Progress of the ILC and LCFI in 2007 ■ The International Linear Collider ■ LCFI ♦Sensor and readout developments ♦Mechanical studies ♦Vertexing algorithms.

Slides:



Advertisements
Similar presentations
Konstantin Stefanov, Rutherford Appleton Laboratory4 th ECFA-DESY Workshop, 1-4 April 2003p. 1 CCD-based Vertex Detector - LCFI status report Konstantin.
Advertisements

1 Konstantin Stefanov, CCLRC Rutherford Appleton Laboratory LCFI Status Report: Sensors for the ILC Konstantin Stefanov CCLRC Rutherford Appleton Laboratory.
Latest Developments from the CCD Front End LCWS 2005 Stanford Joel Goldstein, RAL for the LCFI Collaboration.
1 Konstantin Stefanov, CCLRC Rutherford Appleton Laboratory 1 26 September 2006 LCFI Status Report: Vertex Detector R&D Konstantin Stefanov CCLRC Rutherford.
LCFI Collaboration Status Report LCWS 2004 Paris Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, RAL.
Freiburg Seminar, Sept Sascha Caron Finding the Higgs or something else ideas to improve the discovery ideas to improve the discovery potential at.
F1 Contribution to ILC Vertex Detector Tobias Haas 23 Febuary 2005.
Development of an Active Pixel Sensor Vertex Detector H. Matis, F. Bieser, G. Rai, F. Retiere, S. Wurzel, H. Wieman, E. Yamamato, LBNL S. Kleinfelder,
1 ZVTOP algorithm (based on part of March ’04 Vienna talk) Overview Vertex finding with ZVTOP More details on the algorithm OO development plans Dave Jackson.
Recent developments with LCFI ■ Introduction – towards the ILC ■ Some international VXD developments ■ Progress with LCFI sensor development and testing.
Andrei Nomerotski 1 CCD-based Pixel Detectors by LCFI Andrei Nomerotski (U.Oxford) on behalf of LCFI collaboration Hiroshima2006, Carmel CA Outline  LCFI.
1 Konstantin Stefanov, Rutherford Appleton Laboratory 1 LCFI Status Report Konstantin Stefanov on behalf of LCFI CALICE UK Meeting, 27 March 2007  Introduction.
1 LCWS talks I Sat 19 March Tracking and Vertexing session: 09:00-09:15 Sonja Hillert (University of Oxford) Heavy Flavour ID and Quark Charge Measurement.
Sonja Hillert, University of Oxford 2005 International Linear Collider Workshop, Stanford, 19 th March 2005 p. 0 Heavy flavour ID and quark charge measurement.
LCFI A Vertex Detector for the International Linear Collider  International Linear Collider (ILC): consensus that ILC will be next major particle accelerator.
Vertex 2002, Kona, Hawaii S.Xella – Rutherford Appleton Laboratory A vertex detector for the next linear collider Stefania Xella on behalf of the LCFI.
Linear Collider Flavour Identification Collaboration: Case for Support ■ Introduction to the ILC and LCFI: ♦Physics at the ILC ♦LCFI physics studies ♦Sensor.
1 Ghost Trackers If there’s something strange (or charm or bottom) in your neighbourhood… Dave Jackson Oxford University / RAL LCFI Collaboration 28 th.
Konstantin Stefanov, CCLRC Rutherford Appleton Laboratory PPRP open session: LCFI, IoP, 8 th September Linear Collider Flavour Identification (LCFI)
A new idea of the vertex detector for ILC Y. Sugimoto Nov
