Development of Sanitary Landfill and Capping of Existing Dump site at Mysore. 12-04-2012. 23-08-2011.

Slides:



Advertisements
Similar presentations
Municipal Solid Waste Defined in 40 CFR Part 258.2
Advertisements

Lorong Halus Interchange Introduction: Project to build a new $26 million interchange for the Tampines Expressway starting The site was situated.
Leachate Collection Systems. Class Objectives  To discuss landfill water balance  To present liner and leachate collection system (LCS) design information.
There are 3,091 active sanitary landfills in the U.S. and over 10,000 old municipal landfills (rubbish pits).
1 Results Based Regulation Implications for Municipal Solid Waste Management Presented By: Blake E. Nesbitt Saskatchewan Ministry of Environment SUMA Convention.
 ideally the disposal methods should meet the following condition:  environment friendly  cause no health hazard  economically less demanding  maximum.
Shane Wright, Danielle Gregory, Chet Manning, Hector Alanis.
Your logo here WasteMINZ Mid-Year Roundup Wellington.
Preparation Of DPR And How To Monitor The Construction Works On Technical Aspect.
Solid Domestic Waste IB Syllabus 5.5.1, AP Syllabus Ch 21 Personal Waste Audit Trashed video.
4.5 Pounds of Trash are produced Per Person Per Day Where Does our Trash Go? 27% Recycled 16% Burned 57% Landfilled Nationally: 31% Recycled 69% Landfilled.
At 4620 square miles, Lane County, Oregon is nearly as large as the State of Connecticut and is home to some 336,000 residents. Short Mountain Landfill,
NATIONAL SOLID WASTE MANAGEMENT PROGRAMME RIVERTON LANDFILL.
Environment Engineering I
MUNICIPAL SOLID WASTE Management & Practices Asssitant Engineer (Mech)
Landfills Geography 12 Kala Renard
EXAMINATION OF MODERN SANITARY LANDFILLS W. Gregory Vogt Chair, Sanitary Landfill Working Group, ISWA Vice President, SCS Engineers.
PRESENTED BY: SUNIL VADHER GYANPRAKASH SINGH PANKAJ BHALALA Wastech International Summit & Expo 4R’s (Reduce, Recover, Reuse, Recycle): A Way to Sustainability.
Jasmit Bains and Jamie Laukaitis.  East Midlands - centre of the ‘Industrial revolution’  FACT : PRIDE - P artnership to R egenerate through I nnovative.
APES – Mrs. Soja – Part 1. A.Solid Waste - any unwanted material that is solid  1.The U.S. produces 11,000,000,000 tons per year (4.3 pounds per day)
OPEN DUMPS Oldest and most common way of disposing solid waste
Garbage !! Everyone produces waste the USA alone produces 11 billion tons of solid waste a year.
G3 – Environmental Geomechanics (Dr Sam Yuen)
Sanitary Engineering Lecture 16
AGRICULTURE BMP QUESTION 2 Name the BMP.. AGRICULTURE BMP ANSWER 2 Name the BMP. Windbreak Row of trees Trees or shrubs that slow the wind.
4.5 Pounds of Trash are produced Per Person Per Day Where Does our Trash Go? 27% Recycled 16% Burned 57% Landfilled Nationally: 31% Recycled 69% Landfilled.
SITUATION OF HEALTHCARE WASTE MANAGEMENT IN NEPAL AND AN EFFORT FOR IMPROVEMENT AT RESOURCE POOR SETTINGS JAYENDRA BHATTA PROGRAMME OFFICER/CIVIL ENGINEER.
EnE 301: ENVIRONMENTAL ENGINEERING
Landfill. ESSENTIAL COMPONENTS 7 essential components are: (a) A liner system at the base and sides of the landfill which prevents migration.
20 – Operation and Maintenance 1/45 “There is no sensible reason to design and prepare for a better engineered landfill if it is not operated in a better.
Bottom Liner System The bottom liner prevents the trash from coming in contact with the outside soil, particularly the groundwater. In MSW landfills,
