LCLS-II: 5 KeV, 1 MHz FEL Driven by a 4 GeV SRF linac – based on XFEL / ILC technology Chris Adolphsen and Marc Ross Tokyo LCWS13 Meeting, 11/14/13.

Slides:



Advertisements
Similar presentations
Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
Advertisements

11/27/2007ILC Power and Cooling VM Workshop Mike Neubauer 1 RF Power and Cooling Requirements Overview from “Main Linac Power and Cooling Information”
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Beam loading compensation 300Hz positron generation (Hardware Upgrade ??? Due to present Budget problem) LCWS2013 at Tokyo Uni., Nov KEK, Junji.
LEP3 RF System: gradient and power considerations Andy Butterworth BE/RF Thanks to R. Calaga, E. Ciapala.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
Preliminary design of SPPC RF system Jianping DAI 2015/09/11 The CEPC-SppC Study Group Meeting, Sept. 11~12, IHEP.
1 Results from the 'S1-Global' cryomodule tests at KEK (8-cav. and DRFS operation) Shin MICHIZONO (KEK) LOLB-2 (June, 2011) Outline I. 8-cavity installation.
Low Emittance RF Gun Developments for PAL-XFEL
Christopher Nantista ARD R&D Status Meeting SLAC February 3, …… …… …… … ….
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
Tom Powers LLRF Systems for Next Generation Light Sources LLRF Workshop October 2011 Authored by Jefferson Science Associates, LLC under U.S. DOE.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
LCLS-II Power Coupler Nikolay Solyak, Ivan Gonin, Andrei Lunin C.Adolphsen - SLAC TTC meeting, March 23-27, 2014 AWLC2014, FNAL, May 12-16,
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
SRF Requirements and Challenges for ERL-Based Light Sources Ali Nassiri Advanced Photon Source Argonne National Laboratory 2 nd Argonne – Fermilab Collaboration.
1 Simulation for power overhead and cavity field estimation Shin Michizono (KEK) Performance (rf power and max. cavity MV/m 24 cav. operation.
Linac RF Source Recommendations for Items 22,23,24,46,47 Chris Adolphsen.
Ding Sun and David Wildman Fermilab Accelerator Advisory Committee
Aug 23, 2006 Half Current Option: Impact on Linac Cost Chris Adolphsen With input from Mike Neubauer, Chris Nantista and Tom Peterson.
1Matthias LiepeAugust 2, 2007 Future Options Matthias Liepe.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
KCS and RDR 10 Hz Operation Chris Adolphsen BAW2, SLAC 1/20/2011.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
BEAMLINE HOM ABSORBER O. Nezhevenko, S. Nagaitsev, N. Solyak, V. Yakovlev Fermi National Laboratory December 11, 2007 Wake Fest 07 - ILC wakefield workshop.
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
CW and High Average Power Workshop BNL The Diamond Storage Ring IOT based High Power Amplifier Morten Jensen on behalf of the SR RF Group.
J. Corlett. June 16, 2006 A Future Light Source for LBNL Facility Vision and R&D plan John Corlett ALS Scientific Advisory Committee Meeting June 16, 2006.
650 MHz Solid State RF Power development at RRCAT
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
ALBA RF Systems Francis Perez.
Main Technical Issues of theSuper B Injector Main Technical Issues of the Super B Injector SuperB Meeting, Isola d’Elba, May 31st – June 3rd, 2008 D. Alesini,
Matthias Liepe. Matthias Liepe – High loaded Q cavity operation at CU – TTC Topical Meeting on CW-SRF
CW and LP operation of the XFEL-type cryomodule Jacek Sekutowicz.
Heung-Sik Kang Pohang Accelerator Laboratory
Microphonics Suppression in SRF cavities for Project X Yuriy Pischalnikov Warren Schappert Project X Collaboration Meeting Berkeley, April 11, 2012.
Cavity/CM Considerations for CW Operation Cryogenic loads and cryogen distribution End Group cooling: HOM antenna redesign HOM loads and suppression requirement.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
LCLS-II SC Linac Concept Marc Ross September 13, 2013 (input from Chris Adolphsen)
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Cost Optimization Models for SRF Linacs
Areal RF Station A. Vardanyan
ILC Power and Cooling VM Workshop
A 6 GeV Compact X-ray FEL (CXFEL) Driven by an X-Band Linac
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
Project X: Cryogenic Segmentation Issues
BriXS – MariX WG 8,9 LASA December 13, 2017.
Notkestrasse 85, Hamburg, Germany
Wolfgang Anders, BESSY, Berlin
V. Veshcherevich Cornell University
Accelerator Layout and Parameters
CW Operation of XFEL Modules
LCLS-II-HE FEL Facility Overview
Review of the European XFEL Linac System
Cost Optimization Models for SRF Linacs
CEPC RF Power Sources System
ERL Main-Linac Cryomodule
SCRF for cw operating XFEL
LCLS-II-HE FEL Facility Overview
Electron Source Configuration
Linac LLP Outline LINAC Long Lead Procurements
ERL Director’s Review Main Linac
Presentation transcript:

LCLS-II: 5 KeV, 1 MHz FEL Driven by a 4 GeV SRF linac – based on XFEL / ILC technology Chris Adolphsen and Marc Ross Tokyo LCWS13 Meeting, 11/14/13

2 High-Level Parameters LCLS-II Planning Meeting, Oct 9-11, 2013 Basic Energy Sciences Advisory Committee (BESAC) report: “… It is considered essential that the new light source have the pulse characteristics and high repetition rate necessary to carry out a broad range of coherent “pump-probe” experiments, in addition to a sufficiently broad photon energy range (at least ~0.2 keV to ~5.0 keV) and pulse energy necessary to carry out novel “diffract before destroy” structural determination experiments important to a myriad of molecular systems. …” Goals: 0.2 – 5 keV photon range with high rate (10 kHz ~ MHz) beam 1.0 – 20 keV photon range with LCLS-similar performance

3 SLAC’s proposed answer to BESAC challenge: LCLS-II Planning Meeting, Oct 9-11, 2013 Current Baseline 4 GeV CW Superconducting RF Linac -Based on XFEL / ILC 1.3 GHz cavities -35, 8-cavity 1.3 GHz cryomodules / 280 cavities -3, 4-cavity 3.9 GHz cryomodules / 12 cavities -16 MV/m Gradient; Qo = 2e10 at 1.8 deg K 0.1 mA typical, 0.3 mA max at 1 MHz bunch rate 25 micron bunch length 1.2 MW Max Beam Power 5.5 MW Cryogenics power

4 Location of the SLAC SC Linac 550 m ~ LCLS-II Length Replaces First Kilometer of the Normal-Conducting S-band Linac

5 Accelerator Operating Modes keV (120 Hz) keV (120 kW) keV (120 kW) 4 GeV SC Linac Two sources: high rate SCRF linac and 120 Hz Cu LCLS-I linac North and South undulators always operate simultaneously in any mode UndulatorSC Linac (up to 1 MHz)Cu Linac (up to 120Hz) North keV South keVup to 20 keV higher peak power pulses Cu Linac Concurrent operation of 1-5 keV and 5-20 keV is not possible LCLS-II Overview 4 GeV, 0.3 mA, 1.2 MW New transport lines designed for <10 GeV beam Existing LCLS transport lines for 17 GeV beam SCRF Linac in 1 st km of SLAC tunnel

