ArrivalsServiceWaiting line Exit Processing order System Queuing Systems: basic elements.

Slides:



Advertisements
Similar presentations
Chapter 15 - Material & Capacity Requirements Planning(MRP/CRP)
Advertisements

To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 15 Resource Planning.
Chapter 10 Quality Control.
Quality Assurance (Quality Control)
1 © The McGraw-Hill Companies, Inc., 2006 McGraw-Hill/Irwin Technical Note 9 Process Capability and Statistical Quality Control.
To Accompany Russell and Taylor, Operations Management, 4th Edition,  2003 Prentice-Hall, Inc. All rights reserved. Chapter 15 Statistical Quality Control.
1 DSCI 3123 Statistical Process Control Take periodic samples from a process Plot the sample points on a control chart Determine if the process is within.
BMM 3633 Industrial Engineering
1 Manufacturing Process A sequence of activities that is intended to achieve a result (Juran). Quality of Manufacturing Process depends on Entry Criteria.
Quality Control Pertemuan 12 Mata kuliah: J Manajemen Operasional Tahun: 2010.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall8-1 Chapter 8: Statistical Quality Control.
Adeyl Khan, Faculty, BBA, NSU Quality Control Adeyl Khan, Faculty, BBA, NSU Phases of Quality Assurance 10-2 Figure 10.1 Acceptance sampling Process.
Dependent Inventory: Material Requirements Planning BA 339 Mellie Pullman.
Chapter 18 Introduction to Quality
Operations Management
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 10 Quality Control.
8-1 Quality Improvement and Statistics Definitions of Quality Quality means fitness for use - quality of design - quality of conformance Quality is.
Management of Waiting Lines
Push and Pull Systems: Lecture 12
Chapter 18 Management of Waiting Lines
19-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
Rev. 09/06/01SJSU Bus David Bentley1 Chapter 10 – Quality Control Control process, statistical process control (SPC): X-bar, R, p, c, process capability.
10-1 McGraw-Hill Ryerson Operations Management, 2 nd Canadian Edition, by Stevenson & Hojati Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights.
Managing Business Processes: Design and Improvement Cheng Li, Ph.D. California State University, Los Angeles January 2002.
Statistical Process Control. Overview 1.Definition of Statistical Process Control 2.Common causes and assignable causes of variation 3.Control charts.
1 1 Slide © 2001 South-Western College Publishing/Thomson Learning Anderson Sweeney Williams Anderson Sweeney Williams Slides Prepared by JOHN LOUCKS QUANTITATIVE.
10-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
CHAPTER 10 Quality Control/ Acceptance Sampling McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The.
10-1Quality Control William J. Stevenson Operations Management 8 th edition.
Process Capability and SPC
Managing Business Processes: Demand Management Cheng Li, Ph.D. California State University, Los Angeles January 2002.
Operations Management Material Requirements Planning
1 Slides used in class may be different from slides in student pack Chapter 16 Materials Requirements Planning  Material Requirements Planning (MRP) 
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Chapter.
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
Material Requirements Planning
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1998 Material Requirements Planning (MRP) Chapter 15 11/7/05 Overview Position of MRP in Operation.
Business Processes Sales Order Management Aggregate Planning Master Scheduling Production Activity Control Quality Control Distribution Mngt. © 2001 Victor.
Chapter 10 Quality Control.
To Accompany Ritzman & Krajewski Foundations of Operations Management, © 2003 Prentice Hall, Inc. All rights reserved. Chapter 12 Resource Planning.
Operations Management
Managing Quality CHAPTER SIX McGraw-Hill/Irwin Statistical Process control.
Managing Business Processes: Demand Management Cheng Li, Ph.D. California State University, Los Angeles July 2000.
Statistical Process Control
Statistical Quality Control/Statistical Process Control
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Resource.
Statistical Quality Control
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Sixth Edition © 2002 Prentice Hall, Inc. All rights reserved. Chapter 15.
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Resource.
Inspection- “back-end quality control” BUT, Start by designing quality into the front end of the process- the design QFD (Quality Function Deployment)
Resource Planning Chapter 15.
Quality Control  Statistical Process Control (SPC)
Manufacturing Systems Engineering
Les Jones IET 603. Shewhart Control Charts for: characteristics such as: length, width, temperature and volume. 1.Understand the statistical basis of.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 30 1.
MOS 3330 Operations Management Professor Burjaw Fall/Winter
CHAPTER-14 MRP AND ERP MD. TAZIDUL ISLAM. 2  Material Requirement Planning (MRP) is the concept of designing and developing information system to aid.
Chapter 16 Introduction to Quality ©. Some Benefits of Utilizing Statistical Quality Methods Increased Productivity Increased Sales Increased Profits.
WAITING LINES AND SIMULATION
Facility Inventory Old Facilities Modern Facilities Classroom Size
10 Quality Control.
10 Quality Control.
Chapter 16 Materials Requirements Planning
MRP and ERP.
QUALITY CONTROL AND QUALITY ASSURANCE (Contd.)
14 MRP and ERP.
Material Requirement Planning (MRP)
Statistics for Business and Economics
Resource Planning Chapter 16
Waiting Line Models Waiting takes place in virtually every productive process or service. Since the time spent by people and things waiting in line is.
Presentation transcript:

ArrivalsServiceWaiting line Exit Processing order System Queuing Systems: basic elements

Multiple channel Multiple phase Queuing Systems: multiple phases

Modeling with Queuing Theory System Characteristics – Population source: finite, infinite – No. of servers – Arrival and service patterns: e.g. exponential distribution for inter-arrival time – Queue discipline: e.g. first-come-first-serve

Measuring Performance Performance Measurement: – System utilization – Average no. of customers: in line and in system – Average waiting time: in line and in system e.g. infinite source, single server, exponential inter-arrival and service times, first-come-first- serve: (see handout)

Optimum Cost of service capacity Cost of customers waiting Total cost Cost Service capacity Total cost Customer waiting cost Capacity cost =+ Basic Tradeoff

System Utilization Average number on time waiting in line 0 100% Basic Tradeoff (cont.)

Applying Queuing Theory In Process Design: – Describe the process and establish a model – Collect data on incoming and service patterns – Find formulas and/or tables, software to calculate performance measures – Use performance measures to guide process design decisions

Applying Queuing Theory In Operations: – Monitor performance measures – Use performance measures to guide process improvement and operations decisions

Statistical Process Control Emphasis on the process instead of the product/material Focus on “prevention”

UCL LCL Sample number Mean Out of control Normal variation due to chance Abnormal variation due to assignable sources Control Chart

Sample number UCL LCL 1234 In-Control: random only

Control Charts for Variables Mean Chart: measuring sample means Range Chart: measuring sample ranges i.e. max-min

UCL LCL UCL LCL R-chart x-Chart Detects shift Does not detect shift process mean is shifting upward Sampling Distribution Out-of-Control: assignable & random shifted mean

UCL LCL R-chart Reveals increase x-Chart UCL Does not reveal increase (process variability is increasing) Sampling Distribution Out-of-Control: assignable & random increased variability

Mean LCLUCL  /2  Probability of Type I error Type I Error:

Mean LCLUCL Type II Error: In-Control Out-of-Control

p-Chart - Control chart used to monitor the proportion of defectives in a process c-Chart - Control chart used to monitor the number of defects per unit Control Charts for Attributes

Counting Above/Below Median Runs(7 runs) Counting Up/Down Runs(8 runs) U U D U D U D U U D B A A B A B B B A A B Counting Runs Figure Figure 10-12

Lower Specification Upper Specification Process variability matches specifications Lower Specification Upper Specification Process variability well within specifications Lower Specification Upper Specification Process variability exceeds specifications Process Capability

Process mean Lower specification Upper specification 1350 ppm 1.7 ppm +/- 3 Sigma +/- 6 Sigma Process Capability: 3-sigma & 6-sigma

Input/Output Analysis Change in inventory = Input - Output Average throughput time is proportional to the level of inventory.

Input flow of materials Inventory level Scrap flow Output flow of materials Flow and Inventory Figure 11.1

MRP A general framework for MRP Inputs: Bill of Materials, Inventory Files and Master Production Schedule MRP Processing

A General Framework of MRP Aggregate Plan Master Production Schedule MRP Capacity Requirements Planning Production Scheduling

Master Production Schedule

Bill of Materials C (1) Seat subassembly H (1) Seat frame I (1) Seat cushion J (4) Seat-frame boards Figure 15.10

Inventory Files On-Hand Open Orders Lead Times Vendor Information Quality records, etc.

MRP Explosion Item: Seat subassembly Lot size: 230 units Lead time: 2 weeks Gross requirements Scheduled receipts Projected on-hand inventory Planned receipts Planned order releases 37 Week Figure 15.11

Item: Seat subassembly Lot size: 230 units Lead time: 2 weeks Gross requirements Planned receipts Planned order releases Week Item: Seat frames Lot size: 300 units Lead time: 1 week Gross requirements Scheduled receipts Projected on-hand inventory Planned receipts Planned order releases 40 Week Item: Seat cushion Lot size: L4L Lead time: 1 week Gross requirements Scheduled receipts Projected on-hand inventory Planned receipts Planned order releases 0 Week Usage quantity: 1 MRP Explosion Figure 15.11

Issues in MRP Two basic concepts: – Net requirements – Lead time offset Lot size Safety stock/Safety lead time Inventory records Validity of the schedules

JIT and Inventory Management Inventory as delay in work flow Why inventory? – Dealing with fluctuations in demand – Dealing with uncertainty – Reducing transaction costs – Taking advantage of quantity discount – Hedging against inflation, etc.

JIT and Inventory Management Inventory costs: – Holding cost – Long response time – Low flexibility – Slow feedback in the system

JIT and Inventory Management The objective of JIT: – General: reduce waste – Specific: avoid making or delivering parts before they are needed Strategy: – very short time window – mixed models – very small lot sizes.

JIT and Inventory Management Prerequisites: – Reduce set up time drastically – Keep a very smooth production process Core Components: – Demand driven scheduling: the Kanban system – Elimination of buffer stock

JIT and Inventory Management Core Components: (cont.) – Process Design: Setup time reduction Manufacturing cells Limited work in process – Quality Improvement