The Use of Differential Speed-Flow Curves in SATURN.

Slides:



Advertisements
Similar presentations
Speed-Flow & Flow-Delay Models Marwan AL-Azzawi Project Goals To develop mathematical functions to improve traffic assignment To simulate the effects.
Advertisements

Running a model's adjoint to obtain derivatives, while more efficient and accurate than other methods, such as the finite difference method, is a computationally.
ACOUSTICS 9 MW. ACOUSTICS 144 MW.
Health and Safety Executive Regulator’s expectation in implementation of comparative assessment Jayne Wilder Chemicals Regulation Directorate, Health and.
Mitigation for Air Quality in the Planning System: case study and lessons learnt Dr Clare Beattie.
The SoCoMMS Model Paul Read Dan Jones. The Presentation Outline of the Study The Modelling Framework Accessibility Model.
SATURN and DIADEM Practical Experience Toni Dichev 31 st Oct 2008.
Junction Modelling in a Strategic Transport Model Wee Liang Lim Henry Le Land Transport Authority, Singapore.
Inter Urban ITS ITS on the Trunk Road Network November 2006.
2015/6/161 Traffic Flow Theory 2. Traffic Stream Characteristics.
Shortest path algorithm. Introduction 4 The graphs we have seen so far have edges that are unweighted. 4 Many graph situations involve weighted edges.
Issues associated with Integrating Transport and Environmental Models Presenter Richard Bradley, Technical Director, Transport Planning, Mouchel.
Service Definer Roles NHS e-Referral Service
TRIP ASSIGNMENT.
Information for students – expression of interest in modules Welcome to the S 3 P system. This PowerPoint will give you details of how to express an interest.
To accompany Quantitative Analysis for Management, 9e by Render/Stair/Hanna 12-1 © 2006 by Prentice Hall, Inc. Upper Saddle River, NJ Chapter 12.
Humber Bridge Review Results from the HUMBER ESTUARY TRANSPORT MODEL.
Transportation Models
Traffic Incident Management – a Strategic Focus Inspector Peter Baird National Adviser: Policy and Legislation: Road Policing.
Data Structures Introduction Phil Tayco Slide version 1.0 Jan 26, 2015.
CREATING THE CASE FOR MORE TRAVEL CHOICES John Bartels, City of Port Phillip and Ainsley Nigro, GHD Cost Benefit Analysis for Implementing Separated Bike.
SafeZone Martin Baker Road Safety Team Leader Poole Borough Council Kevin Jones UK Product Sales Manager Siemens.
Mobile Ghent Mobile positioning data and transport: a theoretical, methodological and empirical discussion 24 October 2013 Bert van Wee Delft University.
Traffic Assignment Convergence and its Effects on Selecting Network Improvements By Chris Blaschuk, City of Calgary and JD Hunt, University of Calgary.
Modelling of Trips using Strategic Park-and-Ride Site at Longbridge Railway Station Seattle, USA, Oct th International EMME/2 Users Conference.
11 Writing a Conference Research Paper Miguel A. Labrador Department of Computer Science & Engineering
Results.
Lecture 4 Transport Network and Flows. Mobility, Space and Place Transport is the vector by which movement and mobility is facilitated. It represents.
Simpson County Travel Demand Model Mobility Analysis November 7, 2003.
Industry Dialogue on xoserve Services Progress Report for Ofgem 5 th December 2006.
1 Quality Center 10.0 NOTE: Uninstall the current version of QC before downloading QC All QC 10.0 documents can be located on the BI Shared Services.
Methodology for the Use of Regional Planning Models to Assess Impact of Various Congestion Pricing Strategies Sub-network Extraction A sub-network focusing.
Non-Linear Regression. The data frame trees is made available in R with >data(trees) These record the girth in inches, height in feet and volume of timber.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
Client Name Here - In Title Master Slide Data Requirements to Support Road Pricing Analyses Johanna Zmud, Ph.D. NuStats Partners, LP Expert Forum on Road.
25 June 2009, London Impact significance in air quality assessment Application of EPUK criteria to road schemes?
Accuracy Based Generation of Thermodynamic Properties for Light Water in RELAP5-3D 2010 IRUG Meeting Cliff Davis.
CRC Energy Efficiency Scheme How to Surrender Allowances GEHO0312BWGC-E-E Last Updated: 31/05/2013 v3.
Non-Motorised User (NMU) Audits Overview presentation Hertfordshire Highways Cycling Scrutiny Panel 14 th & 16 th October 2009.
Design Speed and Target Speed Norman W. Garrick Lecture 3.1 Street and Highway Design Norman W. Garrick Lecture 3.1 Street and Highway Design.
BELMONT TRANSPORT PACKAGE A49 – A465 Link Meeting 19 March 2013.
BELMONT TRANSPORT PACKAGE A49 – B4349 (Relief Road Southern Section) Meeting 14 June 2013.
June 14th, 2006 Henk Taale Regional Traffic Management Method and Tool.
Working paper number WLTP-DHC Comparison of different European databases with respect to road category and time periods (on peak, off peak, weekend)
LONG TERM STUDY OF SKID RESISTANCE ON IN-SERVICE ROADS IN ENGLAND. Chris Kennedy, John Donbavand and Ramesh Sinhal.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
The development of a HOV driver behavior model under Paramics Will Recker, UC Irvine Shin-Ting Jeng, UC Irvine Lianyu Chu, CCIT-UC Berkeley.
Assignment Convergence: Big Model, Small Projects; Improving Assignment Convergence in Ohio for Estimating Project Impacts TRB Planning Applications Conference.
Measuring rail accessibility using Open Data Elena Navajas-Cawood.
Evaluation of Low Volume Roads Rodrigo Archondo-Callao Senior Highway Engineer, ETWTR January 10, 2008 The World Bank.
Generated Trips and their Implications for Transport Modelling using EMME/2 Marwan AL-Azzawi Senior Transport Planner PDC Consultants, UK Also at Napier.
Dynamic Turn Indicator: Research/Investigation Findings Informal document GRE (70th GRE session (21-23 October 2013, agenda item 5(f))
Network Problems A D O B T E C
PORTAL: Portland Transportation Archive Listing Improving Travel Demand Forecasting Conclusion Introduction Metro is working closely with PSU researchers.
Simon Amor Asset Development Manager
Performance Comparison of Ad Hoc Network Routing Protocols Presented by Venkata Suresh Tamminiedi Computer Science Department Georgia State University.
STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER.
WLTP-DHC Analysis of in-use driving behaviour data, influence of different parameters By Heinz Steven
OPERATING CHARACTERISTICS OF DC GENERATOR
Milton Road – Bus Stop and Crossings Workshop WSP
Econometric analysis of the benefits of early legal advice
LDZ System Charges – Structure Methodology 26 July 2010
Sign critical appraisal course: exercise 2
Econometric analysis of the benefits of early legal advice
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Chapter 9: Setting the list or quoted price
Adherence to Evidence Based Medicine Programme Evidence Summary Pack (Version 2) Correction of Ptosis Local commissioners working with local people for.
LTP Finance Working Group Workshop
Geo-enabling the SDG indicators – experiences from the UN Global Geospatial Management and the GEOSTAT 3 project Agenda item 12 Ekkehard PETRI – Eurostat,
Presentation transcript:

The Use of Differential Speed-Flow Curves in SATURN

The Use of Differential Speed-Flow Curves in SATURN KARL ILBREY 31 st October 2008

Introduction Work undertaken by the Highways Agency in 2005 showed the importance of using speed-flow curves, and the difference they could make to the results of an economic appraisal The developers of SATURN were asked to formulate a method for using differential speed-flow curves within the program Two different algorithms were developed and have now been assessed further

SATURN Algorithms CLICKS Where the light vehicles free flow speed is greater than a specified maximum limit the extra time taken is calculated and treated as a fixed delay for vehicles of that type CLIMAX The speed remains constant as long as it is lower than lights. When the light vehicle speed drops below the HGV limit, both travel at the same speed KLUNK The maximum speed is defined for each road index

Test Models A556 Mere Model – Knutsford to Bowdon Improvement Covers Cheshire and Manchester and includes several small towns Essentially in buffer apart from the M6 to M56 link under investigation and all motorway links / junctions Convergence just outside full DMRB criteria A14 CHUMMS Model – Ellington to Fen Ditton Improvement Covers Cambridge and Huntingdon with associated strategic routes Major route under investigation coded entirely in simulation Better convergence, though now superseded by a more upto date model M6/M62 Parkside Model – Junction 22 Amendment Covers urban areas around Newton-le-Willows and Warrington Includes M6, M62 and A580 East Lancashire Road Covers a smaller more urban based area

