of Pre-Flight Validation Sim Eval Required? Conduct Sim Eval (recommended practises) Outcome of Flight Validation Required? Conduct Flight Validation Flight Validation Conduct Post-Flight Activities Procedure Implementation PASS FAIL YES NO PRE FLIGHT FLIGHT POST FLIGHT

Pre-Flight Validation Outcome of Pre-Flight Validation Conduct Pre-Flight Validation FAIL Outcome of Pre-Flight Validation FAIL PASS

Pre-Flight Inventory and Review IFP package Perform an electronic data review Identify items that require flight inspection Review special operational and training requirements Review operational considerations Document the results of the pre-flight evaluation

FLIGHT FAIL PASS Conduct Sim Eval YES Sim Eval (recommended practises) Required? YES FLIGHT NO Outcome of Sim Eval FAIL PASS Flight Validation Required? Conduct Flight Validation YES NO

Simulator Evaluation Evaluate necessity for a sim eval Conduct simulator evaluation Document the results of the sim eval

Flight Evaluation Perform database verification Assess obstacle and infrastructure Conduct flyability and human factors assessment Complete associated validation tasks (Comm, lighting, markings…) Verify chart depiction and details Perform the flight(s) Record flight validation data

Conduct Post-Flight Activities FAIL POST FLIGHT Outcome of Flight Validation NO FAIL PASS Conduct Post-Flight Activities

Post-Flight Assess the results of flight evaluation Document the results of the Flight Validation For satisfactory Flight Validations, complete IFP Processing, including dissemination of information and documents to the proper Authority for publication For unsatifactory Validations – return supporting documents to the procedure designer for correction

The Aiming Point The goal is to consistently validate IFP to the highest standard to ensure Safety, Efficiency and Ease of use

?

Thank you