Jornadas LIP, Dez P. Martins - CFTP-IST The NA60 Silicon Vertex Telescopes Dimuon measurements Dimuon measurements Vertex telescope used in: Vertex.
Steve Worm – LCFIDESY PRC - May 10, 2007 LCFI Collaboration Status Report Steve Worm Rutherford Appleton Laboratory for the Linear Collider Flavour Identification.
Nicolo de Groot, Rutherford Appleton LaboratoryDESY PRC, 7/8 May 2003p. 1 CCD-based Vertex Detector - LCFI status report Nicolo de Groot RAL/Bristol Conceptual.
Fine Pixel CCD Option for the ILC Vertex Detector
LCWS 2004, ParisSonja Hillert, University of Oxfordp. 1 Flavour tagging performance analysis for vertex detectors LCWS 2004, Paris Sonja Hillert (Oxford)
Sonja Hillert, University of Oxford 2005 International Linear Collider Workshop, Stanford, 20 th March 2005 p. 0 Heavy flavour ID and quark charge measurement.
D 0 Measurement in Cu+Cu Collisions at √s=200GeV at STAR using the Silicon Inner Tracker (SVT+SSD) Sarah LaPointe Wayne State University For the STAR Collaboration.
Steve Worm – LCFILCUK - April 13, 2007 LCFI Collaboration Status Report Steve Worm Rutherford Appleton Laboratory for the Linear Collider Flavour Identification.
LCFI Collaboration Status Report LCUK Meeting Oxford, 29/1/2004 Joel Goldstein for the LCFI Collaboration Bristol, Lancaster, Liverpool, Oxford, QMUL,
1 Digital Active Pixel Array (DAPA) for Vertex and Tracking Silicon Systems PROJECT G.Bashindzhagyan 1, N.Korotkova 1, R.Roeder 2, Chr.Schmidt 3, N.Sinev.
1 Realistic top Quark Reconstruction for Vertex Detector Optimisation Talini Pinto Jayawardena (RAL) Kristian Harder (RAL) LCFI Collaboration Meeting 23/09/08.
Silicon Sensors for Collider Physics from Physics Requirements to Vertex Tracking Detectors Marco Battaglia Lawrence Berkeley National Laboratory, University.
E. Devetak – CERN CLIC1 LCFI: vertexing and flavour-tagging Erik Devetak Oxford University CERN-CLIC Meeting 14/05/09 Vertexing Flavour Tagging Charge.
Development of an ASIC for reading out CCDS at the vertex detector of the International Linear Collider Presenter: Peter Murray ASIC Design Group Science.
Vertex Detector for GLD 3 Mar Y. Sugimoto KEK.
1 Konstantin Stefanov, CCLRC Rutherford Appleton Laboratory 1 ECFA 2006, Valencia LCFI Status Report: Vertex Detector R&D Konstantin Stefanov CCLRC Rutherford.
Fine Pixel CCD for ILC Vertex Detector ‘08 7/31 Y. Takubo (Tohoku U.) for ILC-FPCCD vertex group ILC vertex detector Fine Pixel CCD (FPCCD) Test-sample.
FPCCD option Yasuhiro Sugimoto 2012/5/24 ILD 1.
FPCCD Vertex detector 22 Dec Y. Sugimoto KEK.
Andrei Nomerotski 1 Andrei Nomerotski, University of Oxford for LCFI collaboration ILC VD Workshop, Menaggio, 23 April 2008 LCFI Report.
Konstantin Stefanov, CCLRC Rutherford Appleton Laboratory PPRP open session: LCFI, IoP, 8 th September Linear Collider Flavour Identification (LCFI)
LCFI meeting 19 th August 2008 TESTING OF CPR2A Mirek Havranek, Peter Murray, Konstantin Stefanov, Stephen Thomas.
26 Apr 2009Paul Dauncey1 Digital ECAL: Lecture 3 Paul Dauncey, Imperial College London.
Benchmarking Tracking & Vertexing Andrei Nomerotski (Oxford) SiD Tracking Meeting, 7 December 2007.
