Electrical, Control and Information Systems in the Enhanced CANDU 6 ® Electrical, Control and Information Systems in the Enhanced CANDU 6 ® Candu – Official.

Slides:



Advertisements
Similar presentations
ACADs (08-006) Covered Keywords Defense-in-depth, reactor protection system, solid state protection system, reactor trips, Engineered Safety Feature System.
Advertisements

State Fire Marshal Question and Answer Session with the Louisiana Automatic Fire Alarm Association March 19, 1999.
VSE Corporation Proprietary Information
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
Computer Based Systems R&D-ES, NPCIL. About R&D-ES, NPCIL 1. Established in Computer Based System Software & Hardware Development 3. Systems Developed.
AECL - OFFICIAL USE ONLY / À USAGE EXCLUSIF - EACL Changing the Energy Paradigm? the Impact of Fukushima on the future of Nuclear Power John Saroudis Regional.
Redundant control system (RCS)
2001 TAPPI PCE&I / ISA PUPID Joint ConferenceMarch 27, 2001Page 1 Automated Recovery Boiler Sootblowing Control System Barbara G. Haley; B.A., Accounting;
Issues Associated with the Development of Severe Accident Management Guidelines for CANDU Reactors Keith Dinnie Director, Risk Management Nuclear Safety.
BHEL – Electronics Division, Bangalore
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
1 ACPR Advanced, cost competitive, proven technology, and reliable The Third Generation Nuclear Reactor.
Westinghouse Atom Atom- 1 Design of Digital Safety Systems in NPP Improvements regarding: System Requirements, Engineering, Argumentation for a Safety.
INDUSTRIAL & SYSTEMS ENGINEERING
Wireless Remote Control Derail System CSX Atlanta, GA Track and Derail Graphic layout CSX Atlanta, GA.
2015 January1 CANDU Detector Systems B. Rouben McMaster University EP 4P03/6P Jan-Apr.
Secure Systems Research Group - FAU 1 SCADA Software Architecture Meha Garg Dept. of Computer Science and Engineering Florida Atlantic University Boca.
Distributed Control Systems Emad Ali Chemical Engineering Department King SAUD University.
CHE 185 – PROCESS CONTROL AND DYNAMICS DCS AND PLC FUNDAMENTALS.
Chapter 14: Inspection and Maintenance
Oconee RPS/ESPS Digital Upgrade Presented by: Michael Bailey June 3,
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
Motor Control Center MNS iS with Condition Monitoring
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
Scheduled Versus Event Driven Testing of Distribution Protection IEDs Dr. Alexander Apostolov, Benton Vandiver, Will Knapek, OMICRON electronics.
An Introduction to AlarmInsight
U.S. DOE Light Water Reactor Sustainability Program: Advanced Instrumentation & Controls and Human System Interfaces Research Pathway Bruce Hallbert, Idaho.
IMPROUVEMENT OF COMPUTER NETWORKS SECURITY BY USING FAULT TOLERANT CLUSTERS Prof. S ERB AUREL Ph. D. Prof. PATRICIU VICTOR-VALERIU Ph. D. Military Technical.
Technical Working Group on Nuclear Power Plant Instrumentation and Control Vienna, May 2009 NATIONAL REPORT ON NUCLEAR POWER PLANT INSTRUMENTATION AND.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
TWG-NPPIC, May 2009, Vienna: UK status1 Current status of NPP I&C in the United Kingdom T P Smyth AMEC, Knutsford, Cheshire, UK 22 nd Meeting of the Technical.
1 © 2012 Westinghouse Electric Company LLC. All Rights Reserved.Westinghouse Proprietary Class 3 The Incorporation of the Utilities Input into the Design.
Opportunities and Challenges Joseph Naser Electric Power Research Institute IAEA Technical Working Group on Nuclear Power Plant Control and Instrumentation.