LCLS-II - Linac and Compressor Layout for 4 GeV CM01 CM2,3 CM04 CM15 CM16 CM35 BC1 E = 250 MeV R 56 = -55 mm   = 1.4 %BC2 E = 1600 MeV R 56 = -60 mm   = 0.46 % GUN 0.75 MeV LH E = 98 MeV R 56 = -5 mm   = 0.05 % L0  = * V 0 =97 MV I pk = 12 A L b = 2.0 mmL1  =  22° V 0 =220 MV I pk = 12 A L b =2.0 mm HL  =  165° V 0 =55 MV L2  =  21° V 0 =1447 MV I pk = 50 A L b = 0.56 mmL3  = 0 V 0 =2409 MV I pk = 1.0 kA L b = mm LTU E = 4.0 GeV R 56 = 0    0.016% 2-km 100-pC machine layout: Oct. 8, 2013; v21 ASTRA run; Bunch length L b is FWHM 3.9GHz * L0 cav. phases: ~(-40 , -52 , 0, 0, 0, 13 , 33  ), with cav-2 at 20% of other L0 cavity gradients. Includes 2-km RW-wake P. Emma, L. Wang, C. Papadopoulos

7 Cryomodules in SLAC Tunnel SLAC Linac Tunnel (11 feet wide x 10 feet high) (3.35 m x 3.05 m)

Fermilab Jefferson Lab Argonne Lab Cornell University SLAC These labs will form an SCRF partnership for development, production and testing; supported by DoE Office of Science - BES 8 LCLS-II SCRF development and production: LCLS-II Planning Meeting, Oct 9-11, 2013 Cornell ERL Cryomodule Cross-section Showing increased Cooling capacity

Georg Hoffstaetter, Cornell University LCLS-II workshop, SLAC 10 October 2013 Horz Dressed Cavity Test (BCP, 120C, HF rinse) 9 Initial Cooldown at 16.2 MV/m Q(2.0 K) = 2.5 x Q(1.8 K) = 3.5 x Q(1.6 K) = 5.0 x K thermal cycle at 16.2 MV/m Q(2.0 K) = 3.5 x Q(1.8 K) = 6.0 x Q(1.6 K) = 10.0 x 10 10

CM Development: US FY CDR Q_0 recipe CM testing CM Prod. First X-rays High Q_0 cryomodule with reduced cryogenics operating costs: Improved cooling capability New cavity surface processing recipe Improved magnetic shielding Adiabatic cool-down process

Peterson, FNAL-SLAC Meeting Sept 10, MHz Cryomodule Design, 21 Feb 2011Page 11 Separate liquid management in each cryomodule but no external transfer line

CW TESLA Cavity Testing at HBZ* * Rev Sci Instrum. 81, (2010) Load at 17 MV/m is 19 W, well below measured 35 W flux limit

Modifications to 2 K Pipes to Accommodate Larger Heat Flow Slightly larger nozzle from helium vessel to 2-phase pipe  Increase from 55 mm to about 70 mm Slightly larger 2-phase pipe  Depends on string lengths and liquid management plan  Retain option for 1.8 K in all piping  Increase from 72 mm to about 90 mm Segmentation of 2 K liquid and 2 K flow distances may also impact this pipe sizing The cryomodule itself will be the most likely source of fast (< 1 sec) pressure changes, so attention to piping and valve configurations are critical Peterson, FNAL-SLAC Meeting Sept 10, 2013

Antenna Modifications for E-XFEL J. Sekutowicz “The feedthroughs are made of high conductivity materials, pure niobium, molybdenum and sapphire. They will be connected thermally to the 2-phase tube with copper braids for better heat transfer to the 2 K environment.”

Parameter ValueComment Gradient16 MV/mOn crest Beam Current0.3 mA Cavity QL4.12 e7 Based on formula on next slide – minimizes power for 10 Hz microphonics (MP) offset Max Power per Cavity ( w MP w/o overhead) 5.72 kWPower with 10 Hz MP offset – no overhead Max Power per Cavity (w MP w overhead) 6.32 kWAssume 94% transmission and 4% overhead Max Power for 48 cavities (w MP and w overhead) 303 kW Either one source per cavity so can track MP locally or one source for 48 cavities RMS MP offset allowed with a 300 kW source 9 HzFor Gaussian distributed MP RF Power, QL and Overhead

Inner Conductor Temperature Distribution with Different Thicknesses of Copper Coating for 15 kW CW RF Power 10µm on outer conductor with RRR=10 Shilun Pei