Report to LCFI Oversight Committee, January 2007 ■ Introduction – towards the ILC ■ Some international VXD developments ■ Progress with LCFI sensor development.
Jet Tagging Studies at TeV LC Tomáš Laštovička, University of Oxford Linear Collider Physics/Detector Meeting 14/9/2009 CERN.
1 Konstantin Stefanov, STFC Rutherford Appleton Laboratory 1 TILC08, Sendai, Japan A CCD Based Vertex Detector Konstantin Stefanov STFC Rutherford Appleton.
LCFI POsC, July 13, LCFI Project Oversight Committee Outline CCD Clock Drive (WP3/4) External Electronics (WP4) CCD Sensors (WP2) CCD Testing (WP5)
Custom mechanical sensor support (left and below) allows up to six sensors to be stacked at precise positions relative to each other in beam The e+e- international.
LCWS11 – Tracking Performance at CLIC_ILD/SiD Michael Hauschild - CERN, 27-Sep-2011, page 1 Tracking Performance in CLIC_ILD and CLIC_SiD e + e –  H +
1 Studies of Heavy Flavour Jet Tagging with ZVTOP in JAS3 Overview Jet flavour tagging in JAS3 Cosθ dependence Primary vertex momentum Use of neutral energy.
Steve Worm – LCFIDecember 16, Linear Collider Flavour Identification LCFI Collaboration Report P Allport 3, D Bailey 1, C Buttar 2, D Cussans 1,
1 Konstantin Stefanov, Rutherford Appleton Laboratory 1 LCWS2007 Progress with the CPCCD and the ISIS Konstantin Stefanov Rutherford Appleton Laboratory.
1 Konstantin Stefanov, STFC Rutherford Appleton Laboratory 1 Vertex 2007, Lake Placid A CCD Based Vertex Detector Konstantin Stefanov STFC Rutherford Appleton.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
P.F.Ermolov SVD-2 status and experimental program VHMP 16 April 2005 SVD-2 status and experimental program 1.SVD history 2.SVD-2 setup 3.Experiment characteristics.
Sonja Hillert, University of Oxford2 nd ECFA LC workshop, Durham, 1 st September 2004 p. 0 Recent results from R&D towards a vertex detector at the international.
The BTeV Pixel Detector and Trigger System Simon Kwan Fermilab P.O. Box 500, Batavia, IL 60510, USA BEACH2002, June 29, 2002 Vancouver, Canada.
Highlights from the VTX session Marc Winter & Massimo Caccia R&D reports: – DEPFET (M. Trimpl) – CCD (S. Hillert) – UK-CMOS (J.Velthuis) – Continental-CMOS.
Sonja Hillert, University of Oxford 2 nd ECFA LC workshop, Durham, 2 nd September 2004 p. 0 Recent results on vertex charge reconstruction Sonja Hillert.
Quark Matter 2002, July 18-24, Nantes, France Dimuon Production from Au-Au Collisions at Ming Xiong Liu Los Alamos National Laboratory (for the PHENIX.
Andrei Nomerotski 1 Andrei Nomerotski, University of Oxford for LCFI collaboration LCWS2008, 17 November 2008 Column Parallel CCD and Raw Charge Storage.
Andrei Nomerotski 1 Andrei Nomerotski, University of Oxford Ringberg Workshop, 8 April 2008 Pixels with Internal Storage: ISIS by LCFI.
LCFI Detector Overview
Requirements and Specifications for Si Pixels Sensors
First Testbeam results
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
LCFI Status Report: Sensors for the ILC
FPCCD Vertex Detector for ILC
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Presentation transcript:

Progress of the ILC and LCFI in 2007 ■ The International Linear Collider ■ LCFI ♦Sensor and readout developments ♦Mechanical studies ♦Vertexing algorithms ■ Summary

Why the ILC? Electron-positron collisions complement pp ■ pp → HX as expected in ATLAS detector at LHC: ■ e + e  → HZ as expected in LDC detector at ILC:

Why the ILC? ■ The ILC and its detectors will allow precise measurements of cross sections, masses, branching ratios... ■ E.g. Branching ratios of Higgs boson: ■ Requires quark flavour identification. ■ Contribute to understanding of mass, dark matter, structure of space-time... ■ E.g. effects of large extra dimensions on A LR = (  L –  R )/  tot as a function of cos  in process ■ Requires quark charge identification.

The International Linear Collider ■ ILC now (Reference Design Report). ■ Energy stability better than 0.1%. ■ Electron polarisation 80% (e + 30%). ■ Cost $4.9B + $1.8B + 13k person-years. ■ ILC design July 2006 (Vancouver LCWS) ■ √s = GeV, upgrade to 1 TeV. ■L ~ 2 x cm -2 s -1, i.e. 500 fb -1 in first 4 years.

Detector – ILD and its VXD

Column Parallel CCDs ■ Achieve necessary readout speed with CCDs using column parallel architecture: ■ Must drive image register at 50 MHz to readout in 50  s. ■ Conceptual “ladder” design:

■ CPC2 wafer (100  cm, 25 μm epi and 1.5 k  cm, 50 μm epi). ■ Low speed (single level metal) and high speed versions of sensors: ■ High speed (busline-free) devices, whole image area is distributed busline ■ Designed to reach 50 MHz. Capact. Struct.s CPC2-70 CPC2-40 CPC2-10 ISIS1 CPC2

Testing the CPCCD at high speed ■ CPC2-10 wire bonded to mother- board with transformer drive. ■ 55 Fe X-ray signals observed at up to 45 MHz. 55 Fe source removed X-ray hits 8

Steve Thomas/Peter Murray, RAL Readout chips – CPR1 and CPR2 ■ CPR2 designed for CPC2 using results from CPR1 tests. ■ Many test features. ■ ¼  m CMOS (IBM), 6 x 9.5 mm 2. Voltage and charge amplifiers 125 channels each Analogue test I/O Digital test I/O 5-bit flash ADCs on 20 μm pitch Cluster finding logic (2  2 kernel) Sparse readout circuitry FIFO

CPR2 bump-bonded to CPC2 – test results ■ E.g. of 55 Fe spectrum, map of chip: ■ Voltage channels work well at ~ 2 MHz, deterioration if f > 5 MHz. ■ Gain ~ 50% lower at centre of chip. ■ Noise around 60…80 e -. Tim Woolliscroft, Liverpool U Noise Peak Fe-55 Peak

CPR2 bump-bonded to CPC2 – test results ■ Parallel cluster finder, 2 x 2 kernel. ■ Global threshold. ■ If threshold exceeded, 4 x 9 pixels flagged for readout. ■ Cluster finding functions with X-ray data. ■ Dead time discovered, leads to loss of data if clusters close. ■ Range of improvements for CPR2A. ■ 3-fold increase in column memory (reduces dead time). ■ Column thresholds. ■ Analogue calibration circuit. ■ Submission due next month. Sparsified output Tim Woolliscroft, Liverpool U

Steve Thomas, Peter Murray, RAL Rui Gao, Andrei Nomerotski, Oxford U Clock driver for CPC2 – CPD1 ■ Chip designed to drive outer layer CPCCDs (130 nF/phase at 25 MHz) and innermost CPCCDs (40 nF/phase at 50 MHz). ■ Currents of 21 A/phase needed! ■ 0.35 mm CMOS, 3 x 8 mm 2. ■ Test shows CPD1 driving 32 nF equivalent internal load at 50 MHz. ■ Hope to achieve same performance with chip bump-bonded to CPCCD. 2 V pp differential clock

Bus-line free CPC2-10 with CPD1 ■ 55 Fe signal (1630 e - MIP like). ■ CPD1 clocks in range 3.3…1.2 V. ■ Noise 75 e - (c.f. 200 e - with transformer drive). ■ CPC2 works with clock amplitude down to 1.35 V pp. Konstantin Stefanov, RAL

Towards a prototype ladder ■ CPC2 with CPD1 driver chip and CPR2 readout chip: 1.5V PP Clocks CPR2 Voltage Amplifier output CPC Source follower output Tim Woolliscroft, Liverpool U

CPCCD capacitance reduction ■ CPCCD is difficult to clock because of large currents required. ■ Can we reduce capacitance? ■ Dominant contribution is inter-gate capacitance. ■ Several ideas for reducing this: pedestal gate CCD; shaped channel CCD; open phase CCD. ■ Studies also ongoing to understand minimum clock voltage needed to efficiently transfer charge in CCDs. ■ Test structures from e2v will be delivered in next few weeks. ■ Open phase CCD:

In-Situ Storage Image Sensor ■ Alternative to fast readout: store signal in pixel during bunch train. ■ Drive at 20 kHz during bunch train. ■ 1 MHz column parallel readout between bunch trains. ■ Charge to voltage conversion when least affected by EMI. ■ ISIS1, “proof of principle” device built by e2v. ■ 6  16 array of ISIS cells, each with 5-pixel buried channel CCD storage register. ■ Cell pitch 40  160 μm 2, no edge logic. ■ Chip size 6.5  6.5 mm 2.

