1 Harnessing Renewable Energy Solar Mission of Indian Railways
& Solar Mission of Indian Railways

2 ELECTRICITY CONSUMPTION- Key Statistics of 13-14
IR consumed 17.5 billion units- 1.8% of the country’s power generation. -15 BUs for traction - 2.5 BUs for non traction Total annual bill was Rs.11,300 crore - Rs.9650 cr. for traction - Rs.1650 cr. for non traction Peak requirement of power – 4000 MW Average cost of power – Rs.6.50 per unit (ranging from Rs.4.11 to Rs.8.38 per unit)

3 Solar Mission of Indian Railways
IR envisages to source 10% of electrical energy from renewable sources by 2020. Budgetary pronouncement to harness solar energy by utilizing roof top spaces and land including PPP mode.

4 Renewable Energy

5 Railway Energy Management Company (REMC):
REMC, a JV of RITES and MoR, set up to renewable energy projects Activities mandated to REMC Harnessing Green Energy Undertaking power trading activities to reduce electricity bill. Developing power projects to economise electricity tariff. Co-ordination with regulatory authorities to obtain relief on increased electricity tariff. Efficient Power evacuation from captive power plants to TSS Initiative taken so far : Setting up of 25 MW wind mill in Rajasthan Pilot projects for procuring power at a lower tariff through bi-lateral arrangements (a) from Gujarat for Maharashtra and (b) From DVC for Delhi Kanpur Section of NCR. Further planning to set up MW wind mill plants for Railways

6 SOLAR ENERGY MISSION- Initiative Capacity Under IR’s funding
Railway’s funding : Capacity Installed : 10 MWp solar energy being harnessed at LC gates, stations, office buildings, hospitals etc.. Sanctioned Works: Total 7.82 MWp of solar plants - SN Initiative Capacity A Under IR’s funding 1 Provision of solar plant at Katra station, NR 1 MW 2 Provision of solar PV modules at rooftop - -10KWp x 200 stations -100KWp x 20 Offices -45KWp at RDSO -500 KWp x 5 buildings 6.55 MW 3 Provision of solar PV modules at LC gates and office buildings 1.28 MW

7 SOLAR MISSION OF RAILWAYS
(b ) Under PPP- IR’s Solar Mission: Total MWp in next 5 years with Viability Gap Funding (VGF) support from MNRE. SN Initiative Cap. a Phase- I: 200 MW through tariff based bidding process for the states of Maharashtra & AP where the cost of power is high , without subsidy 200 MW b Phase-II:50 MW on Rooftop with Central Financial Assistance (CFA) from MNRE through tariff based bidding process by ZR/REMC. In principle approval of MNRE for Rs.60 Cr subsidy received. 50 MW

8 SOLAR MISSION OF RAILWAYS
SN Initiative Cap. c Phase-III: 500 MWwith VGF support under National Clean Energy Fund (NCEF) on tariff based bidding process through REMC (Ground mounted). 500 MW d Phase-IV:100 MW on Rooftop with Central Financial Assistance (CFA) from MNRE. 100 MW e Phase-IV:150 MW with CFA support from MNRE. (Ground mounted). 150MW

9 500 MWp Ground Mounted solar plant
MODALITIES: Policy issued vide letter dt REMC will select the developer, identify the sites/states, interact with DISCOMS for wheeling of power, co-ordination with Railways for signing of PPAs, payment mechanism etc Priority in States having higher tariff & declared Solar Policy Power generated will be fed to the grid & utilised at railway end. Developer will set up the solar plant at its own cost. Zonal Railways to sign Power Purchase Agreement (PPA) for getting power at a fixed tariff for next 25 years. VGF support upto Rs. 1 Cr/MW from MNRE will be passed on to developer.

10 States having declared Solar Policy;
DISCOMs Total energy consumed (mil Kwh) Total energy bill paid in Crores. Average cost Rs/Kwh. 1 2 3 4 5 APTRANSCO 709.67 507.68 7.15 BSEB 260.77 162.89 6.25 CSEB 429.45 239.98 5.59 DVB 35.93 28.63 7.97 DVC 326.02 124.71 3.83 6 GEB 377.91 241.47 6.39 7 GRIDCO 397.21 243.88 6.14 8 HVPN 167.59 118.84 7.09 9 JSEB 208.82 129.66 6.21 10 KSEB 108.19 58.51 5.41 11 KPTCL 29.36 16.24 5.53 12 MPSEB 969.15 582.49 6.01 13 MSEB 751.99 703.08 9.35 14 TATA 463.71 361.73 7.80 15 NTPC 339.35 223.09 6.57 16 PSEB 81.89 51.59 6.30 17 RSEB 199.45 107.97 18 TNEB 738.96 508.26 6.88 19 UPPCL 446.71 329.37 7.37 20 WBSEB 407.00 321.05 7.89 21 UPCL 7.04 3.08 4.38 22 CESC 26.96 7.05 G.TOTAL 6.79 States having declared Solar Policy;

11 GREEN ENERGY INITIATIVES- Wind Mills
SN Initiative Capacity Action by Target A Under IR’s funding 1 10.5 MW wind mill installed in Tamil Nadu 10.5 MW SR Tender scheduled to open on B. Under JV/PPP-Total MW 2 Setting up of wind mill in Rajasthan through REMC 25 MW REMC NWR Contract awarded. To be Commissioning - Oct 15 3 132.5 MW-wind mill in Gujarat & Maharashtra 132.5 MW WR, CR Load points and States to be firmed up by Jan 2015

12 Thank You