Telecoms: a trendy investment target again? The way forward Can regulation help? Budapest, December 4th 2013.

Slides:



Advertisements
Similar presentations
CoE/ARB Workshop On Infrastructure Sharing and LLU Session 4 Infrastructure Sharing Drivers and Blocks By: Isabelle Gross Khartoum – Sudan, 27 – 29 March.
Advertisements

- Telecom Services Equity Research Broadband, Economic Growth and the Financial Crisis January 30 th, 2009 Christopher C. King
PG. 1 Some lessons learned on NGN deployment and take up Tiziana Talevi Brussels, June 16th 2011.
National Broadband Network: Some Big Policy Issues.
LLU and Broadband Regulation in France July 2005 Autorité de Régulation des Communications Electroniques et des Postes.
Christian Berg Fibre deployment by utility companies in Denmark EU Digital Agenda Assembly event Workshop 5: Facilitating wide-scale broadband.
Broadband to everybody!? Torstein Olsen Director Norwegian Post and Telecommunications Authority LLU Conference, Bucharest, 5 July 2005.
©Ofcom A regulatory perspective on FTTx deployments Chinyelu Onwurah, Head of Telecoms Technology, Ofcom 19 th June 2007 FTTx Summit.
EoO or EoI and is there another way to prevent discrimination? BEREC roundtable on Equivalence of Inputs Bruxelles, April 29th 2014.
Ireland’s Broadband Performance and Policy Actions January 2010.
Regulatory issues raised by access upgrade investment: where we are in the UK debate Richard Budd Senior Regulatory, Economist, BT 16 September 2008
Importance and development of broadband access in Lithuania Paulius Vaina Communications Regulatory Authority of the Republic of Lithuania ITU Regional.
1 Access regulation and incentives for investment in alternative broadband infrastructure* Harald Gruber Presentation for REGULATION AND COMPETITION SEMINAR.
© 2007 Verizon. All Rights Reserved. PTE /07 FCC Workshop Global Broadband Connects the World Jacquelynn Ruff Vice President, International Public.
-1- Entrance of Cable TV Service Provider into Broadband Internet Service Market : Service Bundling and Role of Access Charge By Jae-Hyeon Ahn, Jungsuk.
1 End of Regulation? Jerry Hausman Professor of Economics MIT July 2005
Development of BB markets Access markets (M4 & M5) and remedies applied Linda Paršova 10 TH BALTIC ELECTRONIC COMMUNICATIONS AND POSTAL SERVICES REGULATORS’
Next Generation Access: A Global / Policy Perspective Maury D. Shenk 27 June 2007.
Lincolnshire Broadband Coverage 29 th February 2012.
POF opportunity for EU Telcos IEEE presentation London | Madrid | Silicon Valley | Miami | Tel Aviv Nov, 2014 Work in progress.
UK Broadband Regulatory Framework David Clarkson 16 th November 2011 NextGen 11 Conference, Bristol, November.
1 Connecting All Americans Link Hoewing VP, Internet and Technology Policy July 15, 2007.
Cost sharing models of NGN rollout in rural or remote areas BEREC-EaPeReg-REGULATEL-EMERG Summit Barcelona, 2-3 July 2015.
Network Convergence Policy in China July Introduction In China, the regulation and development of telecom/internet networks and broadcasting networks.
G.Pūras Development of Broadband markets Communications Regulatory authority of Lithuania Electronic communications department Disclaimer: The.
Commercial in confidence The economic challenges of reaching broadband ubiquity Speeding up NGN ubiquity: a pillar for digital growth Athens, 13 February.
Vivien Foster & Cecilia Briceño-Garmendia, World Bank.
Subject: Analysis of European Mobile Operators Strategies towards Multiple Play Services Provision Dr. Sergio Ramos Universidad Politécnica de Madrid
International Telecommunication Union Committed to Connecting the World The World in 2009: ICT Facts and Figures Jaroslaw K. PONDER Strategy and Policy.
Investment in next generation networks A competitive approach to stimulating Europe’s broadband future - CEPS 22 February 2007.
Broadband Internet Current and future challenges for regulators: a selection Athens – June 1, 2007 Philippe Defraigne Cullen International
ICT and regional integration in the EU and ASEAN EU Centre in Singapore 29 October 2010.