ISIS1 tests ■ Tests with 55Fe source. ■ ISIS1 works well with and without p- well. ■ The p-well successfully prevents parasitic charge collection. ■ ISIS2 to be designed with and manufactured by Jazz Semiconductor. Konstantin Stefanov, RAL

ISIS1 in test beam ■ Telescope made of five ISIS1 sensors studied in test beam at DESY. ■ Set up started Mon...tracks seen Tues. ■ First prel. result, resolution in “short” direction 11  m (c.f. ).

Mechanical studies ■ Goal is 0.1% X 0 per ladder with operation at ~ 170 K. ■ Try foam supports: ■ Effect of temperature variations on Si-RVC sandwich: E. Johnson, J. Goldstein

Mechanical studies ■ Look at deviations with temperature: ■ Very good CTE match of Si and SiC ensures excellent temperature stability. ■ Investigate possibility of constructing entire VXD using SiC: ■ Many problems to solve, machining SiC, choice of adhesive, CTE effects...

Summary ■ Reference Design Report for ILC produced. ■ Good progress in understanding damping rings and reducing their cost. ■ Superconducting undulator prototypes designed, built and tested. ■ Target wheel prototype now awaiting test at Daresbury. ■ Studies for ILC Engineering Design Report now underway – ready ■ Further cost reductions being sought. ■ Strategy is to decide in 2010 whether ILC is correct next machine for HEP. ■ LCFI progress good. ■ Vertex package released and now basis of most worldwide flavour physics studies. ■ Column Parallel CCD operated at high speed. ■ Column Parallel Drive and Readout chips operated with CPCCD. ■ ISIS functions in Lab and at Test Beam. ■ Promising work on use of SiC foams for extremely light support structures. ■ Many reasons to be cheerful...

Guardian... ■ In praise of... Britain's astronomers and particle physicists Leader Monday December 17, 2007 Sir Isaac Newton and Edmund Halley would have been horrified. The great British physicist and his astronomer friend helped create a tradition of pioneering research that is being threatened to save a few million pounds. This month astronomers and particle physicists learned of a 25% cut in research spending - partly to cope with cost overruns on big projects and partly because the recent spending review was not generous. The cuts would force Britain's retreat from some of the world's leading research projects and the work of hundreds of scientists is at risk. ■ Among the schemes under threat are Britain's share of the International Linear Collider, intended to carry out research into the creation of the universe. Britain's part in the Gemini North telescope, on Mauna Kea in Hawaii, studying deep space, may survive in reduced form. But this country's role in its companion observatory in the southern hemisphere, based in Chile, will not. The board of the collaborative Gemini scheme issued a statement expressing its dismay at the news. So did a group of senior astronomers, writing to the Guardian. The new Science & Technology Facilities Council says that the cuts are necessary to fund big overruns in research projects in Britain, and it is true that modern astronomy and particle physics are among the most expensive areas of science. But primary research into the origins of the universe is something that this country is good at and should remain committed to.

Finding decay vertices using the vertex detector ■ E.g. ■ Vertex region: ■ Challenge is to associate all charged tracks with correct vertex in high track density environment.

Topological vertex reconstruction ■ Using VXD hits, tracks approximated as probability tubes, beam spot as ellipsoid, ■ E.g. N tracks, integrating over z, ■ From these define vertex function: ■ Returning to e.g.: ZVTOP, D Jackson

Topological vertex reconstruction ■ Find “seed” maxima in for track-track and vertex-track pairs which are “resolvable” and for which  2 good. ■ Search around seeds for true maxima in, including all tracks and vertex. ■ Spatially resolved maxima form candidate vertices if associated with 2 or more tracks. ■ Track/vertex association ambiguities are decided according to largest after quality cuts. ■ Vertex that includes the IP ellipsoid is primary vertex. ■ Use identified vertices as seeds to search for further vertices: ■ Tune cut on L/D to find new vertices, possibly “one prong”. ■ (Additional weighting factors can be applied to favour vertices near jet core, to suppress vertices v. close to IP etc.)

