Www.myronzucker.com 2008 DTE/ESD Energy Conference and Exhibition Energy Efficiency Implementation Case Study Power Factor Correction Case Study -Power.

Slides:



Advertisements
Similar presentations
“Power Factor” In Transmission System
Advertisements

Energy Conservation Energy Management.
ALPHA POWER SOLUTIONS Presented by Eric Solot An Introduction to Power Factor Correction.
POWER FACTOR IN ELECTRICAL ENERGY MANAGEMENT
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
QUALITY AND TECHNOLOGY
Sistan & Balouchestan Electric Power Distribution Company
COST EFFECTIVE SOLUTION TO REDUCING YOUR ENERGY BILL’S POWER MASTER Power Master, LLC, 2040 E. Ridge Rd, Rochester, NY, 14622,
Electrical Systems.  This section discusses: –How utilities charge for electricity –How to calculate the avoided cost of electricity –How to use utility.
Energy Savings Through Power Factor Correction
KW Energy Solutions, LLC Increasing Energy Efficiency Increasing Energy Effectiveness.
The Bottom Line In Energy Cost Reduction Energy Automation Systems, Inc. EASI.
1 Northeast Public Power Association Electric Utility Basics Electric Rates and Cost of Service Studies.
Electrical Billing and Rates MAE406 Energy Conservation in Industry Stephen Terry.
KW Sentry ® Energy Controller (EC) It is a Desired & a Simple Solution for… RISING ENERGY COSTS It is a Desired & a Simple Solution for… RISING ENERGY.
Bryan Underwood Advisor: Prof. Gutschlag Alternating Current Power Factor Monitoring and Correction.
Power Factor and Power Factor Correction
What is power factor? Measurement and correction of power factor Dis-advantages of low power factor Advantages of power factor correction Outline:- Lecturer:-
Power Factor Correction KW KVA KVAR. Reasons behind P.F corrections n Power Factor is the ratio between Power and Apparent Power n Motors.
AC POWER ANALYSIS Tunku Muhammad Nizar Bin Tunku Mansur
Power Factor: What Is It and Estimating Its Cost Presented by:Marc Tye, P.E APPA Business & Financial Conference September 21, 2004.
Example 10.6 Calculating Power in Parallel Loads
1 Training Session on Energy Equipment Electricity Presentation from the “Energy Efficiency Guide for Industry in Asia” ©
Plant Utility System (TKK-2210)
Utility Analysis. Baseline Electricity Analysis  Understanding and documenting current energy use is called developing a baseline. Developing a baseline:
RETAIL RATE REVISIONS August 1, 2015 Presented By:
Circuits II EE221 Unit 4 Instructor: Kevin D. Donohue Complex Power, Power Conservation, Power Factor Correction, and Applications.
PowerGUARD Energy Saving for inductive loads Saving 8%-15% Protection Power Quality.
1 Training Session on Energy Equipment Electrical Systems Presentation to Energy Efficiency Guide for Industry in Asia Chapter 1 © UNEP GERIAP Electrical.
Power Utilities in the Telecom Business in the USA: Past Failures and Future Trends Mike Oldak Vice President & General Counsel Utilities Telecom Council.
American Control Technologies,Inc Power Factor Correction Technology 1152 West 2400 South Suite ‘C’ Salt Lake City, Utah
Technical Presentation on the new Power Saving Unit (PSU) Introduced By View Power.
Utility Savings Bill McGroarty Suburban Electric Supply Co.
POWER FACTOR CORRECTION
NH Utilities Programs/ Carbon Reduction Opportunities Thomas Palma, Esq., CSDP Project Development Executive.
Facilities Management and Design
Tubas ELECTRICAL NETWORK STUDY Prepared by : Omar Abu-Omar Ahmad Nerat Sameed banifadel PRESENTATION TO: Dr.MAHER KHAMASH.
Chapter 7 AC Power Analysis
Circuits II EE221 Unit 11 Instructor: Kevin D. Donohue Complex Power, Power Conservation, Power Factor Correction, and Applications.
Circuit Master Circuit Master™ uses three PROVEN technologies* – Capacitor (reduces DEMAND) – Harmonic Filter (harmful frequencies) – Surge Protection.
The EnergyMizer Power Reduction & Conditioning System ®
Management and Organisation of Electricity Use Electrical System Optimisation Belgrade November 2003.
1 11/17/2015 Power Quality Correction. 2 11/17/2015 Power Quality Correction.
Talha Mehmood Chapter # 5 TARIFF. Introduction The electrical energy produced by a power station is delivered to a large number of consumers. The supply.
AC POWER ANALYSIS. 2 Content Average Power Maximum Average Power Transfer Complex Power Power Factor Correction.
REACTIVE POWER COMPENSATION
Lecture 32Electro Mechanical System1 Assignment 10 Page 396 Problems 17-9, 17-14, and Due Date: Thursday 28 th April, 2011 Quiz No.5 Next Week Quiz.
Lack of dedicated building meter – Solution: Estimate square footage of Herberger in relation to total area serviced by meter – Estimate 12% of total.
Presented by. What is Power Factor? Power Factor is the percentage of current delivered from the utility that is needed to perform the actual work. For.
E ASI The E ASI Approach Reduces Electric Energy Usage Improves Power Quality Dr. Paul Bleiweis, CEO & President Kevin Malone, Director of Business Development.
FUNDAMENTAL OF ELECTRICAL POWER SYSTEMS (EE 270)
2015 ElectriCities Advanced Meter School. Rate Design Goals The two primary goals of rate design are to (a)provide rates that lead to utility revenues.
Power Factor Correction
1 March 2001 EPCOS FK PM PFC Basics of Power Factor Correction BASICS OF POWER FACTOR CORRECTION.
Advanced Meter School August 18-20,2015 Time of Use and Load Profile Jeremiah Swann.
PMC-592 HMI's Front Panel Operation
POWER FACTOR CORRECTION
Power Generation and Distribution
Power Factor Correction The Definitive power solution
Power Factor Correction The Definitive power solution
Effects of Harmonics on Capacitors Electrical System
APFC-03 Reactive Power Compensation Method & Settings
POWER FACTOR CORRECTION
Houston Power Services Company
Why does power factor matter Make-up of distribution capacitor banks
Tubas ELECTRICAL NETWORK STUDY
Sr. Lecturer in Electrical Engg. Govt. Polytechnic,Manesar
Energy Management PPKSE 06/07 SAA.
Presentation transcript:

DTE/ESD Energy Conference and Exhibition Energy Efficiency Implementation Case Study Power Factor Correction Case Study -Power Overview - Power Factor Penalties -Case Study May 6, 2008

What is Power Factor Power Factor is a measure of how effectively power is used Active Power Reactive Power Apparent Power Active Power – Performs the work Inductive loads require two types of power to operate: Reactive Power – Maintains the electro-magnetic field Apparent Power – Vector sum of Active and Reactive power

θ Active Power Apparent Power Reactive Power Power factor is the ratio of active power to apparent power What is Power Factor Vector summing power kW kVAr kVA kW kVA = pfcos θ = pf kW kVAr = θ arctan 90˚ Power factor is the ratio of kW to kVA

What is Power Factor Perfect Power Factor kW kVAr kVA kW kVA = 1cos 0 = 1 kW 0 = 0 arctan kVAr = 0 θ Unity Good Power Factor = 0< 32˚ >.85cos θ >.85 kW kVAr < 32 Poor Power Factor kVAkVAr <.85cos θ <.85 > 32˚ > 32 No Penalty Penalty The Difference

Power FactorPenalty.850 and higherNone.800 to.8491%.750 to.7992%.700 to.7493% <.70025% Penalty is applied to all metered quantities Power Factor less than.700 is not permitted and corrective equipment must be installed. 25% penalty applied after two consecutives months below.700 Example of DTE penalty rates (issued January 1994) Power Factor Penalty

Power Factor Penalty The Utility CompanyYour Facility The Mechanics of Power = kW = kVAr

400 kW 300 kVAr Power Factor Penalty 500 kVA Power Factor =.80 1% Penalty The Utility Your Facility The Mechanics Without CapacitorsThe Mechanics With Capacitors 100 kVAr 200 kVAr 447 kVA Power Factor =.89 Your Capacitor Bank Catches and stores the kVAr before it gets back on to the utilities grid