4/2003 Rev 2 I.4.7 – slide 1 of 48 Session I.4.7 Part I Review of Fundamentals Module 4Sources of Radiation Session 7Nuclear Reactors IAEA Post Graduate.
> AREVA NP GmbH NRPP-G, AREVA NP All rights are reserved, see liability notice.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Edward T. Lessard ESHQ.
1 Drivers for Building Life Cycle Integrations Jim Sinopoli.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Risk management and disaster preparedness
Configuration Management for Digital Upgrades Configuration Management Benchmarking Group 2008 Conference Scott Patterson Program Manager for I&C Obsolescence.
Systems Solution Marketing Group Industrial Automation Business Headquarters Yokogawa Electric Corporation ISD-MASP-S05011 Copyright © Yokogawa Electric.
Utility Engineers, PC.  Generation  Transmission  Distribution.
1 Review of Specifications for Digital Upgrades NHUG Summer Meeting July 17, 2008 Tim Mitchell Component Engineering Palo Verde Nuclear Generating Station.
Introduction to Energy Management. Week/Lesson 12 Advanced Technology for Effective Facility Control.
© 2014 IBM Corporation Does your Cloud have a Silver Lining ? The adoption of Cloud in Grid Operations of Electric Distribution Utilities Kieran McLoughlin.
NERC Lessons Learned Summary LLs Published in September 2015.
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
"... To design the control system that effectively matches the plant requires an understanding of the plant rivaling that of the plant's designers, operators,
> AREVA NP GmbH < AREVA NP. > AREVA NP GmbH < AREVA NP Electrical Protection for Diesel Generators in Nuclear Power Plants Dr. Plamen Watschkow AREVA.
1 © 2015 Eaton. All Rights Reserved.. Suggestion on How to Use Industry Trainers are encouraged to use this material in their sessions Download the presentation.
I & C.
IAEA International Atomic Energy Agency New IAEA Safety Guide (information) Human Factor Engineering for NPP (DS492) Alexander Duchac SAS,NSNI.
Safety Assessment of General Design Aspects of NPPs (Part 2) IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information.
Teknologi Pusat Data 12 Data Center Site Infrastructure Tier Standard: Topology Ida Nurhaida, ST., MT. FASILKOM Teknik Informatika.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
Utilities & Engineering Department16 Blossom St., Boston Introduction to the Hospital Emergency Power Supply System (EPSS) Jason D'Antona,
© 2013 Eaton Corporation. All rights reserved. This is a photographic template – your photograph should fit precisely within this rectangle. Eaton Power.
An overview of I&C Systems in APR 1400 Parvaiz Ahmed Khand December 28, 2007.
A DSP based on on-line UPS R.Padamaja G.Mamatha Reddy EEE EEE S.V.C.E S.V.C.E BY.
WIRELESS FIRE DETECTION
Fault Tolerant [I/o] Networks Applied to ship control
B. Rouben McMaster University EP 4P03/6P Jan-Apr
Engine Control Systems
Dept. of Nuclear and Quantum Engineering
Who We Are BlueI provides a holistic management system for water quality By providing a total water analytics solutions along side with state of the art.
Grid Stability and Safety Issues Associated With Nuclear Power Plants
Knowing When to Stop: An Examination of Methods to Minimize the False Negative Risk of Automated Abort Triggers RAM XI Training Summit October 2018 Patrick.
Ola Ingemansson Electrical & Instrumentation Engineer
Operation of Target Safety System (TSS)
Presentation transcript:

