Testing Newly-Approved Technologies: Challenges and Solutions Mitchell Lazarus 703-812-0440 | April 10, 2014 Testing Newly-Approved.

Slides:



Advertisements
Similar presentations
Broadband Over Power Line National Telecommunications and Information Administration U.S. Department of Commerce May 25, 2005.
Advertisements

FCC Actions To Support Development of WISPS Julius P. Knapp Deputy Chief Office of Engineering and Technology Federal Communications Commission.
Introduction to Ultra WideBand Systems
Millimeter Wave Regulation IEEE EMC – DC/No. VA Mitchell Lazarus | January 31, 2012 Millimeter Wave Regulation IEEE EMC.
American Certification Body - Your Online Resource for Regulatory Training 1588 ENERGYSTAR®
Protecting RNSS Spectrum Domestic and International Activities Karl B. Nebbia Associate Administrator Office of Spectrum Management National Telecommunications.
August 8, 2005USCEL - August FCC Update William Hurst Chief, Technical Research Branch Federal Communications Commission Office of Engineering and.
SCIP Conference Austin, Texas August 24, Migrating to Narrowband On July 2, 1991, The Commission released a Notice of Inquiry to gather information.
MOTOROLA and the Stylized M Logo are registered in the US Patent and Trademark Office. All other product or service names are the property of their respective.
Upcoming FCC Spectrum Auctions Bryan N. Tramont Wilkinson Barker Knauer, LLP
Slide 0 National Spectrum Managers Association Unlicensed Devices – An Update Mitchell Lazarus May 22, |
Doc.: 18-12/002r2 Submission January 2012 John Notor, Notor ResearchSlide 1 RR-TAG Opening Report Notice: This document has been prepared to assist IEEE.
Field Strength Measurements Relative to ARRL Concerns Regarding BPL October 16, 2003 Steve Martin Technical Research Branch Federal Communications Commission.
Possible Impact of VDSL on Stations Operating in the Amateur Radio Service Ed Hare, W1RFI ARRL Laboratory Manager 225 Main St Newington,CT 06111
Broadband over Power Line ARRL Statement Paul L Rinaldo Chief Technology Officer American Radio Relay League Tel: , Fax:
For the Public Safety Community
Current Issues Affecting Fixed Wireless: An Update on FWCC Activities National Spectrum Management Association Cheng-yi Liu |
Joint Industry Canada/RABC Stakeholder Discussion - Ottawa, ON
BPL Regulations for Access Networks  CURRENT’s Experience.
FCC Equipment Certification / Verification / Declaration of Conformity: What They Are & What Needs Work National Spectrum Management Association Mitchell.
Wireless Broadband Service in Rural America Rural TeleCon ‘06 October 24, 2006 Paul D’Ari Spectrum Competition and Policy Division Federal Communications.
July 2005 Gregg Levin, BridgeWave Communications Slide 1 doc.: IEEE /433/r0 Submission Project: IEEE P Working Group for Wireless Personal.
Slide 0 Spectrum on a Budget E DUCAUSE October 9, 2006 Mitchell Lazarus | |
Washington Laboratories (301) web: Lindbergh Dr. Gaithersburg, MD Desert William H. Graff President and Director of Engineering,
Doc.: IEEE /1119r0 Submission November 2005 Alistair Buttar, MotorolaSlide 1 Support for Emergency Calls Notice: This document has been prepared.
Regulatory Impact on Deployment in the United States - or - Non-commercial deployment of un- licensed radio networks will be more successful than.
Overview of Service Rules and Due Diligence Dwain Livingston Senior Engineer Mobility Division, WTB November 1, – 1990 MHz BROADBAND PCS Auction.
Doc.: IEEE /013r0 Submission March 2003 Carl R. Stevenson, Agere Systems RR-TAG Opening Report Report on January Interim Meeting Report.
A View from the FCC’s Office of Engineering & Technology NSMA Spectrum 2008 May 21, 2008 Julius P. Knapp Chief Office of Engineering and Technology Federal.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco PublicPresentation_ID 1 Look at the FCC 700 MHz band Requirements David A. Case NCE, NCT Cisco Systems.
1 IEEE Power Engineering Society General Meeting Denver, Colorado June 7, 2004 Paul S. Henry AT&T Laboratories – Research Interference and its Mitigation.
24/03/2003Jacques MdM / REF France1 HF Receivers desensitisation from wideband noise spurious in HF bands (1.8 to 30 MHZ) Impact of spurious radiations.
Spectrum Issues: Ultra-Wideband Operations May 20, 2003 Holiday Inn Hotel Rosslyn, VA James E. Hollansworth NASA Glenn Research Center NASA Spectrum Managers.
Examining the pitfalls of Power Line Telecommunication (PLT) Hans van de Groenendaal South African Radio League.
Millimeter Wave Regulation IEEE EMC – DC/No. VA Mitchell Lazarus | January 31, 2012 Millimeter Wave Regulation IEEE EMC.
Doc.: IEEE /0023r0 Submission May 2009 Rich Kennedy, Research In MotionSlide 1 TV White Spaces Regulatory History Date: Authors:
Intelligent Transportation Systems © 3M 2001 Presentation of 3M Company for the Special Meeting of the IRAC on GPS Repeaters October 28, 2005 by Harold.
1 ITU–R Task Group 1/8 The Bush Administration’s Commitment to Implementing New Technologies Michael D. Gallagher Assistant Secretary for Communications.
Doc.: 18-12/108r0 Submission October 26, 2012 Slide 1 FCC TV Band Incentive Auction: Impact on Unlicensed Operation Notice: This document has been prepared.
Slide 0 National Spectrum Managers Association Industry Round Table: Fixed Service Mitchell Lazarus | May 22, 2007.
Technician License Course Chapter 2 Lesson Plan Module 3 – Modulation and Bandwidth.
Overview of Service Rules and Due Diligence Keith Harper Electronics Engineer Mobility Division, WTB March 7, 2007 BROADBAND PCS Auction No. 71 Seminar.
Technical Issues, Due Diligence and Licensing Parameters Keith Harper Engineer Mobility Division, WTB June 10, 2008 Auction 78 Seminar BROADBAND PCS.
1 WiMAX and the Canadian Radio Spectrum April 28, 2006 Angela Choi Communications Engineer Pacific Region Industry Canada
Using License Exempt Spectrum for Wireless Broadband Ronald Repasi, Deputy Chief Office of Engineering and Technology Regional Educational Workshop On.
Risk Analysis in Spectrum Policy Julius Knapp Chief, Office of Engineering and Technology U.S. Federal Communications Commission Silicon Flatirons Center.
0 Slide 0 National Spectrum Managers Association Industry Round Table – Fixed Wireless Service May 20, 2008 Mitchell Lazarus | |
1 FREQUENCY ALLOCATIONS and SHARING Ultra-wideband Technologies Presented to: National Spectrum Managers Association Spectrum Management 2002 May 22, 2002.
1 ITU–R Task Group 1/8 “Bush Administration’s Commitment to Responsible Development and Deployment of Ultra Wideband” Michael D. Gallagher Acting Assistant.
0 Slide 0 Evolving Methods of Controlling Interference National Spectrum Managers Association May 19, 2004 Mitchell Lazarus | |
14 March 2002Update on SDoC - USA1 Update on Supplier’s Declaration of Conformity – USA William Hurst Federal Communications Commission Office of Engineering.
Doc.: IEEE /0077r2 Submission January 2009 Peter Ecclesine, Cisco SystemsSlide 1 TV white space update 1 Date: Authors:
Spectrum Sharing in 3.5 GHz Band
Doc.: IEEE /254 Submission May 2001 Chris Heegard, TISlide 1 Great News from the FCC for IEEE Task Group G Chris Heegard, Ph.D. Home and.
Promoting Spectrum Access for Wireless Microphone Operations.
0 Slide 0 National Spectrum Managers Association Unlicensed Devices May 16, 2006 Mitchell Lazarus | |
Technology as a Policy Enabler
Operation of Radar Services in 76 – 81 GHz band
FCC Regulations for Spread Spectrum Devices
VDL Mode 3 Cosite Interference Testing Summary
Technician License Course Chapter 2
In-band interference effects on UWB
FCC Regulations and Multi-band Operation
Tutorial Introduction Section
April 24, Study Group 1 A Regulatory Framework for Use of TV Channels by Part 15 Devices John Notor, Cadence Design Systems, Inc.
Tutorial Introduction Section
SOURCE: TIA TITLE: Unlicensed Products and Services in Television White Spaces – TIA Regulatory Update AGENDA ITEM: GRSC4 5.7 Software Defined Radio and.
Federal Communications Commission
FCC Spectrum Management Topics
Presentation transcript:

Testing Newly-Approved Technologies: Challenges and Solutions Mitchell Lazarus | April 10, 2014 Testing Newly-Approved Technologies: Challenges and Solutions Mitchell Lazarus | April 10, 2014

Innovator’s Tasks 1.Invent device 2.Obtain FCC waiver or rule change  can entail substantial delay:  technical waiver takes about 2 years  technical rulemaking takes 2-5 years 3.Obtain FCC certification  can take several more months. 1

Delays Due to Testing  New technologies may require new compliance test procedures  Even after FCC settles on procedures:  FCC may want to try out procedures  labs and TCBs will consult with FCC on how procedures work  client may have last-minute design issues, e.g.:  needed test modes missing from device software  problems with out-of-band emissions  commercial labs may have to acquire equipment, train personnel  testing takes longer than for established technologies. 2

Consequences of Delay  technology becomes outdated  investors pull out  customers go elsewhere  key employees leave  businesses fail  people die. 3

Rulemakings for New Technologies  Outcomes apply to everyone  Legal processes are uniform  set by Administrative Procedure Act  public comment (nearly) always required  Test procedures usually considered along with technical rules  often topic of public comment  sometimes topic of vigorous dispute  Rulemaking examples … 4

Level Probing Radars – 1 5  Measure quantity of materials, liquid depth outdoors  wideband operation  traditional rules set limit on transmitted (downward) emissions  interference arises from scattered (horizontal) emissions difficult to measure reliably.

