by S.A. Satish Kumar General Manager , DSM BESCOM

Slides:



Advertisements
Similar presentations
KEY CHALLENGES IN INDIA FOR ROOFTOP PV PROJECTS Nexus Energytech Pvt. Ltd. Arvind Karandikar
Advertisements

Solar PV system - financial assistance and incentives
Karnataka Renewable Energy Development Limited
Dr. Bader Eddin Al-Majali
By Sudhir K. Saxena Exe.Engg.Elect.Engg. Mgt/RB. Electricity consumption over Indian Railways for traction & non-traction.
Scheme of 1% Interest Subvention for Housing Loans upto Rs. 15 Lakh.
Queries raised by Director (Tariff) on ARR and Tariff Application of NESCO for FY on
EVOLVE INDIA SOLAR SOLAR FINANCE SOLAR B. O. O
GRID PARALLELED kWp ROOF TOP SOLAR PV SYSTEM AT AVANT-GARDE AVANT-GARDE.
Presentation on ELECTRICITY DISTRIBUTION LOSSES & CONCEPT OF AGGREGATE TECHNICAL AND COMMERCIAL (AT&C) LOSS R.V. Shahi Former Power Secretary, Govt.
It “Pays” to be Environment Friendly Renewable Energy Certificates: IPP Perspective.
Regulatory framework in the Energy Sector Chairman Ph.D. Tserenpurev Tudev Energy Regulatory Commission of Mongolia Energy Mongolia-2012 Ulaanbaatar Mongolia.
SBS.AZEEMUDDIN 10- Anjaneyar Koil Street 2nd Floor, Annai Flats, West Saidapet. Chennai Tamilnadu. Mobile:
Proposed APDRP during 11 th Plan  Continue APDRP during the XI Plan with the revised terms and conditions as a Central Sector Scheme.  The focus of.
1 VIABILITY OF SOLAR ENERGY BASED ELECTRICITY GRID- REGULATORY CHALLENGES AND OPPORTUNITIES Nigerian Electricity Regulatory Commission, Abuja Presentation.
Scaling Up Energy Efficiency in India
Funding for a brighter tomorrow 1 POWER SECTOR CONCLAVE 14th – July Avkash Saxena General Manager (APDRP) Power Finance Corporation Ltd. Restructured.
Initiatives on Solar Energy on Northern Railway By A. K. Singhal CEGE/NR 10th January’2015.
Solar Energy Policy in Andhra Pradesh (AP) M. Thimma Reddy People’s Monitoring Group on Electricity Regulation Jaipur – 29/11/2013.
Welcome and Introductions CoServ Presentation & Member Input.
CLEAN TECHNOLOGY. Any Product, Service And Process That Delivers Or Adds Value By Raising Productivity And Product Performance Using Limited Non Renewable.
1 Renewable Energy Options for the Indian Railways Amit Kumar TERI, New Delhi December 21, 2011.
You currently have no control over ever rising electricity prices Electricity costs have doubled over the last 10 years* What will your electricity bill.
Solar Energy in Gujarat Some Aspects of Regulatory Decision-making Dr. P. K Mishra Chairman Gujarat Electricity Regulatory Commission Forum on Clean Energy,
Green Energy London Co-operative Inc. (GEL) May 9, 2013 What is GEL?
Lori Singleton Manager, Sustainability Initiatives and Technologies September 15, 2010 SRP’s Sustainability Initiatives and Programs.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
Karnataka Renewable Energy Development Limited
1 Energy Efficiency and Conservation in Thailand Department of Alternative Energy Development and Efficiency (DEDE) Ministry of Energy 6 th January 2005.
Energy & Environment Initiatives. 2 Technology Finance Group Supports demonstration projects & activities creating awareness The demonstration projects.
Loss Reduction and CDM at Gubbi Substation Energy Economy & Environmental Consultants Bangalore INDIA.
Contributions In-Aid and Development of Fees Utility Financial Solutions Mark Beauchamp, CPA, CMA, MBA President
Highlights of Commission Activities Little Rock ASHRAE Monthly Meeting October 12, 2011 Presented By: John P. Bethel.
Smart Grid - Developments and Implementations Prof. Gady Golan – HIT, Israel Dr. Yuval Beck – HIT, Israel , Electricity 2012, Eilat.