Charges for 03/22/2008 through 04/19/2008 Power Supply Charges: Power Supply 10.93(See 1 Above) 11, Power Supply Energy: Power Supply Total KWH 15, Off-Peak Surcharges: Regulatory Asset Recovery Total KWH Power Supply Cost Recovery Total KWH 5, Sub Total: 32, Delivery Charges: Service Charge Distribution: Distribution Demand A Above) 4, Distribution Energy Total KWH 4, Surcharges: Nuclear Total KWH U Rate Reduction Total KWH-1, Securitization Bond Total KWH 2, Securitization Bond Tax Total KWH Choice Implementation Total KWH Sub Total: 12, Invoice Subtotal 44, % Power Factor Penalty Based On Power Factor 1, Power Factor Penalty Example of DTE Utility Bill

kWH = 1,235,920 kVAH = 1,656,668 Detail Charges For Service at: xxxxxx Outage Contact Number:xxxxxx Invoice: xxxxxxBilling Period: 03/22/2008 through 04/19/2008Days Billed: 29 Metering Information Meter Number Start Date Start Read Stop Date Stop Read Read Difference Units Multiplier Usage UsedType xxxxxxx03/221,932.0A04/192,129.0A197.05, ,103,200.0P-KVARH xxxxxxx03/222,297.3A04/192,518.0A220.75, ,235,920.0P-KWH Total KVARH1,103,200.0 Total KWH1,235,920.0 kW kVA =.746 kWH = 1,235,920 kVARH = 1,103,200 Example of DTE Utility Bill Power Factor Penalty

Sizing Power Factor Capacitors

Sizing Power Factor Capacitors Billing Status Information 1On-peak Billing Demand1,080KW ESTABLISHED03/22/200811:30 365% High OP Bill Dmd June-Oct prec 11 mths702KW ESTABLISHED09/21/200711:30 6Rate Minimum Demand (Site)50KW ESTABLISHED01/22/199400:00 8Highest Single Billing Demand1,080KW ESTABLISHED03/22/200800:30 ACurrent PV High Monthly Demand1,080KW ESTABLISHED03/22/200800:30 B50% of the Contract Capacity for PV540KW ESTABLISHED05/19/200722:30 CPrimary Voltage Maximum Demand1,080KW ESTABLISHED03/22/200800:30 WCoincidental Max Onpk KW Dmd at Site1,080KW ESTABLISHED03/22/200811:30 Primary Voltage Maximum OnPeak Demand Reactive Demand0KVAR Percent Change56PCT Avg Kilowatthours Used Per Day A year Ago144,406KWH Power Factor (ratio) for all voltage74PCT Total Number of days in the Billing Period29DAYS Excess KVAR for PF less than.80KVAR Contract Capacty for Location1,080KW ESTABLISHED02/20/200700:00 Avg Kilowatthours Used Per Day This Period22,519KWH (KVAR) Coincidental Max Demand at Site0KVAR Avg Kilowatthours Used Per Day This Period22,519 KWH Average kW = 22,519 / 24 = * = 373 or 375 kVAR required to improve power factor from.75 to.90 kVA = 1,257 kW = 938 kVAr = 837 θ Desired Power Factor (%) Original Power Factor (%)

Information Required to Size and Locate Capacitors 12 months of electrical utility bills Electrical layout of facility –Motor location and sizes –Transformer sizes Variable Frequency / Speed Drives Harmonic study Sizing Power Factor Capacitors

Case Study Oaks Correctional Facility Manistee, Michigan 4 housing units; 4 large buildings which include food services, health care, recreation, maintenance, warehouse storage, administrative offices. HVAC, compressors, lighting, hydraulic motors Poor power factor $650 average power factor penalty/month

Case Study Oaks Correctional Facility Solution for Oaks Correctional Facility 320 kVAr was calculated for facility to reach the target power factor 30 kVAr installed at the switchgear in each of the 4 housing units 50 kVAr capacitor installed at the switchgear in each large building Total cost of capacitors: $6000 Penalty eliminated plus rebate of $200/month = $850 savings/month Payback of less than one year achieved, even considering installation costs.

Benefits of Improving Power Factor Elimination of Power Factor Penalties Where applicable Increase Capacity in Electrical System Reduction of I 2 R Losses When capacitors are located close to inductive load Up to 4% savings for that load Improves Voltage on System

Capacitor Tolerances –United States: IEEE Capability –Line to Neutral 110% Continuous –Line to Line120% Continuous –Current180% Continuous –Var Output135% Continuous –Europe: CE Standards call for 8 hour period Remember that these standards are Recommendations, not Code, and can therefore be ignored by manufacturers Power Factor Capacitors

Electric Power Research Institute (EPRI) “You can only save energy that is wasted” Infrastructure (system) losses generally 1-4% Includes I 2 R losses (Line Losses) Beware of large energy saving claims where capacitor are used Claims of large savings on your “losses” is NOT equal to large savings on your entire energy bill. A claim of 15% savings on energy “losses” at a facility with 2% line losses would total at most a.3% savings on the entire energy bill. (e.g. 15% x 2% = 0.3%) Power Factor Capacitors