Montreal Refinery Horizon Project: Delayed Coking Unit Presentation for Occupational Hygiene Association March 26, 2008 Colleen Stevenson MHSc, CIH, ROH.

Slides:



Advertisements
Similar presentations
Cathy Beahm Technical Assistance Specialist NH DES, Air Resources
Advertisements

ENVIRONMENTAL MONITORING AT SOLID WASTE (SW) LANDFILLS QUIZ Ruxandra Floroiu, Environmental Engineer, ECSSD WB Safeguards Workshop Chisinau, Moldova October.
EPA’s Clean Power Plan Proposed Rules for Reducing GHG Emissions from Power Plants Presentation to ACPAC June 16,
Caltex Refinery Commitment to Operational Excellence A Presentation to the Environmental Affairs and Tourism Parliamentary Portfolio Committee By Steve.
Plant Operations. Throughput & Waste Types 2 Process Trains equating to 40,000 tonnes pa Expansion to 3 Trains will give 60,000 tonnes pa Hazardous and.
Pagina 1 de 3 CEPSA Química QUIMICA Palos de la Frontera Jul 12 th, 2012 CEPSA QUIMICA PALOS DE LA FRONTERA IPPC DEVELOPMENT.
A Quick Lesson On Crude Oil
The Use of Fractional Distillation to separate components of Crude Oil
And the contamination of Industrial Wasteland Adam Stanley Jonathan Beeson.
USEPA Petroleum Refinery Enforcement Emerging Issues February 22, 2011.
Oil and Gas Air Quality Authorizations in Texas
Oilheat Air Emissions and the Advantages of Low Sulfur Fuel A Presentation to NYS Dept of Environmental Conservation Presented by: John E. Batey, PE, President.
1. © 2013 Petroch Services Pty Ltd BP Version J11002– Occupational Hygiene in the Oil & Gas Industry Occupational Hygiene in the Oil & Gas Industry Day.
African Centre for Statistics United Nations Economic Commission for Africa Session 5: Statistics on Air emissions and air quality Workshop on Environment.
Air Pollution Nick Meyers-Turner Kourtney bailey.
TCEQ Air Permits Division Justin Cherry, P.E. Ahmed Omar Stephen F. Austin State University February 28, 2013.
What Goes On In An Oil Refinery? AIChE Speaker this presentation is probably too long; pick and choose from this material.
Combined Heat and Power and Air Quality - Guidance for Local Authorities Ed Dearnley Policy Officer.
1 MARPOL – Annex VI Control of Air Pollution from Ships from Ships and its Current Revision process Dr. Tim Gunner, Technical Consultant, Intertanko.
A History and Status of CEMS Applications in USEPA Regulations Dale Evarts US EPA December 16, 2002 Better Air Quality in Asian Cities 2002
Siemens.com/answersunrestricted © Siemens AG 2013 All rights reserved. SIHARBOR: The shore connection System for berthed ships Systems and Solutions for.
Overview of Oil & Gas Sector The following slides are not a tutorial but merely an overview of the various phases involved in an oil & gas development.
Title: Coal Cowboy Duration: 00:12:51 Link: engr
Natural Resources.
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
Update on Dairy Air Quality Regulations Frank Mitloehner, PhD Associate Air Quality CE Specialist Animal Science UC Davis.
Environment and Reduction of Emissions The Application in Ships
Home sweet home... Or is it???? Breathing! Some basics.
INDUSTRY HYGIENE MONITORING AT JB COCOA SDN BHD JB Cocoa Sdn. Bhd. Is a cocoa processing plant in the Port of Tanjung Pelepas (PTP), Johor that operated.
Air Quality Revision.
Air Quality Governance in the ENPI East Countries Regulation of non-Annex I activities in the CR and UK Monika P ř ibylová.
Presentation Overview Alaska air pollution Pollutants Sources What is an emissions inventory?