Solar-Powered Fuel Stations
Financing Renewable Energy: Mechanisms, Challenges & Risks By Ujjwal Bhattacharjee, PhD Senior Fellow, TERI Regional Workshop on Innovative and Sustainable.
1 Power – The Wind Way. 2 Windy Years India Currently holds a cumulative capacity of over 21000MW in India. Wind power growth in India has seen various.
How can we work better together? Panel discussion: How can we work better together?
Renewable Energy Policies: China’s Scale-Up Story Dr. Xiaodong Wang Senior Energy Specialist EASIN, the World Bank SDN Week, Energy Day February 23, 2012.
Input Demand: The Capital Market and the Investment Decision
Renewable Energy Policies of Germany and China Masood Ahmed CRER, SZABIST December 24’ 2009.
Indian Railways: Greening the tracks Achieving the 1 GW solar PV target Aditya Ramji Junior Research Associate Council on Energy, Environment and Water.
Feed-in-Tariffs Explained What is it all about? 23 rd February 2011 Edward Leddy-Owen Regional Microgeneration Coordinator Energy Saving Trust advice centre.
Presentation on solar rooftop Abhilakh Singh General Manager 9 th October, 2015.
11 Prabhakar Tandon Head Business Development Secure Meters Limited Distribution Reform-A different Approach.
Mafalu Lotolua PEAG Meeting, SPC, Suva, Fiji 16 th - 18 th November 2015 Tuvalu’s Progress on it’s Energy Master Plan Target
Philippine Feed-In Tariff System Implementation 1.
Electricity Sector April Electricity sector in perspective Electrification of households is one of Government’s priority programmes The country.
1 Teaching Innovation - Entrepreneurial - Global The Centre for Technology enabled Teaching & Learning, N Y S S, India DTEL DTEL (Department for Technology.
Indo-European Workshop on Solar Energy 21 April, 2011 IIT Jodhpur Policy, Regulatory & Financing Issues.
MERC (Net Metering for Rooftop Solar Systems) Regulations, 2015 One Day Workshop on Grid Connected Solar Roof-top Projects in Maharashtra by MEDA.
MERC (N ET METERING FOR R OOF - TOP S OLAR P HOTO V OLTAIC S YSTEMS ) R EGULATIONS, 2015 Commercial Section.
Registrations | Subsidies | Loans. Introduction Yashika Enterprises is a well-known name in Thane District (Mumbai). Established in 2011 We offer a very.
1 Implementation of Off-Grid Policy in the state of Maharashtra By H M Kulkarni General Manager (R.E) Maharashtra Energy Development Agency Date 17 th.
RENEWABLE ENERGY REGULATION IN KENYA KENYA-SPAIN MULTILATERAL PARTNERSHIP MEETING HELD AT CROWNE PLAZA Presented by Caroline Kimathi Asst Manager, Licensing.
INFORMATION AND COMMUNICATION TECHNOLOGY (ICT) POLICY 2014 DEPARTMENT OF INFORMATION TECHNOLOGY GOVERNMENT OF ODISHA.
Renewable energy support schemes in the Republic of Moldova
Incentives For Use Of Renewables
About CleanMax Solar Largest rooftop solar developer in India with ~25% all India market share All India presence with 5 offices and solar plants across.
Self-Generation Incentive Program (SGIP)
Hartek Group is one of India’s fastest growing company with offerings that span across Engineering, Renewables, Technology , Construction , Fuel and Manufacturing.
CURRENT STATUS - ENERGY TRANSITION
Analysis of Solar Power Policy, Karnataka.
Challenges in Financing Renewable Energy
Indian Grid Code and Commissioning Test Procedure Dr
Power Scenario, Renewable Energy and General Manager (SOLAR)
Renewable Energy In Egypt
Harnessing Renewable Energy Solar Mission of Indian Railways
Detail | Customise | Optimise
The Potential of Renewable Energy in Libya
Presentation transcript:

BESCOM Experience in promoting Effective Business Models for Solar Rooftop PV in India by S.A. Satish Kumar General Manager , DSM BESCOM at The Lalith, New Delhi on 08/04/2015

PREAMBLE Launching of JNNSM in January 2010 by GOI has opened the flood gate for Solar sector in India. Karnataka was the first southern state to introduce solar policy - I in 2011. First state to commission utility scale solar project in India. The state revised its solar policy on 22.05.2014 in order to add on capacity, and to have energy security and sustainability. State is blessed with 240 to 300 sunny days with good solar radiation of 5.4 to 6.2 kWh / mts /day. Assessment of solar potential  - 20 GWp. Moderated potential - 10 GWp State target -    3% of total energy consumption.

SOLAR POLICY 2014-2021

Objectives: Add solar generation of minimum 2000 MW by 2021 To Translate state into an investor friendly state To encourage PPP in the sector To promote SRTPV generation and technologies To encourage decentralized generation and distribution To promote R&D , Innovations and Skill development in sector.

Minimum targets proposed The Govt. proposes to achieve minimum of 3% of solar energy out of total energy consumed by installing solar plants in a phased manner as below: Segment 2014-15 2015 -16 2016 -17 2017 -18 2018 -19 2019-20 2020-21 Utility scale projects 350 150 Solar RTPV, grid connectivity 100 -

Utility scale grid connected SPV/CSP projects KREDL is the nodal agency for implementing the following projects. Category-1: Projects to promote distributed generation by land owning farmers throughout the state (1 to 3 MW). The capacity allocation for ESCOM is as below: ESCOMs % of total annual energy consumption Capacity fir the period 2014-20 BESCOM 48% 144 MW MESCOM 8% 24 MW HESCOM 20% 60 MW GESCOM 13% 39 MW CESC 11% 33 MW

Category-2 Projects selected based on competitive bidding process for capacities more than 3 MW. The minimum project capacity allocation to each solar power product for the grid connected solar power plants will be as follows: The capacity plant under this category exclude capacity under JNNSM program Mode of allotment Technology Minimum (MW) Through bidding process Solar PV 3 Solar Thermal 10

Category-3 Project under REC Mechanism. Under this mechanism solar energy generators can sell electricity to ESCOMs at APPPC (Average Pooled Power Purchase Cost) as determined by KERC. The minimum and maximum project capacity allocation to teach solar power producer for the grid connected solar power plants will be as follows: There is no limit for cumulative capacity under this category. Mode of allotment Technology Minimum (MW) Maximum (MW) Through ESCOM Solar PV 1 Based on transmission evacuation capacity Solar Thermal 10

Category-4 Projects under Captive/Group captive generation. The project developer is allowed to avail RECs in compliance with KERC regulations. The wheeling and banking charges and cross subsidy are as per KERC guidelines. The minimum and maximum project capacity allocation to teach solar power producer for the grid connected solar power plants will be as follows: There is no limit for cumulative capacity under this category. Mode of allotment Technology Minimum (MW) Maximum (MW) Through ESCOM Solar PV No limit Based on transmission evacuation capacity Solar Thermal

Category-5 Category - 5 Projects under Independent Power Producers. Power plants put up for sale of power to third party constitute this category. Projects under this category are not eligible for availing RECs. The minimum and maximum project capacity allocation to teach solar power producer for the grid connected solar power plants will be as follows: There is no limit for cumulative capacity under this category. Category-5 Mode of allotment Technology Minimum (MW) Maximum (MW) Through ESCOM Solar PV 1 Based on transmission evacuation capacity Solar Thermal 10

Category-6 Projects under Bundled power. State encourages providing solar power bundled with thermal power. The minimum and maximum project capacity allocation to teach solar power producer for the grid connected solar power plants will be as follows: Mode of allotment Technology Minimum (MW) Maximum (MW) Through ESCOM/ HLPAC Solar PV Based on bundled tariff as agreed with power purchaser Solar Thermal

Segment - 2:Grid connected solar rooftop projects and metering The Gok shall promote grid connected solar rooftop projects on public building, domestic, commercial and industrial establishments though net metring and gross metering methods based on tariff orders issued by KERC from time to time. Net metering: Net metering arrangements are proposed (at multiple voltage levels) to focus on self-consumption of energy generated from rooftop PV. The concept is a combination of captive consumption and exchange of power with the utility. For SRTPV system gird tied on a net basis, the surplus energy shall be paid as per tariff determined by KERC. Metering shall be compliance with the CEA. ESCOMS shall define specific guidelines on the standards for connectivity to network. MNRE subsidies shall be through the nodal agency. The Meter reading taken by ESCOMs shall form the basis for commercial settlement.