Development of Broadband in Thailand TCT Seminar on “Future Communication Technologies” January 29, 2010 Miracle Grand Hotel, Bangkok Dr Supot Tiarawut.
Rura l broadband and its implications for the future of Universal Service The Israeli Case OECD, Porto, October 2004 Uri Olenik Director General Ministry.
9 March 2001 Page 1 Broadband in Australia Vicki MacLeod Manager Public Policy and International Regulatory Legal & Regulatory
Pro-competitive EU Framework delivered a success story: affordability, higher speeds, more investment 2.
Broadband for All through Universal Service? 17 June 2010, Lisbon.
Liberalization of Telecommunications in Europe Pál Belényesi 27 October 2006 Verona.
Robert C. Atkinson Ivy E. Schultz December 10, 2009 Broadband in America Where It Is and Where It Is Going (According to Broadband Service Providers)
RIGHT-OF-WAY DAS PROPOSAL by Newpath Networks ARIZONA The Path to Broadband Connectivity.
AFFORDABLE broadband of ADEQUATE quality THROUGHOUT Sri Lanka
Christos Limnatitis General Manager Cyta Greece Towards a European Digital Single Market Telecom Regulation 14/02/2014_Zappeio.
1 Status of Broadband New Delhi 15 December 2006 Presentation by S.C. Khanna, Secretary General Association of Unified Telecom Service Providers of India.
The Hard to Reach Areas NextGen 11 Scotland May 2011 © Avanti Communications Group plc.
Federal Office for Communications Digital Agenda for Europe Going local 2013: Switzerland.
1 TINF 2010 Tuesday 30 November 2010 Present and Future Regulation of Electronic Communications Vesa Terävä European Commission Information Society & Media.
Views expressed are those of the author and may not reflect opinion of ITU, its members or the government of the Hong Kong Special Administrative Region.
Presentation to Joint Oireachtas Committee [27/01/2016] Jeremy Godfrey, Chairperson Kevin O’Brien, Commissioner Gerry Fahy, Commissioner.
Finnish NGA state-aid scheme Antti Kohtala Ministry of Transport and Communications Finland Digital Agenda Assembly, Brussels, 16th June 2011.
The European way to think the Digital World Technological convergence and new business models: the example of TV over DSL Extending ICT Opportunities.
Inês Nolasco Senior Regulatory Affairs Manager European Competitive Telecommunications Association.
Super-fast Fibre Access Angharad Davies, Policy and Public Affairs, Openreach Openreach makes every effort to ensure the information in this presentation.
October Penetración de principales servicios finales | Penetration rates for final services (lines/100 inhabitants) 2.
home-broadband-speed-to-160mbps/ BT boosts fibre-to-the-home broadband speed to.
Mec1224 EETT: From Telecommunications to Electronic Communications Athens, 28 March 2005 “Investment and competition in electronic communications services.
Local loop Unbundling Dr. ZOUAKIA Rochdi ANRT. Presentation outline Definition of Unbundling local loop (LLU) Importance of LLU Types of LLU : Description.
Welcome to Northamptonshire. Current Situation Parts of Northampton can receive 50mb/s 12% of Northants only able to receive under 2mb/s (based on line.
SYNERGIES IN ROLL-out of networks by Energy UTILITIES and telecoms 26 June 2014, Brussels Joachim Hoenig, Director, Brussels Representatives Office Group.
Broadband Workshop Facilitating Broadband Investment French regulatory framework Bertrand Vandeputte ARCEP European Commission – DG INFSO March 23rd, 2011.
1 Robert MarchantJanuary 2011 Where could we be in 5 to 10 years time Where are we today in the provision of Broadband Services What is Government Policy.
UCLL Sub Loop Co-Location Economic Life of a Cabinet.
Broadband regulation in Denmark 24. September 2009 TRIS workshop Tomas Skov Lauridsen National IT and Telecom Agency, Denmark.
European Commission 5G Action Plan
Innovation in the Access Network- Our evolving portfolio and ecosystem
Regulation of NGA networks – the EU experience
Autor / Thema der Präsentation
Broadband market in Latvia
5G (IMT-2020) Enabling Digital Services
Very High Capacity and 5G Networks: from the EU code to the EU market
Telecommunications Markets in the Nordic and Baltic Countries 2018
Presentation transcript:

Telecoms: a trendy investment target again? The way forward Can regulation help? Budapest, December 4th 2013

Fastweb’s unique positioning in the NGA market 2,5 Mln Tablet WiFi 2,3 Mln Connected TV RomaBari Palermo Napoli Ancona Firenze Pisa Livorno Bologna Reggio Emilia Venezia Trieste Verona Padova Milano Bergamo Brescia FW FTTH footprint FW FTTS footprint 1.8 million households passed by proprietary FTTH in 7 cities Extensive LLU coverage in over 1000 local exchanges Thanks to end-to-end control of infrastructures, first operator in itlay to launch 20 Mb/s service and 100 Mb/s (in 2008) Since 2012 first Altnet in Europe to massively deploy FTTC: 3.5 million households covered by 2014 in 20 cities

Would the Connected Continent package foster investments?

The assumptions Telecom sector declining in Europe, while growing steadily in other areas of the world, due to “too many operators” and too much regulation… Sector profitability and investments can be boosted by supporting consolidation and reducing competition through more relaxed rules on SMP and by privileging VULA versus physical access Measures proposed would increase the market power of incumbent operators and limit the possibility of infrastructure- based competition by Altnets

Considering LTE as a competitive constraint would impact on the identification of markets subject to ex-ante regulation even in countries with low or no cable penetration. Reducing the scope of access regulation will eventually lead to re- monopolization of fixed market in many countries and/or regions. Fixed broadband would be offered by one, maximum two operators (incumbent/cable) in most countries Are we going back to square one? The new approach to identify relevant markets will progressively reduce the scope of access regulation

Favoring virtual vs. physical access provides vertically integrated operators a monopoly in deploying NGA FTTC/FTT S FTTH fiber Fiber (1500 m) Street cabinet copper sub-loop (400 m) Limiting access to sub-loop would curb Altnet’s capability to deploy NGA and reduce infrastructure-based competition in NGA FTTS - the new paradigm for NGA deployment - requires Altnets to deploy fiber only to the cabinet and use the legacy copper network from the cabinet to the user premises Unlike FTTH, FTTC is quick to roll out and financially sustainable also for operator with a limited market share. Altnets can play this game!

Will consolidation and a reduced competition support profitability and increase the incentives to invest?

Performances of fixed operators in EU and US are comparable Source: Deutsche Bank 2012; Bernstein Research 2012 Source: At&t Financial report, Verizon financial report

Limited competition determines low degree of innovation… Areas not covered by BB Areas covered by a single DSL provider Areas covered by more than one provider Most US users have a very limited choice of one DSL provider and one cable operator Extended areas not reached by any DSL provider Areas covered by fibre Source FCC broadband maps FTTx connections are only 2% of total (OECD, 2012) 9 Limited competition doesn’t seem to imply higher profitability or more investments…

AT&TVERIZONCOMCASTTWC Advertised speed 3 Mbps1 Mbps20 Mbps1 Mbps Intro price/month 29,95 $19,99 $39,99 $19,99$ Standard price/month 41,00 $n.a.42,95-64,95 $n.a. Usage cap/month 250 GB--- Cheapest broadband package available* AT&TVERIZONCOMCASTTWC Advertised speed24 Mbps150 Mbps105 Mbps50 Mbps Intro price/mo 54,95 $134,99 $89,99 $74,99 $ Standard price/mo66,00 $134,99 $114,95 $n.a. Usage cap/mo 250 GB--- … high retail prices for comparatively poor services… * Highest speed broadband package available * Retail prices higher than in EU, also for basic speeds Very limited availability of ultrabroadband packages, at very high prices *All prices exclude local taxes Source: operators’ commercial websites – 16th July 2013

…and business models that will reduce the degree of innovation Thanks to limited competition, fixed broadband providers are increasingly moving away from flat fees and introducing data caps, at the expenses of consumers and innovation …but it’s definitely bad news for end users.!

The other side of the story: the critical role of Altnets in triggering the race to fibre

Most EU countries feature low or no cable penetration: reducing Alnets capability to compete effectively would destroy any incentive for the incument to deploy NGN Competitive pressure is the only driver for investments in NGA For former monopolist, first best is maintaining the status quo and leveraging existing asset, not investing in NGN…. The italian case is the perfect example: despite LLU price increase in (and therefore increased profitability), TI plans to deploy FTTH have been constantly reduced and eventually completely scrapped….

In 2011 Fastweb started to develop a plan to deploy FTTC to increase its existing FTTH NGA footprint Negotiation with Telecom Italia were launched to access street cabinet. Fastweb FTTC plan: a game changer Fastweb’s plan to massively deploy FTTC in 20 italian cities (increasing its overall FTTx coverage from 2 mln hh to 5.5 in 2014) played a key role in shaping Telecom Italia’s own NGA plans Telecom Italia and Fastweb signed an MoU to reach synergies in the deployment of their respective FTTC networks In september 2012 Fastweb and TI announced final plans to deploy parallel FTTS networks. Telecom Italia developed its own plan to roll- out FTTC, overlapping existing and planned Fastweb’s NGA footprint

Thanks to its FTTC network Fastweb offers speeds three times higher than Telecom Italia >70 Mbps Average downstream for 80% of active FTTC customers >90 Mbps Average downstream for 40% of active FTTC customers 15

1,8 billion€ earmarked to develop fixed and mobile NGA in Italy (3.6b in the next two years) On top of already planned LTE investments, Vodafone will dedicate part of the resources to cover 150 italian cities with FTTC, with the objective of reaching 6,4 milions of hh (25% of the population) November 2013: Vodafone joins the race to fiber!

Competition and availability of physical access services are key to create the right incentives for investments

No virtual product can be equivalent to physical access Access to LLU/SLU Altnets can provide BB and UBB services beyond the incumbent’s footprint Altnet choose the active technology (VDSL, Vectoring, G-Fast etc.) Altnets can upgrade speed an QoS any time they want Altnets free to install technical equipment of their choice Virtual access Altnets are limited by the incumbent VULA’s geographical coverage Incumbent decides technology: altnets cannot install any equipment that is different (more performing) than incumbents’ Altnets’ can chose the performance to offer to end- customers within a pre- determined and limited range of speeds and QoS features

LLU played an essential role in allowing Altnets to compete effectively with the incumbent and to innovate Thanks to its end-to-end control of the network Fastweb was able to offer higher speeds and better QoS than the incumbent on copper lines, compete on differentiation (rather than prices), SLU will enable Fastweb and other Altnets to invest in FTTC to apply the same competitive pressure on NGA products Physical access services are key enabler of infrastructure-based competition Maintaining SLU and setting the right price will be critical to maintain the right incentive to invests for all market players

SLU and vectoring can coexist! Speeds enabled by non- vectored VDSL2+ are in many cases already in line with DAE targets Multi-operator vectoring is a reality and can be easily achieved through the right regulatory policy!