Economic and Cross Media aspects Bo Jansson Swedish Environmental Protection Agency
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
Refinery Processes Muhammad Fahad Ansari.
Crude oils and fuels Crude oil and fuels Click to continue.
Phased Environmental Impact Assessment (EIA) Process for Oil & Gas Development in New Brunswick Department of Environment January 2011.
Synopsis EIA Purpose of EIA Origin Key Elements NGO Participation Content Analysis 1.
Summary Measures What is a summary measure. Primary Energy Consumption All forms of energy, direct and indirect, that used to process the raw materials.
Area Sources and Fugitive Emissions: Source Management James Payne Morongo Band of Mission Indians Environmental Protection Department.
Climate, Air Quality and Noise Graham Latonas Gartner Lee Limited RWDI Air Inc.
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
Differential Absorption Light Detection and Ranging Recent Experiences in Emissions Measurement Cary Secrest, US EPA Office of Civil Enforcement Air Enforcement.
Mobile Source Committee Update OTC Committee Meeting September 13 th, 2012 Washington, DC 1.
Vent Gas Mitigation PTAC Environmental Forum January 30, 2002 Bruce Peachey, P.Eng. New Paradigm Engineering Ltd., Edmonton.
Environmental Economics: Issues, Instruments and Institutions ECON*4930, Lecture 1 Prof. McKitrick.
Massachusetts Multi-pollutant Power Plant Regulations Sharon Weber Massachusetts Department of Environmental Protection EPA Utility MACT Working Group.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
Voivodeship Inspectorate of Environmental Protection in Szczecin ASSESSMENT OF AIR QUALITY IN SZCZECIN AGGLOMERATION.
URANIUM: The Mines & Radioactive Waste Left Behind.
Stephen Othen Technical Director Fichtner Consulting Engineers Ltd Monitoring – On-site and Off-site THE GROUP.
Nonattainment New Source Review (NA NSR) Program Raj Rao US Environmental Protection Agency Office of Air Quality Planning and Standards ,
NPRA Annual Meeting 2003 Effects of Feed Quality and Product Specification Changes on Refined Product Supply Joanne Shore John Hackworth Energy Information.
PARTICULATE MATTER: REGULATORY RESPONSE Presented by: Karl Loos.
Stephen F. Austin State University February 27, 2014 Justin Cherry, P.E. Reece Parker TCEQ Air Permits Division.
Pressure and Flow Analysis Through EPANET Open source software package for hydraulic simulation of water distribution networks Used to determine impact.
Chapter 11 Environmental Performance of a Flowsheet.
EPA Methane Regulations Details on the Final Rules and Summary of Impacts May 16, 2016 Producer: Claire Carter Edited by: Afzal Bari Director: Afzal Bari.
Garfield County Air Quality Monitoring Network Cassie Archuleta Project Scientist Board of County Commissioners – Regular Meeting.
March 28, 2013 Office of Research and Development 1 National Risk Management Research Laboratory, Air Pollution Prevention and Control Division. Oak Ridge.
1 Emissions Inventory Overview–Part 1 Melinda Ronca-Battista, ITEP.
Veolia Rye House Energy Recovery Facility
Petroleum Refinery Troubleshooting Part 2
SIHARBOR: The shore connection System for berthed ships
Reducing Air Pollution
Air Pollution Prevention
Nuclear Power Update for The Society of American Military Engineers
Crude oil Treatment process
Environmental Compliance
Trends, Challenges, Opportunities Presentation to PEMEX Refining,
Presentation transcript:

Montreal Refinery Horizon Project: Delayed Coking Unit Presentation for Occupational Hygiene Association March 26, 2008 Colleen Stevenson MHSc, CIH, ROH

AGENDA 1.Purpose of Presentation 2.What is the Horizon Project? What is a Delayed Coking Unit? 3.EH&S Deliverables on the Project 4.Examples of Interesting Issues

Purpose of this Presentation To share my EH&S experiences on a large scale project. Why? –To share learnings and network with others who may be doing something similar –To demonstrate how EH&S professionals can be involved in the design of a facility to mitigate EH&S risks prior to operation –To validate that the IH education/experience provides a background that positions us well for any disciplines within EH&S field

The Horizon Project- an upgrade to Montreal Refinery Involves the construction of a delayed coking unit (DCU) or a “coker” Involves the revamp of process units and offsites & utilities When its all said and done: –271 Pieces of Equipment –96 Km of Pipe –9000 Tonnes sof Steel –29,400 Cubic Metres of Concrete –800 Km of Cable and Wire –~$1,000,000,000 Dollars –6,400,000 Man-hours –People Petro-Canada, Bantrel (Engineering Procurement, Construction Management firm), contractors, subcontractors

Montreal Refinery-Coker Simulation Picture

The Challenges 1.Language 2.Safety Culture in Quebec 3.Cost Constraints 4.Tight construction schedule 5.Largest Downstream project 6.Working with an EPCM on such a project

What the Heck is a Coker? The benefit of a delayed coking unit is that it allows the refinery to use a lower cost crude; It makes more valuable products like gasoline and distillates vs lower margin products like asphalt and heavy fuel oil; reduces our imports of gasoline/distillates

Simple Coker Block Flow Diagram Off gas Light naphtha Heavy naphtha Distillate Gas Oil Vacuum Tower Bottoms/Asphalt Coke Coke Drum Fractionator Charge Heater Kero Extraneous Feeds

My Involvement/EH&S Deliverables Refinery Site 1.Involvement with Certificate of authorization process and stakeholder engagement 2.Involvement with design for the whole project –Ensure design meets regulatory compliance and internal practices –Meet deliverables for project management system 3. Involvement with on site safety/prevention program and construction –Creating the H/S Program including details around CSST Principle Contractor issues –HSE resources on site to support the project –Setting expectations with Sr. Management of Contractors to understand their H/S programs –Creation of Metrics –Stewardship TME (Port) –Storage area for coke at the Port of Montreal –Involvement with self assessment –Monitoring Canterm and C of A process Marsulex (Sulphur Plant) –plant next door that takes our H2S laden streams and converts it to sulphur (its the sulphur plant for Shell and PC) –Review t of expansion options and impact on emissions –Walk through and preliminary review of safety program

Assessments To Support Permits or Stakeholder Engagement Dispersion modeling for combustion emissions using by- law 90 equation for permit Additional dispersion modeling and deposition modeling using Aermod for PM 10 and 2.5um Baseline noise survey and then modeling estimate of new coker impact (occupational and community risk) Community Risk/Impact Assessment Soil Assessment for classification and occupational hazard risk Economic Impact Assessment

Environmental Emission Impact Summary of air emissions (M T/ Y) RefineryPost Coker Differences 2010 vs 2005 Carbon monoxide (CO) % Sulphur dioxide (SO2)5,0793, % Nitrogen oxide (NOx)1,7051, % Volatile organic compound (VOC)1, % Particulates % Benzene % CO 2 Equivalent (KMT / Y) CO 2 Equivalent 1,2811, % Vapour recovery project for ship loading will reduce benzene emissions

Interesting Issues 1.PM 10 and PM 2.5 emission modelling 2.Noise- City by-law 50 dBA; Quebec MDDEP, 40 dBA or ambient (43 dBA) Ongoing modelling to determine predictive compliance 3.Tank Dykes –Current gas oil and Sour Water W tank dyke capacity constraints –New SW tank will be added as part of project 4.Coker foundation work next to live butane spheres

Coke Handling and Particulate Emissions There are emission factors related to all coke handling sources. Credit for controlling emissions is taken. Final emission releases are calculated and then placed in a dispersion model to determine impact to the community

PM 2.5 particulate emissions in community Draft Air Quality Regulation stipulates 24 hr average of 30 ug/M3 Results from new coker unit and existing plant indicate 1.8 ug/M3 However background of City at closest air monitoring stations is 32 ug/M3

Sour Water and Gas Oil Tanks Concerns included: 1)Dyke capacity 2)H2S concentrations in the event of catastrophic release

Coker Foundation Work Close to Butane Spheres Significant schedule delays if coker foundation work is not started this year Live butane spheres Current berm around spheres needs to be removed and recontoured Then rock removal 3-4’ Then build barrier wall Then start foundation work It would appear that this is a significant risk but how much? We engaged Ertugral Alp-risk consultant

Summary The education and experience in IH has left me well positioned to understand and manage effectively, the complexities of this large scale project

Back up Slides

Project Management Deliverables