Huntly Flood Alleviation Scheme

Slides:



Advertisements
Similar presentations
Bewdley Flood Alleviation Scheme. Bewdley, November 2000.
Advertisements

. Shoebury Common Flood Risk Management Scheme What is this exhibition for? This exhibition explains the various options considered for improving protection.
Dam Removal in Rhode Island: Present and Future David Chopy, DEM July 16, 2009.
Northumbrian Water Ouseburn Flooding - Brunton Park Meeting 17th January 2006.
What do Civil Engineers do? Design Civil Infrastructure Roadworks Earthworks Stormwater Management.(Including Detention & Quality Measures) Sewer Water.
Stormwater Management Jamie Geils Lock, Project Engineer DuPage County Stormwater Management.
Water Management Options for Surface Drainage RED RIVER BASIN TECHNICAL AND SCIENTIFIC ADVISORY COMMITTEE (BTSAC) BRIEFING PAPER #3 September, 2014 BTSAC.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
1 TOWN OF NEWMARKET FLOODING ON SEPT. 13, 2006 Committee of the Whole February 5, 2007.
COMMUNITY PRESENTATION
Engaging with Planning Agents Reform of the Planning System 30 April 2015.
TRANSPORTATION POLICY COMMITTEE FINAL REPORT AND RECOMMENDATIONS PROFESSIONAL AND TECHNICAL STAFF COUNCIL ALUMNI CENTER APRIL 2, 2003.
Members Seminar 15 September 2014 Flood Risk Christina Harrhy – Chief Officer, Neighbourhood Services Stephen Jarrett, Andrew Villars, Mark Strickland.
Project Scope Hire Consulting Firm to perform following:
Implementing an Energy Management System Brendan Thorne Aughinish Alumina Limited.
Severn Tidal Power Feasibility Study Background to the study Terms of reference announced in January 08 Aim of the study: To enable Government to decide.
National Planning Policy Framework. 2 Planning reform: main aims Put power in the hands of communities - with policy that is radically streamlined and.
SNH PERSPECTIVE ON PLANNING AND THE ENVIRONMENT Derek Manson Planning Adviser.
Croft Castle Biomass From Harvest to Heat Chatsworth House - 8 th July 2015 Presented by Ed Wood.
NRCS Watershed Rehabilitation
SHORELINE MANAGEMENT PLAN REVIEW (SMP2) South Devon and Dorset Coastal Authorities Group SDADCAG.
River Kelvin Case Study
Flooding John Backley,OCC and The Environment Agency.
Sunshine Coast Regional District Development Cost Charges July 3, 2014 Infrastructure Services Committee Bob Twerdoff.
Storms and Flooding across Aberdeenshire December 2012 Stephen Archer, Director of Infrastructure Services William Munro, Area Manager (Kincardine & Mearns)
MID WEST AREA STRATEGIC PLAN PRESENTATION BY LIAM CONNEALLY, DIRECTOR, MID-WEST REGIONAL AUTHORITY November 2008.
Presentation to HAUC (UK) Wednesday 30 May 2012 RINA London.
Chapter 33 Dam Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Give reasons why.
Crisis in Shrewsbury Flooding impacts and risk management.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Neighbourhood Planning. Frequently Asked Questions What is Neighbourhood Planning? What can a Neighbourhood Plan do – and what can it not do? What are.
FLOOD RISK MANAGEMENT The next steps. The National Technical Advisory Group On Flooding Issues An Overview and the Future.
Planning schemes Statutory documents under s.20(2) of LUPAA –outline policies and objectives –regulate or prohibit use or development of land –reserve.
BELMONT TRANSPORT PACKAGE A49 – B4349 (Relief Road Southern Section) Meeting 14 June 2013.
FLOOD DEFENCES ALONG THE R. MEDWAY AROUND TONBRIDGE.
Flood Risk Management Cosgrove Creek Section 205 Planning Basics.
A96 Fochabers Bypass Moray Council 15 August 2007.
Ottawa’s Light Rail Transit Project OLRT Update to Finance and Economic Development Committee March 2011.
Millbrook Dam Environmental Assessment Study Dan Marinigh CAO/Secretary-Treasurer Otonabee Region Conservation Authority October 20, 2015 Otonabee Conservation.
Working with Communities to Minimise Flood Risk Chris Murray Head of Strategic Planning.
Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
River Basin Management Planning Cath Preston Senior Planning Officer (River Basin Planning) 2 nd March 2006.
Communities M40 J12-J14 – Data Analysis, Modelling and Scheme Development.
Suwannee-Satilla Drainage Basin: Flood Control Issues and Requested Action Suwannee-Satilla Regional Water Planning Council Douglas, GA December 8, 2010.
CIVIL PARKING ENFORCEMENT Environment & Regeneration Scrutiny Committee 24 January 2007.
Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel.
Water.europa.eu Agenda point 5.f “Better Environmental options in flood management” Strategic Coordination Group, Maria Brättemark, WFD Team,
Planning Commission Study Session: Preferred Plan July 23, 2015.
Policy Background Roger White Head of Policy. Aberdeenshire Council – Vision Serving Aberdeenshire from mountain to sea – the very best of Scotland The.
An Overview of Coastal Management Issues Overview and Scrutiny Co-ordinating and Call-in Committee, 10 March Andrew Wainwright, Environmental Health.
Planning Performance Agreements in Camden PAS Pre- Application Services Workshop - 10 June 2014 Frances Wheat Head of Development Management.
Moving Towards Better Housing- Scrutiny Commission on the Future of Council Housing Amanda Skelton Executive Director, Neighbourhood Services 4 March 2003.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Wellingborough SUE’s Julie Thomas Head of Planning and Local Development.
TIF 9 (Trinity River Vision) Expansion and Updated Project and Financing Plans Jay Chapa, Director Housing and Economic Development.
Neighbourhood Planning in Haringey Myddleton Road Strategic Group 7 th November 2013.
A303 Ilchester Flooding. Presentation to Somerset Rivers Authority Board meeting 26th October Sarah Lewis : Asset Manager.
Bridgwater Tidal Barrier Scheme Update for Somerset Rivers Authority
Arlington Traffic Management Plan
Measure A Financial Oversight Committee August 7, 2013
Lower Makefield Township Community Meeting
Severn Tidal Power Feasibility Study
Slaughden SMP Policy Review
Assessing Vulnerability & Climate Change Impacts
Briefing to HRTAC re: HRBT Expansion Project Cost Estimates, Funding Mechanisms, and Next Steps December 13, 2018.
Scottish Government Responsible for environment & flooding issues
Suffolk Chamber of Commerce Transport & Infrastructure Group
RIBA Plan Tom Robinson sir david Swindells Vii
Presentation transcript:

Huntly Flood Alleviation Scheme Presentation for tonight: Brief re-cap of previous findings What we have done since last meeting The next steps Interim emergency arrangements

Huntly Flood Alleviation Scheme Initial study by Halcrow Group concluded 1:100 year flood event in 2009 Flooding caused by overtopping of River Deveron banks at Milton Excess water diverted to Meadow Burn Capacity of Meadow Burn embankments and 4 culverts unable to cope Aberdeenshire Council approved development of scheme in principle in May 2010 and instructed investigation of funding options

Huntly Flood Alleviation Scheme What we have done since last meeting: Appointed Atkins to take scheme forward Examined Halcrows recommendations in more detail Reviewed and refined flood modelling- discussed and agreed methodology and results with SEPA Now believe 2009 storm return period significantly less than 1:100 year event Examined effects of different flood return periods Confirmed more frequent smaller scale flooding could result from overland flows from Ittingstone Burn exceeding capacity of structures in Meadows Saw that in December- culverts under all-weather pitch backed up

Huntly Flood Alleviation Scheme What we have done since last meeting: Undertaken geomorphological study to ensure that any adverse impacts on WFD status of river will be avoided Geomorphology is the study of landforms and processes that shape them- here, the effects of river sediment movement Status is a measure of ecological/environmental quality of river Resulted in preference to set back river defences to avoid bank erosion Undertaken preliminary site investigation to determine nature and permeability of underlying ground and quality of existing embankment materials Examined different technical solutions

Huntly Flood Alleviation Scheme What we have done since last meeting: Undertaken preliminary consultations, identified and considered environmental constraints Key ones being badger sett and historic Huntly Castle Established utility service locations Arrived at modified preferred solution Checked proposals against requirements of the Reservoirs Act This considers the dam effect of impounding water above a certain volume

Huntly Flood Alleviation Scheme What we have done since last meeting: Completed an economic appraisal or cost benefit analysis For justification must demonstrate that value of damages prevented is more than the cost of the scheme In this case ratio of benefit:cost is 1.1 Held initial discussions with landowners Secured approval from Policy and Resources Committee on 21 April to implement scheme Preliminary cost of scheme £2.9m Timescale- April 2012 at very earliest So what does scheme now entail?

Huntly Flood Alleviation Scheme Revised proposals Reposition bund at Milton away from water edge Easier to construct but greater impact on farm land Construct low bund to east of Gibston Bridge Heighten/strengthen bunds along north & west sides of Meadow Estate Extend bund across Meadow Burn at entrance to estate and regulate flow to capacity of culverts downstream Will result in water being stored in field immediately upstream Construct low bunds to prevent backflows into caravan site Replace small culvert with footbridge Install enlarged/extended culvert with flap valve and low bunding at Ittingstone

Huntly Flood Alleviation Scheme The Next Steps Develop design to detailed stage Undertake formal consultations Obtain Statutory approvals including Planning permission or Flood Order Obtain CAR licence if necessary Commence land negotiations Could result in CPO if agreements or compromises not possible Prepare contract documentation/invite tenders Continue discussions regarding possible funding contributions Grampian Housing Association & Transport Scotland Construction start date will largely depend on level of objections and/or difficulties with land negotiations

Huntly Flood Alleviation Scheme Interim emergency arrangements Installation 2 pairs 10’x10’ storage containers One to west Pine View One close to junction Riverside Drive and Rowan Avenue Planning permission required Stocked with sandbags for self help Responsible key holders to be identified Grampian Housing have own arrangements Onus remains on property owners to be prepared