Level Probing Radars – 2  New rules require boresight measurement  seeking max. horizontal emissions of –41.3 dBm  boresight emissions limits exceed that level by 22–38 dB, depending on band 6  allows for losses due to scattering, etc.  Authorized in three bands: 5.925–7.25, 24.05–29,75–85 GHz  Rules took effect April 7  FCC lab issued detailed draft KDB.

Broadband over Power Line – 1  Communications over power distribution lines at MHz  regulated devices: couplers take signal off line, feed to premises  typically one coupler per 3-8 houses  only one coupler per several blocks works at one time  Compliance testing inherently difficult  FCC requires testing in situ: low signal, high noise  Detailed testing guidance in Report & Order  FCC engineers worked at manufacturers’ prototype houses. 7

Broadband over Power Line – 2  Amateur radio licensees and ARRL filed 6,000+ oppositions:  claimed power lines act as city-sized antennas  BPL providers argued that couplers act as isolated point sources  agreed to rules that turn down or turn off couplers that cause interference  Timetable:  Notice of Inquiry  NPRM  Report and Order (18 months after NOI)  Order on Reconsideration  first certification (22 months after R&O). 8

Broadband over Power Line – 3  Dispute throughout proceeding over extrapolation factor:  Amateur radio interests favored 20 dB/decade at all frequencies  challenged 40 dB/decade in U.S. Court of Appeals  court sent back to FCC for second look  FCC reaffirmed. 9 Frequency< 30 MHz> 30 MHz Distance30Meters10 Meters Extrapolation40 dB/decade20 dB/decade Implication Point source (1/r²) Line source (1/r)

Ultra-Wideband  Authorized low-emission signals over very wide bandwidth  eight types of devices; each has different rules  max emissions for any device in any band: –41.3 dBm/MHz  lower in some bands  Testing challenges  Class B digital emissions can exceed intentional emissions  FCC specified procedures to isolate digital emissions  GPS band emissions as low as –85.3 dBm  Timetable:  Notice of Inquiry  Notice of Proposed Rulemaking  First Report and Order (44 months after NOI)  first certification (5 months after R&O). 10

TV Band (“White Space”) Devices  Downside risk: interference to broadcast TV, other services  FCC proceeded with great caution:  multiple successive rule modifications  live field tests in multiple kinds of environments  highly detailed test procedures  initial roll-outs limited to small areas  live, public testing of candidate database managers  Timetable:  Dec. 2002: proceeding began  Dec. 2012: first large-scale roll-out (after 10 years)  so far only fixed devices have been certified. 11

Waivers for New Technologies  Process driven by waiver proponent  no required procedure; can vary  FCC usually seeks public comment  waiver initially applies only to company that asked for it  central issue is usually technical rules  FCC may not look at compliance testing until prompted by client (or TCB)  Examples … 12

Surveillance Robot – 1 13  Police surveillance robot  steered by remote control  transmits analog video back to controller  manufacturer sought MHz (federal radar & amateur)  dozens of police departments wrote to the FCC in support  amateurs strongly opposed  FCC authorized.

Surveillance Robot – 2  Timetable:  waiver requested  waiver granted (25 months after request)  certification granted (two months after waiver)  first licenses granted (21 months after certification)  Licensing delay due in part to challenges to certification … 14

Surveillance Robot – 3 15  First model had B/W video, no sound  measured bandwidth per required procedure: 100 kHz  Opponents: analog video is “inevitably on the order of 5.75 MHz”  demanded that certification be set aside  FCC retained certification, granted licenses (after delay).

Airport Body Scanners – 1 16  Uses fast sweep 24.25–30 GHz  sweep takes 5.2 microseconds (pauses for 2.6 microseconds)  sweep repeats twice for each of 192 antennas on vertical mast  mast sequence repeats for each of 210 rotating mast positions  complete scan uses 80,640 sweeps  takes less than 2 seconds (including mast rotation)  software processes reflections into image.

Airport Body Scanners – 2  Compliance issues:  Sec (c) requires measurement with sweep stopped  Sec (b) sets 20 dB peak-to-average limit  FCC waived both rules. 17

Airport Body Scanners – 3  Timetable:  waiver requested  waiver granted (24 months after request)  certification granted (18 days after waiver)  FCC allowed certification process to begin while waiver was pending  FCC conducted tests at Columbia lab  waiver order had detailed guidance on testing. 18

Conclusion  Delays are reduced when rulemaking or waiver order has clear guidance on testing  How labs and TCBs can help innovators:  if asked, become involved early  deal with the right person at the client (not the lawyer)  the client may not know what services they need; tell them  and may not know what information you need; ask them  be creative on test procedures  if guidance is needed, go to the FCC promptly  for novel questions, KDB may not be the best place to start  but if rules and procedures are clear, do not ask the FCC  Time is always critical. 19

20 Questions? Mitchell Lazarus |