The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 6, 2012.

Slides:



Advertisements
Similar presentations
EMC Status Report: November 2003 Roger Barlow Events since last report (25 th Sept.) –The ROD Current status –Electronics –Neutron Generator –Light Pulser.
Advertisements

Safe2Dose June Introduction and Background Introduce Safe2Dose – Had Closed Loop System – Measure Up 2.5 gallon containers x 4 x 8 lbs. –Green alternative.
REMOVE AND INSTALL THERMOSTAT AND TEST OPERATION CS4 A.1 D.6 P-5/6.
State of Oregon, DAS Fleet Fuel Island Operations - Diesel.
11/10/98Online Meeting Julia Velkovska Running and Monitoring the PHENIX Drift Chamber Julia Velkovska and Tom Hemmick.
MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 27, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
MINERvA Module Assembly Prototyping Report Jaewon Park University of Rochester MINERvA Collaboration Meeting, July 29-30, 2005.
Wastewater P2. Environmental Concerns  Heavy metals from sanding waste  Oil, grease, and coolant from vehicles  Toxic chemicals from cleaners, strippers,
Polishing the Ferrules Howard Budd Sep Polishing Epoxy on the Ferrule We glued fibers in the 10 ferrules that Dave Warner gave us One problem.
GAMMA & ROAD TUBE BASICS TRAINING
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 20, 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Nov
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
Introduction to a pit installation
Lift Station Safety and Maintenance Tony Conn, Supervisor Wastewater Collection and Pumping
FLOOD MITIGATION OBSERVATIONS AND LESSONS FROM A FLOOD IN THE SMITH FIELDHOUSE BRIGHAM YOUNG UNIVERSITY AUGUST 2006.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
C. In 15 pounds, how many grams are there? D. If you have 528 cm, how many yards is that? A. How many hours are in 15 days? B. If you have 12 meters, how.
All Exp Mtg April NuMI-MINOS Status Report – Bob Zwaska 78.7e17 protons for the week  Best week on record  Best day on Tuesday – 12.23e17 Decent.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
NUMI NuMI Internal Review July 12, 2001 Infrastructure: Radiation Safety Page 1 Technical Components NuMI Beamline Radiation Safety Issues Radiation Safety.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
Slow Ground Motion Studies at Fermilab James T Volk Accelerator Division Andrey Chupyra, Shavkat Singatulin, Budker Institute of Nuclear Physics Vladimir.
MOM Report Victoria Blackmore VC /06/11 1/7.
06/04/2012Steve Hahn — AEM Meeting1 MINOS Status Report Rack cleanup –All racks vacuumed –All filters cleaned –Wiener power supply/chassis checked for.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep 26, 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar
M. Weber, AEM 4/5/041 Weekly report 3/29-4/4 Delivered:7.7pb -1 Recorded:6.3pb -1 (82%) 12.6M events.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 17, 2011.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
All Exp Mtg Apr 21, 2008 NuMI-MINOS Status Report – Alec Habig FAR DETECTOR: 99.7% live time (wall clock) 99.9% (pot weighted) Annual hoist inspection.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
Fire Recovery Facilities –Physics Computing Services is finally able to relocate back into 1301 as of this week. They will probably be completely off of.
Preparations for Run 6 Don Lynch February 13, 2006.
SPHENIX MECHANICAL D. Lynch & R. Ruggiero July 31, /29/2014sPHENIX Mechanical Design.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jan 25, 2016.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar 30, 2015.
1 Some updates on water and other items… Stony Brook HBD Crew…
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
5 July 2005T. Yasuda, Fermilab D0 Shift Captain Responsibilities Taka Yasuda Fermilab.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 8, 2016.
Sundry LHC Machine Development starts 19 June –Original plan to have 90m comm. next week was torpedoed by private discussions between spokesperson and.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Dec 9, 2013.
Physics 1 Module #5 Supporting Standards. Speed, Velocity, Acceleration Speed is the total distance/total time. Measured as m/sec or km/hr. The hiker.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
University of Colorado – Boulder
Service Procedure For Changing Engine Oil And An Oil Filter
Provides a continuous supply of ready to use product on demand
What are they? How do you get one? And what to do with it.
Low Level Road Project – Traffic Management Meeting August 2012
What We Can Do to Save Energy.
ARIZONA WATER COMPANY East Sedona Water Storage Facility
NEW COMPLIANCE REGULATIONS
February 2019.
Welcome to Middle School Art
Presentation transcript:

The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 6, 2012

MINERvA Detector Jul 2 the detector was powered off for power outage on Jul 10 Tested Rack Protection System (RPS) to the FIRUS system –Blew smoke in smoke detector and RPS trip off MINERvA racks and the alarm was sent by the FIRUS system –We thank Linda Bagby for coordinating this task The detector power has not been turned back on –We started turning on the detector, but the UPS (uninterruptible power supply) stayed on battery power. –UPS is heavy (~ 100 lbs) and we are working out a procedure to replace the UPS using a lift truck and a dolly. We should be able to replace the UPS toward end of week. 2

Divider Wall in front of MINERvA & MINOS The wall between the construction are and the MINERvA and MINOS detector is being constructed. Should be finished by the end of the week 3

MINERvA Plans for Excavation Excavation is scheduled to start on Aug 16 –The excavation will take place at night We planning on running shifts, roughly 2 hours Initially, leave HV off overnight We will turn on HV at start of shift –Run peds and light injection and use online monitoring to look at results. –Goal is to insure all PMTS are OK 4

Plans for Excavation Shifters will be looking at the 3 vibration monitors over previous day and post plots in elog. –Tilt monitors on 4 PMT setup by Linda Bagby and Todd Johnson –2 types of monitors setup by Jim Volk Budker seismometers in back of MINOS Water level sensors –All devices readout out in ACNET Thanks to Accelerator Division for this ES&H will leave 4 dust monitors over night in the MINOS Hall at night when an excavation will take place 5

protect-minerva-cam.fnal.gov Shifter will look at detector to be sure its OK 6 North West North East South West Electronics Rack VME Rack

Drip Pans Overflowed Last Week Drip pans overflowed onto MINERvA roof Roof prevented any water from getting on the detector or racks. 65 gal was drained from the roof using a shop vac Need to clean out drip pans more often Thank PPD for addressing this situation Looking into replacing roof with something else 7 Water

Refilling and Draining the Water Target In filling and draining the water target we used a flow meter. –Put gal in the water target. –Drained gallons,44 gal difference Expect 175 gal, Bob Wands calculation Refilled target, The barrels were weighted before and after the water was put into the target. No flow meter was used –Put in gl We drained the target –Put a drum on the scale and wrote down the weight of the drum before putting water in the drum and after – gal, 0.6% difference which is fine 8