Electrical, Control and Information Systems in the Enhanced CANDU 6 ® Electrical, Control and Information Systems in the Enhanced CANDU 6 ® Candu – Official Use Only By Sunil Tikku, presented by Jerry Hopwood SIEN Bucharest, October 2011

Outline Introduction to the Enhanced CANDU 6 I&C design philosophy and architecture –Basic principles and architecture –Drivers for design changes Specific I&C enhancements –Electrical system enhancements –Control room enhancements –Control & Safety system enhancements –Operational support systems (OSS) Generic engineering programs Summary © Copyright 2011, AECL

I&C Architecture © Copyright 2011, AECL

Drivers for EC&I Enhancements compliance with new and more stringent licensing requirements improvements to enhance plant safety margins improvements to address customer feedback improvements for higher plant performance, reduced capital costs and more economic life-cycle operation Compliance to international I&C standards changes to address obsolescence other opportunities for improvement © Copyright 2011, AECL

Electrical Power System Enhancements Each unit has dedicated pair of redundant standby generators with auto start Seismically qualified uninterruptible power supplies (UPSs) added with automatic start-up of essential loads Manual tie-in circuit breakers between the redundant buses of the two units to enhance availability © Copyright 2011, AECL

EC6 MCR Enhancements Similar to C6 panel layout (some improvements) Preserves “operate at panel” philosophy Incorporates advantages of digital systems Avoids over-reliance on complex software Centralized operator console provides monitoring, test and supervisory support functions Digital device controls (where appropriate) Computerized safety system testing © Copyright 2011, AECL

EC6 MCR Enhancements (2) Seismically qualified MCR Computerized and seismically qualified Safety Monitoring System (includes PAM, h/w back-ups) Advanced alarm annunciation with h/w back-ups Computer based procedures (including safety system testing, EOPs) © Copyright 2011, AECL

Digital Safety Systems SDS 1 &2 remain independent and diverse: –fully separate and diverse voting, actuation and shut-down mechanisms –each employs triplicated computerized trip channels –both on new digital platforms (diverse design) –two out of three voting logic in each SDS –adding digital neutronics trips –adding two faster rate trips on each SDS Digital emergency core cooling system (ECC) Digital emergency heat removal system (EHRS) Containment systems remain as relay logic © Copyright 2011, AECL

Reactor Instrumentation Enhancements Adding more in-core flux detectors Additional SDS 2 in-core detectors in lower core (eliminates difference compensation) Replacing ion chambers with fission chambers –Eliminate lead shielding (reduced seismic load) –Improved detector range –Reduced reliance on start-up instrumentation Adding fission chambers on both sides of core for both shut-down systems

Control System Enhancements Modern DCS technology to replace Digital Control Computers (DCCs) –Design for safety, reliability, and maintenance –Tighter integration of device and group control –Separate mitigating controller (credited class 2) –Increased use of local controllers –Reduction in wiring and signal marshalling –Separate Fuel-Handling DCS & display system –Separate digital Fuel-Handling protective system © Copyright 2011, AECL

Display System Enhancements Safety qualified display systems (ACCIS ® platform) Supervisory functions in Plant Display System (PDS) Use of local panel displays (touch panel VDUs and display-only VDUs) Advanced alarm annunciation (intelligent alarm conditioning and management) Robust PDS system architecture Design for safety, maintainability and reliability

Operational Support Systems Plant information systems to help meet plant performance targets (94% annual capacity factor, 1% forced loss rate) Increased equipment and system health monitoring –Single points of vulnerability (SPV) and critical components –Smart CANDU ® applications Provision of online safety/reliability monitors Provision of an equipment status monitor (ESM) Provision of an historical data system (HDS) Improved data exchange and integration, plant configuration management

EC&I Enhancements for Severe Accidents Dedicated diesel generator / batteries and power distribution system to handle severe accident recovery and heat removal Monitoring to deal with SA available in both MCR and SCA (in form of hardwired and computerized safety parameter display) All related instrumentation evaluated / enhanced to cover the measurement ranges expected for SA Instrumentation assessed for layout and power source considerations for post SA effectiveness Instrumentation EQ’ed and assessed for survivability under SA conditions © Copyright 2011, AECL

Generic Engineering Programs These are applied to the design of all or many plant systems and include: –Increased use of simulation (“EC6Sim” Dynamic Simulator for design assist, plant dynamics, Anticipated Operation Occurrence analysis etc.) –Functional MCR mock-up facility –IEC standards for I&C system life cycle design –Human factors engineering program –Operating experience feedback program –Equipment qualification (EQ) program –Integrated cyber security program © Copyright 2011, AECL

Summary EC6 builds on proven success of CANDU 6 Design to meet or exceed current new build requirements EC&I enhancements provide improvements: –in safety margin –in plant performance –to address OPEX and customer feedback issues –in life-cycle cost reduction (improved maintainability, reliability, reduced obsolescence issues)