Test Methodology (1) SATURN Version Base model without differential curves Base model with CLICKS by vehicle type only SATURN Version Base model without differential curves Base model with CLICKS by vehicle type only Base model with CLICKS and KLUNK Base model with CLIMAX by vehicle type only Base model with CLIMAX and KLUNK

Test Methodology (2) The five different algorithms were run for: Do-Minimum and Do-Something situations And both… Opening Year and Design Year situations Tests on the Mere model were undertaken using both versions to enable a comparison of versions to be made For each assignment a note was made of the total Vehicle-hours and Vehicle-Km by vehicle type, plus flows and times along an A556 Improvement screenline The tests on the Parkside and CHUMMS models were both confined to options using KLUNK in version

Aspects under analysis… 1.Has the update from to made any changes? 2.How much do the different algorithms affect the assignment results? 3.Are the changes sufficient to have a significant effect on the economic appraisal results?

Comparison of SATURN Versions and Figures for Vehicle-Km and Vehicle Hours were compared for each User Class A comparison was made for SATURN both with and without CLICKS by Vehicle Type The change in version has made some slight differences to the assignment results However, the difference was less than 0.1% for all items measured, and less than 0.01% for most of them It could therefore only be significant in a model where the scheme is very small compared with the model size It was therefore concluded that the change in version had no effect

Effect of different Algorithms (1) This can be seen through the Percentage Changes in Vehicle-Km in the Base Year for the Mere and Parkside Models:

Effect of different Algorithms (2) It can also be seen through the Percentage Changes in Vehicle Hours:

Effect of different Algorithms (3) It would be expected that as only extra time is added by the algorithms, only the vehicle hours would change However, the extra time is clearly causing some route choice differences Even though the algorithms are only used on OGVs, Car and LGV times and distances are also being changed due to re-assignment As expected, the greatest changes are to the OGV Vehicle Hours, with upto a 12% increase caused by using CLICKS by Vehicle Type OGV vehicle distances can change by upto 1.8% CLICKS gives consistently bigger differences than CLIMAX, due to the smaller differential between the speed-flow curves The choice of algorithm can therefore have a significant effect on the results of an assignment

Effect on Economic Appraisals (1) The future year assignments were used to calculate the change in vehicle time and distance due to the relevant improvement scheme These then act as a proxy for the economic benefits, and indicate how much the SATURN parameters may affect TUBA results Assessments were undertaken for the A556 Improvement in both the opening and design years (2014 & 2029) The process was also undertaken using the Parkside and CHUMMS Models for just a single assessment year

Effect on Economic Appraisals (2) Changes in Design Year for A556 Mere Improvement (2029) There is little variation between the options assessed This is likely to be due to the level of congestion in the network, as the area is already subject to considerable delays

Effect on Economic Appraisals (3) Changes in Opening Year for A556 Mere Improvement (2014) There is much more variation between the options assessed in the opening year This is sufficient to imply that this could have a noticeable effect on economic results

Effect on Economic Appraisals (4) In order to confirm these results, the same analysis was undertaken for the Parkside Model

Effect on Economic Appraisals (5) The exercise was also repeated using the CHUMMS Model

Effect on Economic Appraisals (6) These two models give considerably less differential than the A556 Mere model The reasons for this are not clear, but it may be connected with the ratio of benefits to total model costs – for Mere benefits are only 0.1 to 0.8% of total model costs Thus, a small difference, perhaps caused by differences in convergence, can have a significant impact on benefits The other models show benefit to cost ratios of 0.5 to 2.7% and 3.5 to 12.7% so convergence differences will have less effect In some models the choice of algorithm may have a significant impact on the economic benefits of a scheme

Conclusions The change in SATURN version has had no effect The choice of algorithm can have a significant effect on the results of an assignment In some models the choice of algorithm may have a significant impact on the economic benefits It is therefore suggested that the Department for Transport may wish to recommend that a sensitivity test should be undertaken with both CLICKS and CLIMAX to check whether the choice will have affected economic benefits

Presentation Title here I date here The Use of Differential Speed-Flow Curves in SATURN KARL ILBREY Tel: +44 (0)