How Landfill s affect US by hailey marr What is a landfill? F A landfill is an engineered depression in the ground used to store wastes. F Like a bathtub.
Environmental Chemistry Chapter 16: Wastes, Soils, and Sediments Copyright © 2012 by DBS.
War on Waste SC.912.L Waste management strategies Recycling and reuse- Recycling allows the reuse of glass, plastics, paper, metals, and other.
MUNISPORT LANDFILL Vijay Kumar Rayabharapu. Munisport Landfill (Biscayne Landings) Landfill N N.E. 151st St., Biscayne Blvd ) Florida International University.
DAVIE LANDFILL Banu Sizirici. MAPS Vista View Park (Davie Landfill)
D18 Explain the short-and long-term impacts of landfills and incineration of waste materials on the quality of the environment.
 incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into.
Methods of Landfilling
Waste. Solid Waste Any discarded solid material The U.S. produces 10 billion metric tons of solid waste each year. The amount of waste generated by each.
Landfills Part 1. There are 3,091 active sanitary landfills in the U.S. and over 10,000 old municipal landfills - also called rubbish pits or dumps.
Chapter 4 Land and Soil Resources
SANITARY ENGINEERING Planning, designing and installation of system for the collection, conveyance, treatment and disposal of the waste.
 Landfill Type  aerobic landfill  anaerobic sanitary landfill with daily cover  improve anaerobic sanitary landfill with buried leachate collection.
TREATMENT PROCESS (Chicago)
It All Starts Here... A day in the life of your waste water...
IRON HORSE PARK (SHAFFER LANDFILL) Don McElroy, EPA Region 1, Remedial Project Manager Source:
EXERCISE 1 GROUP : OPERATOR. Safety Case : Post Closure Of A Disposal Facility Introduction  The facility is situated in Vaalputs, South Africa.  It.
Yolo County Planning, Resources and Public Works Department 1 Landfill-based Anaerobic Digestion Compost Pilot project at Yolo County Central Landfill.
GO C3Analyze and Evaluate Mechanisms Affecting the Distribution of Potentially Harmful Substances within an Environment. Transport of Materials Through.
Mandatory Requirements of Ecological Solid Waste Management Act (RA 9003) on CLOSURE AND REHABILITATION OF DUMPSITES.
What is sustainability? Define sustainability. Draw the 3 circles of sustainability.
MUNICIPAL SOLID WASTE (MSW) Aka: Garbage. Municipal Solid Waste  Aka “trash” or “garbage”  Consists of common household waste, as well as office and.
Chapter 16 Landfill Liners and Geosynthetics
AIRPORT SURVEYS.
WASTEWATER.
Successful Registration of CDM Project for Earning Carbon Credits
Design and Construction of Composite Lined Landfills
Step 1 Many landfill sites are on old quarries of all kinds.
Upland Landfill Waste Discharge Application 7295 Gold River Highway
Landfill Review.
Landfilling in the Slovak Republic – legislation and actual situation
Average person produces 1700 lbs of MSW per year
17.7 Single Clay Liner and Single Geomembrane Liner Systems
Scientific or Engineered Landfilling of Waste
TECHNICAL SPECIFICATION AND REQUIREMENTS
Upscaling Basic Sanitation for the Urban Poor (UBSUP)
WASTE DISPOSAL No matter what processing is done, there will be some residue that needs to be disposed of safely Options for disposal Modern, engineered.
Coal Waste Storage Area Pond Design/Build Project Stanton Energy Center Chip Merriam Chief Legislative & Regulatory Compliance Officer.
Closure and Post-Closure
Presentation transcript:

Development of Sanitary Landfill and Capping of Existing Dump site at Mysore. 12-04-2012. 23-08-2011

Project concept Mysore being mission city of JnNURM, GoK opted development of MSW project on PPP (BOT) model. JnNURM grant of Rs.11 Crores has been sanctioned by CSMC of JnNURM, MoUD, GoI. Through open bidding JUSCO Ltd. has been selected as BOT operators. Agreement between JUSCO & MCC was signed on 1st July, 2010.

DESCRIPTION OF THE PROJECT Name of the Project: Build, Operate ,Maintain & Transfer of MSW Disposal facility for Mysore City Corporation, Mysore. Scope of Work: Establish an Engineered Landfill facility, capping of existing garbage dump & Development of Infrastructure facilities. Operation & Maintenance: 13.8 years every day operation & Closer of Sanitary Landfill (SLF). Maintenance of post closure SLF up to 10 years .

CAPPING OF EXISTING GARBAGE The entire existing garbage is organized in to two various locations. Closer No:1 (Seven acre)- where the large quantity of garbage is dumped since many years. Closer No:2 (Five acre)- to develop new capping area.

SALIENT FEATURES OF CAPPING Closer No:2 (Five acre): Provide HDPE bottom liner Organise garbage in trapezoidal shape with side slope of 1V:3H. Provide impervious layer of 600mm thick ( permeability 1X 10 -7 cm/sec) Provide 450 mm thick top vegetative soil Provide Gas vent system using HDPE pipes and filter media Leachate collection system Closer No:1 (Seven acre): Organise garbage in trapezoidal shape with side slope of 1V:3H. Providing top impervious layer of 600mm thick ( permeability 1X 10 -7 cm/sec) Provide 450 mm thick top vegetative soil Provide Gas vent system using HDPE pipes and filter media Leachate collection system

Components of Landfill Impervious bottom liners Leachate Collection and Removal System Leachate Treatment Plant Storm Water Drainage Gas vent and flaring system

DEVELOPMENT OF LANDFILL Steps of developing SLF Excavation of land with slope of 1V:3H Providing multiple bottom liner of GCL, HDPE, Drainage media & Leachate collection network. Construction of Leachate Treatment Plant. Capping, Gas vent System & Vegetation. Post maintenance.

Aerial View of the Site during construction - Stage About 7 kms away from the city About 600 mtrs away from residential zone Aerial View of the Site during construction - Stage Capping area 7 acres 5 acres SLF

C/S of SLF 6mm

SALIENT FEATURES OF THE LTP Sl. No. Particulars of treatment units Dimension in Mts. Compliance and remarks 1. Leachate collection tank The design is carried out considering the total leachate collected from SLF and both the capping areas ( 15.00 cum per day ). 2. Anaerobic reactor i.e. UASB with gas vent system connected to flare stack. 4.0x2.7x2.5 3. Aeration tank with surface aerator 5 HP. 5.0x3.0x2.7 4. Settling tank with hopper bottom. 3.0x2.8 5. Sludge drying beds – 2 Nos. 2.0x2.0x2.5

ENVIRONMENTAL MONITORING SYSTEM Ambient air and Ground water quality before and after operation will be monitored regularly. Monitoring bore wells Buffer zone around the project area will be developed with necessary plantations. Rain water harvesting will be implemented. Laboratory facilities. Environmental Engineer will monitor the SLF activities.

PRESENT STATUS OF PROJECT Old garbage of about 4.50 lakhs cum has been reorganized in 7 & 5 acre capping area. Providing clay and vegetative liners above compacted waste is completed. Excavation of landfill for 1st phase in 9.2 acres is completed. Laying of GCL,HDPE, Drainage layers and Geo-textile& soil for first cell completed. Development of infrastructural facilities are completed.

The 1st cell sanitary landfill site is constructed in an area of 2 The 1st cell sanitary landfill site is constructed in an area of 2.5 acres by digging a pit of size 80X110X3.5 mts. The filling of compost rejects for the first cell sanitary land fill site will enable to fill 45,000 MT of compost rejects at the rate of 90 TPD and they proposed to fill and complete the first cell in 1 1/2 years time. The closure plan of sanitary land fill site includes the covering of the cell by clay and soil media above which vegetative cover with gas vent and storm water collection system. Overall this firm can handle 1,35,000 MT of compost rejects in phase manner.

Scenario before the project.

EXCAVATION DONE UP TO AVG 3.5 METERS BELOW GROUND LEVEL. LANDFILL EXCAVATION EXCAVATION DONE UP TO AVG 3.5 METERS BELOW GROUND LEVEL.

Landfill facility developmental activity

Landfill facility developmental activity

LAYING OF GCL OVER THE COMPACTED SOIL

LEACHATE COLLECTION SYSTEM (with perforated HDPE Pipe Net work)

PROVIDING OF FILTER MEDIA

LAYING OF GEO-TEXTILE OVER FILTER MEDIA

Present Status of Landfill- Cell -I

REORGANIZATION AND CAPPING OF WASTE UP TO 14 METERS HEIGHT AT CLOUSER NO-1 ( 7 ACRES) Provision of 600mm clay Provision of 450mm Vegetative cover

REORGANIZATION AND CAPPING OF WASTE AT CLOUSER NO-2 ( 5 ACRES) Waste dumping in 5 acre capping site Leachate outlet pipes

Infrastructure facilities development

40MT capacity Weigh Bridge.

ENTRANCE GATE & COMPOUND WALL

Thank You.