Slide 1 Caltrans Bridge Construction Forum 2007 Structure Specifications Andre K. Catellier RNR Construction, Inc. Jeff Abercrombie California Department.

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Seminar Specifications
Advertisements

ODOT Structure Project Manager Training
Retroreflectivity: Raising the Nighttime Brightness of Traffic Signs and Markings Office of Technology Applications Peter Hatzi.
BRIDGE CONSTRUCTION INSPECTOR Practice Questions Next.
2013 Northcentral Region Construction Conference
API Specification 6A Furnace Calibration Requirements
ACI “Standard Specifications for Tolerances for Concrete Construction and Materials” gives (2) tolerances for suspended slabs on metal deck: Thickness.
2013 C&MS Section 500- Structures Changes from 2010 to 2013 Construction and Materials Specifications in Structures Items.
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
DPS 304 : Purchasing /Procurement Activities
PCI Northeast Bridge Technical Committee Standards for Accelerated Bridge Construction Including the Northeast Extreme Tee (NEXT) Michael P. Culmo, P.E.,
Spliced Precast Girders
Interim Life Safety Measures Eleven Administration Actions of Interim Life Safety Measures ÷Ensure free and unobstructed exits. Personnel receive additional.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Jeff Carpenter State Construction Engineer WSDOT Design-Build Contracting 2011 AASHTO Subcommittee on Construction Virginia Beach City, VI August 2, 2011.
Marcy Mealy Procurement Specialist CDBG Program
CHARLOTTESVILLE POLICE DEPARTMENT GENERAL ORDER LIMITED ENGLISH PROFICIENCY POLICY: It is the policy of the Charlottesville Police Department to take reasonable.
2015 Winter School Structures Heidi A. Mertz, P.E. District 8-0 Structure Control Engineer.
 Project Delivery  Design Considerations  Lessons Learned.
Concrete Quality Assurance: How Concrete is Specified and Supplied To Meet Construction Specifications Prepared By: Prof. Marcia C. Belcher Construction.
Region One Bridge Design – Robert Jose Tovar “If I have seen further it is by standing upon the shoulders of giants” – Isaac Newton.
City Council Meeting January 18, Background  Staff receiving increasing number of inquiries regarding installation of wireless telecommunications.
ODOT Policy for Deck/Slab Closure Pours Sean Meddles, P.E. Assistant Administrator ODOT Office of Structural Engineering.
2.01 Economic Systems Objective 2.01 Compare different types of economic systems: traditional, free enterprise, command and mixed.
Evgeny A. Gorbunov, General Director, Union of Aviation Industrialists
The Organizing Function. What is Organizing? Organizing is the deployment of organizational resources to achieve strategic goals.
Tribal Benefits from State Implementation Plan (SIP) Process Involvement Rosanne Sanchez New Mexico Environment Department Air Quality Bureau.
© 2011 The McGraw-Hill Companies, Inc. All rights reserved. Police in America Chapter Three The Contemporary Law Enforcement Industry.
Bulletin Guidance and Resources. BUL Format Provides a table of contents Organizes School Site Council (SSC), Compensatory Education Advisory.
Old Policy – which no one ever seem to have heard of.
2006 California Bridge Construction Forum Opening Remarks Dolores Valls, Chief, Statewide Operations Offices of Structure Construction.
Slide 1 Caltrans Bridge Construction Forum 2007 Bidding Process and Construction Environment Brian Mapel FCI Constructors Inc. Jeff Abercrombie California.
Impact of Immigration Policies on HIV/AIDS Care Access and Retention Catalina Sol Chief Programs Officer La Clinica del Pueblo.
1-1 Roles and Responsibilities. 1-2 Module Objectives  Recognize the roles of LEOs and others in work zones  List LEO responsibilities and expectations.
Copyright © 2006 by South-Western, a division of Thomson Learning, Inc. All rights reserved. Chapter 19 Pricing Strategies.
Gaps & Useful Practices Los Angeles County Multi-Agency Radiological Response Plan (MARRP) Kathleen Kaufman Former Director, LA County Radiation Management.
SFOBB East Span Seismic Safety Project Steve Margaris, Specifications Engineer, Caltrans.
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Contractor Information Meeting Construction Contract F4 August 16, 2005.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
Mobile Audio/Video Recording Equipment Policy and Procedure Number PP
1 Cold Spring Canyon Bridge Proposed Suicide Barrier Project Information Meeting & Open House Sara von Schwind Caltrans Project Manager.
© 2011 Underwriters Laboratories Inc. All rights reserved. This document may not be reproduced or distributed without authorization. ASSET Safety Management.
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
Bridge Design to AS 5100 Sydney May 25th 2005 Using High Strength Concrete with AS 5100 opportunities and restrictions.
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
Subcommittee on Heights, Massing, and Alternate Standards    Third Report – January 20, 2009 Planning & Zoning Commission.
Alternate Technical Concepts AASHTO Subcommittee on Design July 28, 2010 Columbia, S.C. KATHY HARVEY State Design Engineer Missouri Department of Transportation.
Caltrans Research Highlights Presented by The California Department of Transportation Tab 63.
Streamlining – The Need: Costs Saved and Lessons Learned Facilitating Disaster Preparedness, Response & Recovery.
Approaches for Integrating Systems Engineering into Your Agency's Business Practices. Talking Technology and Transportation (T3) Webinar August 2, 2007.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project.
Investigational Devices and Humanitarian Use Devices June 2007.
Caltrans Bridge Construction Forum 2007
Item 6b. Project Vicinity Park Ave Bridge Existing Park Avenue Bridge.
1. Enforcement of Scenic Byway Laws, Rules, and Policy 2.
Slide California Bridge Construction Forum Opening Remarks Dolores Valls, Chief, Statewide Operations Offices of Structure Construction.
DLA AVIATION REVERSE AUCTION PROGRAM
MBTA/MassDOT RAILROAD QUIET ZONES
Offsite manufactured Bridges
Marketing Channels Bluefield College October 26, 2010.
Danube Bridge Vidin – Calafat
Chapter 19 Pricing Strategies.
Risk Identification Canvas – New Product Launch
Utility Permitting Overview
Chapter 8: Selecting an appropriate price level
Uniform Guidance - Procurement Implementation
Navigating FDOT Specifications and Standards
Presented By Melissa Lee Assistant Purchasing Agent Tarrant County
Construction Considerations
The Role of Private Sector in Capital Budgeting
Presentation transcript:

Slide 1 Caltrans Bridge Construction Forum 2007 Structure Specifications Andre K. Catellier RNR Construction, Inc. Jeff Abercrombie California Department of Transportation

Slide 2 Structure Specifications Survey Selected Specifications appear yearly in the Industry Survey by OSC for the Bridge Forum Decision to tackle as a Macro–Topic Evolution is occurring, significantly more risk, more stakeholders, and more demands on Industry and Caltrans Specifications are the most complex document in the relationship: Why?

Slide 3 Specification Areas Laws, Regulations, Federal Policies Non Engineering Stakeholders Quality Control Technical Parameters Administration, Payment Risk and Punishment

Slide 4 Specification Cost Curve By Andre K. Catellier

Slide 5 Specification Outcome Excessive complexity in language and intent: –Policing and Bureaucratic Environment –Disjunction from Traditional Design Rationale –Project Controlled by Specialists NOT Resident Engineer or Structure Representative –Long, very long review and conflicts ensue –UNSTOPPABLE INTERPRETATION CREEP –UNSTOPPABLE COST CREEP –UNSTOPPABLE LOSS OF FIELD CONTROL

Slide 6 Specification Cost Outcome What is the cost of Caltrans Precast QC / QA? Project 1 : Two side by side box girder bridges over State Highway 112’ wide x 270’ long (H-Piles) $ 110 / SF Project 2 : Precast voided slab with 4” CIP deck 68’ wide x 190’ long (10’ above OG) (with precast piles) $ 257 / SF

Slide 7 The language of Specifications Translation of Permits and Restrictions from Stakeholders… –Permit : “ The construction of falsework, cofferdams or other obstructions, if required, shall be in accordance with plans submitted to and approved by the Commander. All work shall be conducted that the free navigation of the waterway is not unreasonably interfered with and the present navigable depths are not impaired.” –Specs : “Temporary minimum vertical clearance for the bridge shall be maintained no lower than 1.00 meter below the lowest hittable part of the primary navigational channel span within the temporary clearance area.”

Slide 8 Examples: Couplers Current designs are calling for shafts going deeper and deeper and deeper…. –Results in extremely long cage lengths; couplers –Excessive No Splice and Plastic Hinge Zones –Extremely difficult constructibility issues. –Coupler QA / QC provisions ?

Slide 9 Examples: Bridge Removal Original intent: –Structural Review, Control of Structure Present Interpretation: –Traffic, resources, point of no return identification, equipment productivity, person in charge, on site meetings, back-up equipment, etc. Significant CREEP in bridge removal plan requirement… While traffic windows continue to shrink

Slide 10 Example: Welding Suppliers contend “it is the most bureaucratic, duplicative specification in industry.” Unrelated to the design demands of particular project welds. –A blanket approach: Project by project qualification is unnecessarily costly and time consuming. Specification has life of its own with severity constantly on the rise

Slide 11 What are the Issues? Excessive, Complicated and Convoluted Specifications –Are leading to fewer bids. –Are causing cost escalation. –Are subject to evolving interpretations. –Are driving suppliers away from Caltrans work. –Are creating a moving cost and technical target. –Exacerbates efforts to achieve uniform enforcement.

Slide 12 Solutions ?