Ghost track algorithm ■ Complementary approach to vertex finding. ■ Start with straight “ghost” track at IP along jet axis direction. ■ Calculate χ 2 of DCA each track in jet to ghost track. ■ Swivel ghost track in θ and φ to minimise ∑χ 2 for all tracks in jet. ■ Now have N (tracks) + 1 (IP) initial vertex candidates. ■ Calculate fit probability for all track- ghost track or track-IP combinations. ■ If prob. high, combine objects to form vertex. ■ Iterate. IP N N Ghost PrimarySecondary Tertiary IP B D Ghost

Flavour identification ■ Identify variables that provide discrimination between uds/gluon and c and b jets. ■ E.g., if vertex found, p T corrected mass, m pT, is useful variable, ■ m pT distributions: p T vtx IP e+e+ ee b, c, uds

Flavour identification ■ Combine variables using neural net. ■ Input variables: ♦Momentum and impact parameter significance in r-  and z of two most significant tracks. ♦Probability in r-  and z that all tracks originate from IP. ■ Additionally, if secondary vertex found: ♦m pT. ♦Momentum associated with vertex. ♦Decay length. ♦Decay length significance. ■ Resulting flavour identification performance (here at √s = m Z ) using fast MC simulation. Full – LCFI (C++, Marlin) Open – Previous (Fortran) c (b-bkgr) b c E. Devetak, M. Grimes, S. Hillert, B. Jeffery

Quark charge identification ■ Assign all charged tracks to vertices using L/D. ■ Sum charge of tracks at secondary vertex to form Q sum : ■ Define Q vtx = sgn(Q sum ).

Quark charge identification ■ Quantify performance in terms of 0, probability of reconstructing neutral B hadron as charged. ■ Degradation at large cos  caused by loss of tracks and multiple scattering. ■ Effect stronger at lower jet energy (broader jets, lower momenta...)

Why the ILC? Electron-positron collisions complement pp ■ pp → HX as expected in ATLAS detector at LHC: ■ e + e  → HZ as expected in LDC detector at ILC:

Requirements on the ILC vertex detector ■ Identify quark flavour by measuring distance hadrons fly before decay. ■ Net charge of particles from vertices can give quark charge. ■ Point precision < 5  m needed. ■ Two track resolution < 40  m. ■ Pixels ~ 20 x 20  m 2 suffice. ■ Layer thickness < 0.1% X 0. ■ First measurement at r ~ 1.5 cm. ■ Need ~ 5 layers to allow pattern recognition. ■ Leads to vertex detector design: Measure c  ~ 100  m Multiple scattering Large number of tracks

Constraints on the vertex detector due to the ILC ■ Beamstrahlung... ■...results in production of ~ 5 hits/cm 2 each bunch crossing in inner layer (B = 4T, √s = 500 GeV). ■ Time structure of beam at √s ~ 500 Gev (~ 1 TeV): ■ Readout pixels 20 times in bunch train at √s = 500 Gev, i.e. ~ every 50  s, if want occupancy ~ 0.3%. ■ Radiation dose ~ 20 krad p.a. ■ Neutron background from interactions of e + and e  in beam dumps ~ MeV n/cm 2 p.a. ■ Electromagnetic interference generated by e + and e  beams. ■ Beam induced pick-up disabled the electronics of the SLD vertex detector for ~ 1  s after each bunch crossing. 337 (189) ns 2820 (4500) 0.2 s 0.95 ms ee e+e+

Mechanical studies ■ Develop techniques for measuring and machining foams, e.g. silicon carbide: ■ Measurements made using large diameter low force touch probe.

Mechanical studies ■ Also investigating other new ideas… S Yang