Site requirement & Inter connection voltage The project site/installation location decided based on roof space and usable area for installation of SRTPV. Approved export/import meter shall be installed for net metering purpose. Interconnection voltage: System Capacity Voltage Level Remarks Upto 5kWp 240 V/Single phase As per KERC guidelines 5 kWp to 50 kWp 3 phase/415 V >50kWp 11kV

Other Initiatives To amend building by laws in respect of FAR (Floor Area Ration) in co-ordination with BBMP/local bodies and urban development department to exempt FAR in respect of additional floor area created under solar PV panels with light roofing. Solar Off-grid and Decentralized Distributed Generation (DDG): To provide access to electricity where transmission and distribution systems are difficult to establish, solar powered off-grid solutions are encouraged. To encourage options like solar street lights (through local bodies), rooftop SPV systems with battery storage (through ESCOMs and NGO’s) and others in both rural and urban areas for the purpose of reducing dependency on grid. Focus on Solar powered IP sets: To provide energy security to farmers during day time use of solar power pumps is encouraged, as the energy consume by IP sets is 33% of total energy.

Other Initiatives Solar Park: Utilize waste land for development of solar park and for power generation. Promotion of distributed generation through small solar parks: Govt. to promote solar park with area less than 100 acres through PPT model with financial assistance of Rs.1 Cr. in the backward districts. Promotion of integrated solar parks: Private participation by providing “plug and play” options for developers. To create private land banks owned by farmers/group of farmers/ associations for development of solar projects and long terms lease upto 30 years. Grid tied canal corridor projects: Deployment of grid connected projects on canal corridor by water resources department on pilot basis subject to purchase of energy by ESCOMs. Grid connected “solar with other renewable hybrid projects”: To encourages such projects with minimum 25% of overall generation coming from respective generation sources shall be promoted through this policy.

Policy initiatives: To bring in all HT consumers with connected load of < 50 kVA under SPO (Solar Purchase Obligation). To amend section 95 of Land Reforms Act for deemed conversion of land for solar projects. To empower DCs to approve purchase of agricultural lands U/S 109 of Land Reforms Act for development of solar projects.

Implementation of Solar Rooftop Program in BESCOM Inauguration of SRTPV Program in the state by Energy minister of GoK on 07.11.2014

GENERAL Applications are invited form BESCOM consumers of all Residential, commercial, educational institutions, industries establishments others etc. No limitation on installed solar capacity Applications invited form minimum 1 kWp to maximum 1 MWp Applicant can select any system integrator & PV modules. To purchase BESCOM approved inverters & bi-directional meters only.

No. of application received online – 333 , 17MW Registered at sub division office- 215, 12 MW

List of important SRTPV installations Serviced on 06.04.2015 Chinnaswamy Stadium 400 kWp 2 St. Jones college 100 kWp 3 BESCOM, Corporate Office 50 kWp 4 Ramana Marshi school of Blind 34 kWp 5 Smt. Usha Shivakumar (Energy Minister) 18 kWp 6 NIAS 7 Others (Residential) 72 kWp Total 774 kWp

Return on Investment Calculation   How good is the investment in Solar Rooftop PV System ? 1-KW 2-KW 3-KW 4-KW 5-KW 6-KW 10-KW 1 Plant Capacity kWp 2 3 4 5 6 10 Energy Generated kWh/year 1500 3000 4500 6000 7500 9000 15000 Energy Consumed 1200 Energy Exported 300 1800 3300 4800 6300 7800 13800 Savings in BESCOM Bill Rs./year 4592 Cost of energy exported/year 2868 17208 31548 45888 60228 74568 131928 7 Cumulative Returns per Annum 7460 21800 36140 50480 64820 79160 136520 8 Principal Rs. 100000 200000 300000 400000 500000 540000 900000 9 SIMPLE PAYBACK PERIOD Years 13.4 9.2 8.3 7.9 7.7 6.8 6.6

  How Solar Rooftop PV System is a better investment than Fixed Deposit? 1-KW 2-KW 3-KW 4-KW 5-KW 6-KW 10-KW 1 Plant Capacity kWp 2 3 4 5 6 10 Cumulative Earnings from SRTPVS per Year Rs./yr 7460 21800 36140 50480 64820 79160 136520 Interest for Fixed deposit % 9 Principal, if deposited in Bank Rs. 100000 200000 300000 400000 500000 540000 900000 Interest if Principal is deposited in Bank @ 9 % interest per year 9000 18000 27000 36000 45000 48600 81000 Surplus income per year -1540 3800 9140 14480 19820 30560 55520 7 Additional Earnings in percentage -17% 21% 34% 40% 44% 63% 69%

BASIC DATA 1 Basic capacity for Estimate in KWp KWp 2 Est. Generation/ KWh/Day KWh/day 5 3 No of Active Generation Days in a year Days 300 4 Annual generation per kWp KWh/Ann 1500 Av. Monthly Domestic energy consumption KWh 100 6 Annual Consumption 1200 7 Cost of Energy saved in consumption Rs/ Year 4332 8 Tax % 9 Total annual saving in electricity bill Rs./year 4591.9 10 Escalation of electricity cost/year 11 Cost of Energy Exported without subsidy Rs./KWh 9.56 12 Cost of SRTPV Plant per KWp (without subsidy) upto 5 KW Rs./KWp 100000 13 Cost of SRTPV Plant per KWp (without subsidy) for more than 5 KW 90000 14 Plant Life Years 20 15 Expected Returns if deposited in Bank

Tariff Slab LT2 a(i)   Full consm Cons>Gen 2.70 30 81 4.00 70 280 100 5.25 200 6.25 Other Benefits:   1. The plant continues to generate after Payback Period also which leads to substantial financial gain. 2.Generation of renewable energy reduces Greenhouse Gas emission and protects environment

Promotion of SRPTV : BESCOM has formed following committee of members   drawn from various field who have expertise domain knowledge in the field of solar. PROCESS COMMITTEE: To finalize the process right from registration of applications online and up to last mile of grid connectivity. TECHNICAL COMMITTEE: To finalize standards, specification, safety etc., challenges if any.

Major decision taken in process committee: Facilitating payment gateway for On-line applicants. Simplifying SRTPV procedure to speedup approval for SRTPV applicants. Creation of Solar help desk at corporate office level with dedicated landline and e-mail-id. Deletion of On-line applications with 15 days from the date of submission, for those applicants who has not paid application fee at sub-division office. Arrangement of National level workshop cum seminar in Bangalore to capture large no. of system integrators/ PV module / inverter manufacturers etc.

Major decision taken in Technical committee: Empanelment of Grid tied inverter manufacturers Possibility of using one time standard approved drawing by CEIG instead of insisting on approved drawings for every SRTPV installations. Upto 10 kWp, AEE sub-division office is the inspecting authority, above 10 kWp, CEI of Gok is the inspecting authority. Formulating the general procedure for grid connectivity issues.

MOU with GERMI: Entered in to MOU with GERMI on 12/1/15 for training of technicians in the field of SRTPV. BESCOM training of its field staff: BESCOM is conducting 2 days workshop to impact training on SRTPV for all the field engineers of entire state by inviting experts in the field of solar.

BESCOM projects under pipeline: A Tender floated for installation of SRTPV plants on 9 numbers of various BESCOM offices. Amount put to tender is 2.19 crore for 210 KWp. AMOUNT PUT TO TENDER IS Rs. 2.19 Crore of 210 kWp capacity Sl. No. Location SRTPV capacity in kWp LOT 1 1 Chitradurga, C, O & M Zonal office, Chitradurga 20 2 Davanagere, C, O & M Division office, Davengere 22 3 H.S.R. layout C, O & M Division office, Bengaluru 25 4 Chandapura C, O & M Division office, Chandapura 5 Chinthamani C, O & M Division office, Chintamani TOTAL of LOT-1 114 LOT 2   Jayanagar C, O & M Division office, Bengaluru 37 Banashankari C, O & M S-9 Sub-Division office, Bengaluru Jalahalli C, O & M C-3 Sub-Division office, Bengaluru 13 Mathikere C, O & M C-6 Sub-Division office, Bengaluru 30 TOTAL of LOT-2 105

Surya Raitha Scheme Govt. has announced “Surya Raitha” a novel scheme on 24.09.2014 for the welfare of farmers. The scheme promotes for harnessing solar power by installing SPV panels in the farmers land to run IP sets and feed-in excess energy to grid. The scheme is proposed for IP sets on the dedicated agriculture feeders. This is applicable for IP sets < 10 HP. Promotion of solar pump under net metering concept. KERC tariff for SRTPV will be adopted. Net meter will register both import and export energy. The billing will be settled as per meter readings. Farmer can avail soft loan from banks and subsidy from MNRE.

Pilot: Benefits of the scheme Reduction in realizing of subsidies by Govt. to ESCOMs. Reduction in peak load and energy consumption. Assured quality of power supply to farmers during day time. Improvement in water table. Reduction in green gas emissions and global warm issues. Assured income to the farmers apart from income earned through crops. Pilot: To implement “Surya Raitha” scheme a pilot project is proposed. F-2 feeder from Harobele station (Kanakapura taluk in Ramanagara district) is identified and selected.

Scope of pilot Replace existing 250 IP sets by efficient solar water pumps in the pilot feeder i.e.,:- 180 x 5HP by 180 x 7.2kWp SPV systems 70 x 7.5HP by 70 x 10.8 kWp SPV systems The PV capacity over size is done by 50% to enable a self sufficient systems that can pay for itself. To install bi-directional meters for measurement of import and export energy. To keep feeder on from 6am to 6pm during day time for injecting excess energy to the grid. Normally 66% of energy is fed to the pump and 33% to the grid.

Key players of the project Karnataka State Government and MNRE: Project sponsors Implementing Agency (BESCOM): Off-taker of feed-in energy and program implementer System Installer: Supplier of net metered solar pump solution Funding Agency: In the pilot program, the implementing agency (BESCOM) will directly lend to a farmer’s co-operative to enable them in funding the capital cost of the program.

Farmers’ Co-operative Farmers’ co-operative consisting of all beneficiaries on the Harobele F2 feeder will be created. The role of the co-operative will be: To work with BESCOM in order to educate and enroll farmers into the program. To facilitate collection of the initial contribution from farmers in conjunction with the implementing agency (BESCOM). To receive a loan from BESCOM and fund the program. To monitor farmer compliance with the program and check illegal use/activity. To administer enrollment of new pumps into the program. To receive on behalf of member farmers, monthly payments from BESCOM for exported energy. To disburse the same to BESCOM against the loan amount raised to fund the program. To disburse to individual farmers on generation based incentive. This function will be automated through the use of an ESCROW structure and the co-operative will only perform a figurative role.

The breakup cost is as below: Particulars 5 HP capacity per IP set 7.5 HP capacity per IP set Weighted average cost per pump Total cost for 250 pump programme Pump PV Capacity 4.8 7.2   Oversize factor 1.5x Total system size (kW) 10.8 Per kW capital cost (Rs/Wp) 102 Total cost of System, Rs. 7,35,000 11,03,000 Number of pumps installed 180 70 GoK Contribution Rs. 58,000 1,69,000 89,000 Rs.2.2 Cr MNRE contribution Rs. 1,62,000 Rs.4.1 Cr Interest free loan from BESCOM 4,64,000 7,00,000 5,30,00 Rs.13.3 Cr Upfront payment by farmer, Rs. 50,000 75,000 57,000 Rs.1.4 Cr Total Rs.21 Cr

ABSTRACT For 5 HP IP set – 7.35 x 180 = Rs.1323 lakhs Metering cost – 25,000 x 250= Rs. 62.5 lakhs Miscellaneous = Rs. 2.5 lakhs The approximate project cost = Rs. 22 crores (for 250 IP sets)

LOAN REPAYMENT Loan is interest free and term is 15years. EMI for 5 HP is Rs.2,600/- 7.5 HP is Rs.3,900/-

BLOCK DIAGRAM

Challenges No cap on SRTPV generation compared to sanctioned load as per KERC tariff. When the ratio of solar generation power wrt sanctioned load exceeds a certain load, net meter concept is defeated. In a complex/building of more than 10 installations, consumer may connect to a meter which is recording minimum units or make it dummy. Enjoy feed-in tariff instead of net meter tariff of Rs. 9.56 When the ratio of Export v/s Import energy excess more than 90%. For SRTPV > 50kWp consumer needs to install isolating step up transformer as interconnection point is on 11kV, which increases transformer loss.

Inter connection issues when generation is more than 50 KW (For LT consumers). Space constraints for installation of DTC. Up gradation of distribution net work. Power quality concerns of the utilities. Measurement of harmonics generated and injected in to the grid. Billing procedure for SRTPV generators. Settlement of bills and refund issues in case of  export.

Major milestones The Hon’ble CM of State will inaugurate state’s first 1 MW solar power project on Almatti right bank canal. Country’s first Cricket Stadium to go for SRTPV of 400 kWp. Surya Raitha scheme is the first pilot project of nature to be launched in the state. State in the first to go for net metering with attractive tariff of Rs.9.56

Way Forward Empanelment of facilitators: Create awareness among consumers. Assist in project planning. Facilitation in installation. Post installation support. Web based application and helpline to assist prospective consumers. Other promotion: Working with World Bank to promote SRTPV. Examining ESCROW models for developers to install on rooftop of owners. Working with financial institutions. Promotion through Media, Radio, TV etc.,

THANK YOU