W.- D. Möller, J. Sekutowicz| CW Operation of XFEL Modules| June 14, 2013| Page 17 CM Gradient (Vector Sum) Stabilization at DESY RF-feedback off Standard deviations for: 1.5E-3 Amplitude = 1.5E-3 0.5° Phase = 0.5° Goal: Stability of the vector sum for the cw operation with the new µTCA LLRF. 3.5 MV/m Conditions: E acc = 3.5 MV/m, mode cw, piezo feedback off, bias on. Test Result: Conclusion: New µTCA RF-feedback improves amplitude and phase stability by factor of 24 and 51 respectively, and fulfills spec for the XFEL linac. RF-feedback on Standard deviations for: 6.2 E-5 Amplitude = 6.2 E ° Phase = ° 1s Vector sum phase QL = 1.5e7

TTC Workshop June 2013, T. Powers, JLAB Microphonic Detuning* C100-1C100-4 RMS (Hz)  (Hz) Determines the Feedback Gain needed for control. Effects are driven by Q L and the available klystron power for lightly loaded cavities Cavity C Cavity C Minor change to the tuner pivot plate substantially improved the microphonics for the CEBAF C100 Cryomodules. While both meet the overall system requirements the improved design has a larger RF power margin

 Reduced detuning by an order of magnitude  Achieved „open loop“ phase stability:13.2°  2.0°  0.02° phase stability achievable  Compensate multiple resonances  Needs implementation into LLRF control and operation with beam MICROPHONICS COMPENSATION AT HZB Axel Neumann  FFT w/o control  f = 2.52 Hz feedback  f = 0.89 Hz feedback & feed-forward compensation  f = 0.36 Hz 19 Time (s) Frequency (Hz) Detuning (Hz) # events Detuning (Hz)

‘BESSY’ Microphonics Example Resulting Energy Variation over Time: 9e-4 variation in a cavity energy gain, which if uncorrelated cavity to cavity, would produce 7e-5 beam energy variation at the end of the linac (ignoring the BCs and the various FB systems) 41 Hz mode driven randomly to yield a 1.5 Hz rms frequency variation – then solve cavity field level with a constant rf input and beam current Claudio Rivetta

Bruker 10 kW CW Source Consists of eight 1.25 kW water-cooled modules - each module has eight 160 W, isolated transistor units that are summed in a coaxial combiner – the output of the each module drives a common WR650 waveguide – no solenoid, HV PS, filament PS nor vacuum pump Newer units with higher power transistors produce 16 kW in one rack Two 10 kW units at HZDR and a 5 kW unit at Cornell

Waveguide Run between Gallery and Tunnel (Also considering 3” coax with ~ 2% additional loss) 27 in diameter, 15 feet long penetrations spaced by 6 m Isolator

Toshiba E kW CW Klystron Beam Voltage49.5 kV Beam Current9.8 A Output Power305 kW Input Power34 W for sat. Perveance0.89 uP Efficiency63.2 % Gain39.5 dB (Need 5 Units plus Spare)

Thompson 540 kVA, 55 kV PS for NSLS II (PSM - summed switching supplies – claim 95 % eff) Need 5 Units plus spare – maybe cluster so rotate role of spare 12 kV AC In 50 kV Out

flex guide Isolator w/ pickups phase shifter custom E-plane bend L 1 =1.5 g custom E-plane T H-plane T custom H-plane bend L 2 =5.5 g NGLS 4 CM Waveguide Layout (6* _rf cavity spacing) 1 of 2 klystron outputs

SC Linac Milestones (version ) SC Linac Preliminary Design Review CM Pre-production Start SC Linac Final Design Review Begin SC Linac Procure / Fab Start CM Production (Start D & D SLAC Linac 0-10) Begin SC Linac Installation Cryomodule Production Complete Complete SC Linac Installation Complete Checkout & no-beam Comm Complete Checkout & beam Comm FIRST LIGHT months 2 yr start + 2 CM / 3 months 28 months 2 CM / 3 months Production: Installation: