Final/Shipout Inspection Approved for Public Release.

Slides:



Advertisements
Similar presentations
MATERIALS CERTIFICATION PROCESS Step by Step. Navigation steps Navigation steps Screen shots of key windows Screen shots of key windows Start off in SiteManager.
Advertisements

Contract CloseOut.
AS9102 First Article Inspection Report
Steps to Homeownership and the Homebuyer Assistance Program Process Homebuyer Education ClassLoan OriginatorReal Estate Specialist HAP Processing Loan.
Ensure Vendor/Engineer of Choice Product Quality
1 HYDROSTATIC TESTING Approved for Public Release.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
Copy Exact Training For SMC Suppliers
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
©2011 Cengage Learning Chapter 11 Processing: DOCS, FUNDING, AND CLOSING By Dr. D. Grogan M.C. “Buzz” Chambers.
First Article Inspection Report
ISO 9001 : 2000.
EPSON STAMPING ISO REV 1 2/10/2000.
How to Document A Business Management System
SUBSAFE Approved for Public Release
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
QLF Contract Quality Clauses Working Group QUALITY LEADERSHIP FORUM CONTRACT QUALITY CLAUSES WORKING GROUP Ken Crane MSFC September 24, 2002.
Quality Management System
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
ISO 9000 Certification ISO 9001 and ISO
DSS-SOC (Deep Submergence Systems Scope of Certification) Program
Instructions and forms
First Article Inspection
E-rate Audits/Reviews Be prepared!! Prepared by Judy Jones, State Library of Iowa.
Basics of Good Documentation Document Control Systems
Electric Boat Supplier Website
1 Inspection and Testing Approved for Public Release.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Receiving Inspection Process for Components and Finished.
Presentation #18 Drug Recalls Drug recalls must be reviewed by the Department and forwarded to the appropriate manager at the LHD. The manager shall.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Construction Defect Mitigation Construction Cost Recovery Construction Litigation Consultants, LLC Jerry Peck Slide 1 of 12 slides / Total.
From Research Prototype to Production
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
Allen Hughes State Materials Office
Chapter 101 The Design Process Chapter 10 Achieving Quality Through Continual Improvement Claude W. Burrill / Johannes Ledolter Published by John Wiley.
1 Package Marking, Packing List and Invoice Data Requirements for EB Receiving & Invoicing Approved for Public Release.
The MIT/QA Plan Issue W. Reiersen. Terminology 1 Product specification: A document generated by the customer identifying requirements and the inspections.
QUALITY MANAGEMENT STATEMENT
1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab.
Design Documentation Clint Kehres, Brian Krouse, Jenn Shafner.
Supplier Quality Improvement
Real Estate Marketing and Sales Essentials Steps for Success Dan Hamilton.
SE513 Software Quality Assurance Lecture10: Documentation and Quality Records Control Galin, SQA from Theory to Education Limited.
Laboratory equipment Dr. W. Huisman Cairo, November 21th 2012.
FORM 1295 “Disclosure of Interested Parties”
Good Laboratory Practice - general information Pirkko Puranen Senior Inspector, Ph.D. Inspectorate.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
Responsibilities of Test Facility Management, Study Director, Principal Investigator and Study Personnel G. Jacobs Belgian GLP Monitorate Zagreb, 17 December.
SQA01 Supplier Guidance Material: Certificate of Conformance Requirements GKN Aerospace Services – CowesDate:13/5/16.
External Provider Control
Production Part Approval Process
Part Approval / Compliance Data Submission via Jotform.com
UW Whitewater Procurement Card Program
SQA01 Supplier Guidance Material: Certificate of Conformance Requirements GKN Aerospace Services – Cowes Date: 13/5/16.
Instructions for MRR in support of Q301
JSA Enhancements SIS competencies May, 2012.
Evaluation of Suppliers of Critical Consumables, Supplies and Services Section February 2016.
First Article Inspection
Part Approval / Compliance Data Submission via Jotform.com
Construction Management
ISO 9001 Awareness Training.
Inspection and Testing
SQA01 Guidance Material: FAI Review
KAMAN AEROSPACE GROUP L. Chodasiewicz - Supplier Quality Assurance.
First Article Inspection
Medical Device Design and Development
Production Part Approval Process
AS 9100 Awareness Training.
Presentation transcript:

Final/Shipout Inspection Approved for Public Release

Final/Shipout Inspection2 Where to Start The Contract Review/Order Entry Checklist generated at the beginning of the order would be extremely helpful… –If not available, need to do a purchase order review now Approved for Public Release

Final/Shipout Inspection3 Where to Start Electric Boat Purchase Order Content and Requirements: –Invoked Drawings –Invoked Material/Product Specifications –Invoked Standard Clauses –Special Instructions invoked specifically for this Purchase Order (Buyer’s text) Supplier’s in-house status of the affected product or service Approved for Public Release

Final/Shipout Inspection4 Electric Boat Purchase Order Requirements Are all Supplements to the purchase order available? Is a complete copy of the purchase order, including line item part number information, drawings, Buyer’s text, standard clauses, etc. available? Approved for Public Release

Final/Shipout Inspection5 Drawings Is the revision of the drawing(s) and/or specification(s) invoked by the purchase order available? Is a complete copy of the drawing including General Notes, Engineering Parts List (EPL), Views, etc. available? Approved for Public Release

Final/Shipout Inspection6 Material Specifications Is the service or product to be delivered in accordance with the specification invoked in the EB purchase order? Is it to the correct revision? –If not, is the revision used allowed per EB Spec Effectivity Index (EB2P756)? Approved for Public Release

Final/Shipout Inspection7 Special Instructions Are there special instructions in the EB purchase order (Remarks or Buyer’s Notes) that affect the hardware and/or documentation? Are there special instructions in the part number that affect the hardware? Approved for Public Release

Final/Shipout Inspection8 In House Status of Material Have all the requirements of the manufacturing and inspection processes and systems been completed? Is Receipt Inspection OQE (test reports) available? Have material markings been applied and maintained and correct? Are in-house Travelers/Routers/Work Orders completed and signed off? Is inspection and testing completed and documented? Are Special Process procedures approved, completed as required, and test reports signed? Etc., etc. Approved for Public Release

Final/Shipout Inspection9 Final Inspection and Testing When all the information has been gathered, the FINAL SHIPOUT INSPECTION can be completed: –Complete final hardware inspection and testing in accordance with the appropriate requirements. –Assure all inspection and testing objective evidence has been documented and is available. –Assure all marking requirements have been applied on hardware, marking is correct, and is completely legible. –Assure all non-compliances are documented and approved on a Vendor Information Request (VIR). Approved for Public Release

Final/Shipout Inspection10 Certification Documents Assure all records, test reports, drawings, specifications, VIR’s, VPAR’s, and other documents required by the Purchase Order are available, legible, and that all work and actions are complete prior to requesting Electric Boat Source Inspection. Assure a copy of the OQE documentation that is to accompany the shipment of hardware is available. Also retain copy for file. Approved for Public Release

Final/Shipout Inspection11 Supplier Delegated Inspection Program (SDIP) Electric Boat Supplier Quality has a program allowing qualified suppliers to act on behalf of Electric Boat Inspection Program is Supplier Delegated Inspection Program, further described in Electric Boat website Quality Section/Documents Approved for Public Release

Final/Shipout Inspection12 SDI Program Benefits Company and Inspectors are qualified and approved by Electric Boat Supplier Quality Assurance to participate in the Program: Established history with Electric Boat 95% Quality Rating for one year minimum Demonstrated capabilities – hardware & software Supplier management commitment to the SDIP Qualified Inspector and Analyst perform inspection and verify OQE documentation on behalf of Electric Boat Inspection. Approved for Public Release

Final/Shipout Inspection13 SDI Program Benefits – (con’t.) No waiting for Electric Boat Source Inspection for Level N product. Assures product and documentation have been verified acceptable prior to shipment. Assures Level 1 and SubSafe product and documentation are adequately prepared for Electric Boat Source Inspection. Approved for Public Release

Final/Shipout Inspection14 Where to Get More Information for the SDIP Electric Boat Web Site ( section) Electric Boat Cognizant Supplier Quality Engineer Electric Boat Buyer Approved for Public Release