Chipseal Construction Section 37.2 Seal Coats.  Proper surface preparation  Use of right asphalt binder, asphaltic/polymer modified emulsion and clean.

Slides:



Advertisements
Similar presentations
Asphalt Pavement Laydown and Compaction
Advertisements

2014 Chip Seal Training Contract Administration Issues.
Construction of Longitudinal Joints 2014 VDOT/VAA Regional Asphalt Seminars Ken Arthur Quality Control Manager Templeton Paving.
Product Properties, Classification, Selection and Application
From… Maintenance Technical Advisory Guide (MTAG) Chapter 7 Fog and Rejuvenating Seals.
ROAD PAVEMENT FORUM GUIDELINES ON MODIFIED BINDERS FOR USE IN HOT- MIX ASPHALT AND SURFACING SEAL APPLICATIONS.
Comal County Chip Sealing June 26, 2007.
2014 Chip Seal Training ODOT Specifications
South African Seal Design & Practice Trevor Distin.
Module 4-2 : Joint Sealing
 Ditching  Crack Seal  Dig-outs  Blade Patching  Shoulders  Chipseal  Fog seal  Striping.
Pavements. Concrete –Rigid pavement Used where strength is an issue Runways, interstates and major roads –Continuous reinforcing Must have a good base.
Chapter 6 Chip Seals From… Maintenance Technical Advisory Guide (MTAG)
Blacklidge Emulsions Inc. GuardTop Sealer. Guardtop Mission Statement The goal of Guardtop is to produce an asphalt seal coating that has deeper and longer-lasting.
Conversion of Petroleum Contaminated Soil into Asphalt-Treated Road Base U.S. Army Corps of Engineers, Alaska District.
TOPIC OF THE DAY Flexible Pavement Distresses/Failure Of Structure.
AF2903 Road Construction and Maintenance Compaction of Hot Mix Asphalt
District 8-0 Winter Schools /23/2012.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 6 Dowel Bar Retrofit.
District 8-0 QA Review Trends Summary Documentation and Certification Project certifications for materials should be reviewed as they.
Mandatory Prepaving Conference
PAVEMENT MAINTENANCE II Part 1b: Chip Seal Construction Idaho Roads Scholar Program.
NEW MEXICO-CHIHUAHUA RURAL TASK FORCE Technical Workshop: Dust Control for Improved Particulate Matter Air Quality in Columbus-Palomas December 2, 2008.
Fog Seals, Sand Seals, Scrub Seals, and Rejuvenators.
Pavement Maintenance II Part 1a: SurfaceTreatments Idaho Roads Scholar Program.
MAINTENANCE PART 2. Inlet free of obstructions Inlet free of obstructions Adequate scour protection provided.
Recycled Asphalt Pavement In Preservation
A mixture of asphalt emulsion, crushed aggregate, mineral filler, water and other additives properly proportioned, mixed and spread as a surface treatment.
HMA Construction Program
MICHIGAN RIDES ON US 2015 Local Roads Workshop Gaylord March 12, 2015.
Got Density? Asphalt Pavement Assn. of Indiana Winter Conference December 2010.
Caltrans Specifications - Changes and Implementation Scott Dmytrow Telfer Oil Telfer Highway Technologies.
CIVL 598 Asphalt Paving Materials Asphalt Rubber.
Chapter 5 Patching and Edge Repair
Street and Local Roads Inspection and Acceptance of Alternative Pavements.
Introduction to Asphalt Pavement Construction and Compaction For ODOT District 3 presented by.
Chapter 4 Crack Sealing, Crack Filling, and Joint Sealing From… Maintenance Technical Advisory Guide (MTAG)
Placing Quality Concrete
Pavement Maintenance II
Asphalt Rubber Seal Coats. How many cracks can you fill in one day?
Overview of the New Hot Mix Specifications Dale A. Rand, P.E. TxDOT Construction Division Flexible Pavements Branch TRB AFK10 Committee Meeting April 20-21,
PAVEMENT MAINTENANCE 1 Part 3: Potholes and Cracks Idaho Roads Scholar Program.
Seal Coating What was the cause of the failure? Sponsored by: Minnesota LTAP Center Presented by: Michael Marti, P.E. SRF Consulting Group, Inc. Dan Wegman,
Micro-surfacing SRF Consulting Group, Inc. SemMaterials
1 Reclaimed Asphalt Pavement in Arizona - Application and Verification October 3, 2008 Arizona Association of County Engineers.
Surface Treatment Multi Agencies Collaboration. Participating Agencies Oregon Department of Transportation Ona Beach Maintenance Section Rose Lodge Maintenance.
Paving & Surfacing Module #6 Prepared by Dr. Randy R. Rapp July 2005.
Pavement Types Dr. TALEB M. Al-ROUSAN.
PUSHING THE OPERATIONAL LIMITS OF SURFACE SEALS AND ITS EFFECT ON CURRENT MATERIALS SPECIFICATIONS Douglas Judd.
Ultra Thin Bonded Wearing Coarse Sponsored by: Minnesota LTAP Center Presented by: Michael Marti, P.E. SRF Consulting Group, Inc. Dan Wegman, P.E. SemMaterials.
Trenton M. Clark, P.E. Director of Engineering Virginia Asphalt Association.
Surface Treatments #2.
Multi-Layer Systems By Vadim Kravtsov Intermountain Slurry Seal, Inc 1.
1 USE OF ASPHALT RUBBER IN PAVEMENTS Construction Inspection Overview Technology Transfer Series ARHM- 105 Webinar.
Materials Selection Chapter 3. Seal existing pavementSeal existing pavement ̶ More binder the longer the seal will protect underlying HMA Bond to aggregateBond.
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
Designed with the Paving Professional in Mind
3rd International Road Surface Friction Conference
Extending Performance with Proper Asphalt Compaction
Deschutes county road department otta seal gravel road conversion pilot project December 7, 2016 oaces chip seal workshop.
VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS
HIGHWAY MAINTENANCE Failures in flexible pavement.
Surface Preparation before laying Hot Mix
Dedicated to Quality Partners In Quality
QC Document Update Todd Shields, INDOT.
Longitudinal Joint Construction – Why Straightness Matters
Chip Seal Quality Assurance Guide
Materials and Tests Engineer
15th Annual Arizona Pavement/Materials Conference
Asphalt Rubber Chip Seals
Presentation transcript:

Chipseal Construction Section 37.2 Seal Coats

 Proper surface preparation  Use of right asphalt binder, asphaltic/polymer modified emulsion and clean aggregate screenings  Adherence to the project specifications, including traffic control  Check equipment before start  Chip seal in good weather conditions

 Materials  Equipment  Construction Procedures  Quality Control  Quality Assurance to be covered Topics to be covered Section A Summary

 Asphalt Binder, Asphaltic Emulsion, Polymer Modified Emulsion (PME)  Screened Aggregates MATERIALS Section A Summary

 Distributor Trucks  Screened Aggregate Spreaders  Self Propelled Screened Aggregate Spreader  Self Propelled Power Brooms & Vacuums  Pneumatic Tired Rollers  Width ≥ 4’  Weight ≥ 3000 lbs. per Wheel Equipment Section Equipment

Construction Procedures  Proper Surface Preparation  Apply Binder/Asphaltic Emulsion/Polymer Modified Emulsion at Specified Rates & Temperatures  Apply Screened Aggregates at Specified Rates  Roll-as Specified Number of Coverages  Allow Mat to Cure or Cool  Broom Loose Aggregate  Apply a Flush Coat  Open to Traffic After Curing Flush Coat.

Sweeping (before and after) Hot Binder Application Aggregate Application Rolling

Construction- Surface Preparation-Existing Pavement Section D Surface Preparation

Construction- Surface Preparation-Existing Pavement Section D Surface Preparation  Cover all exposed facilities before seal coat application.  Reference all covered facilities properly for easy location.  After seal coat application, expose the covered facilities.

Construction- Surface Preparation-Existing Pavement Section D Surface Preparation  Remove all loose and extraneous material by brooming and vacuuming.  Ensure clean, dry surface before applying seal coat.

Construction –Applying asphaltic Emulsion Section F

Section F Applying Emulsion  In confined areas apply the emulsion with a squeegee, rake or other means authorized by the Engineer.  Cover adjacent areas not intended for sealing with suitable material.  At longitudinal joints, emulsion overlap must be dispersed with squeegees before the application of screenings or rakes. Construction –Applying asphaltic Emulsion

Section F Applying Emulsion Construction –Applying asphaltic Emulsion  Align longitudinal seal coat joints with designated traffic lanes. Ensure adequate overlap (4”-8”), as directed by engineer.  Plan emulsion application with lane closure requirements, stop an hour before darkness.

Construction-EMULSION/BINDER Application Section F(3) &(4)

Single Overlap Double Overlap Triple Overlap h Roadway Surface Construction – TYPES of EMULSION Overlap Section F(3) &(4)

Construction – EMULSION Application

Chip Seal Type Application Rate Range (gallons per square yard) Fine Medium Fine Medium Coarse Asphaltic Emulsion or Polymer Modified Asphaltic Emulsion Application (Residual) Rates Section F(3) &(4) APHALTIC EMULSION APPLICATION RATES

Chip Seal Type Application Rate Range (gallons per square yard) Fine Medium Fine Medium Coarse Asphalt (Paint)Binder Application Rates APHALT BINDER APPLICATION RATES

Construction – SCREENED Aggregate Application Section G (1), (2) &(3)

Construction – SCREENED Aggregate Application Section G (1)(2) &(3)

Screened Aggregates SPREAD RATES Chip Seal Type Spread Rate Range (Pounds per square yard) Fine12-20 Medium Fine16-25 Medium20-30 Coarse23-30 Section G (1), (2) &(3)

 No Traffic on emulsioned areas  Uniform spread rates per specifications over entire lane width  Broom Excess screenings.  Aggregate screenings no roll after dropping.  Aggregate screenings should stop when the spreader stops  Do not spread aggregate screenings ≥ 2500’ ahead of completed initial rolling Construction – SCREENED Aggregate Application Section G (1) & (3)

 The application always starts with neat straight edges.  The aggregate spreader follows closely behind the distributor truck (50ft.)  Screened aggregates for Polymer Modified Asphaltic Emulsion application are in a damp condition.  The application looks uniform.  Enough trucks are on hand to keep steady supply of chips.  Check for streaks and gate plug.  Screened aggregate sample is secured from the middle of stockpile or chip machine belt for testing. Construction – SCREENED Aggregate Application –BEST PRACTICES

Construction - Rolling Section H(1)

Construction - Rolling Section H(1)

Construction - Rolling  Correct all ridges, piles, bumps or depressions.  Ensure straight joints, no more than 4” overlap  Longitudinal joints at lane lines  Use pneumatic rollers  Initial rolling with pneumatic roller one coverage  Three coverages of pneumatic roller for final rolling  Broom excess aggregate screenings before opening to traffic Section H(1)

Construction - Curing of Emulsion  Curing time depends on ambient temperature and relative humidity  Emulsion break should begin just after first roller pass  Emulsion curing might take 2 to 6 hours, depending upon asphaltic emulsion type & base asphalt

Construction - Brooming Loose Aggregate Section I Seal Coat Maintenance

 Seal coat surfaces must be maintained for 4 consecutive days from the day screened aggregates are applied.  Remove excess screened aggregates from surface by brooming. Exact brooming time & intervals determined by engineer  Use pilot cars to control traffic.  Schedule placement to ensure end of 1 way traffic control an hour before darkness. Section I Seal Coat Maintenance

Quality CONTROL-CONTRACTOR  Polymer Modified Emulsions  Viscosity (AASHTO T59)  Sieve Test (AASHTO T59)  Demulsibility (AASHTO T59)  Torsional Recovery (California Test 332) Section ID (3)

Quality Quality CONTROL-CONTRACTOR  Screened Aggregates  CT 211, Loss at 100 revolutions ≤ 10% Loss at 500 revolutions ≤ 40%  CT 302, Film Stripping ≤ 25%  C T 227 Cleanliness Value ≥ 80 for Asphaltic Emulsions  C T 227 Cleanliness Value ≥ 86 for PMEs Section ID (3)

Quality Quality CONTROL-CONTRACTOR  Screened Aggregates- CT 202 Gradation-Asphaltic Emulsion Section H (2) Percent Passing Sieve SizeCoarse ½” Max Medium 3/8” Max Med. Fine 5/16” Max Fine ¼” Max ¾” ½” 95– /8 ” 50–8090– No. 4 0–155–3030–6060–85 No. 8 0–50–50–100–150–25 No –50–50–50–50–50–5 No –30–30–3 No –20–20–2 0–20–2

Quality Quality CONTROL-CONTRACTOR  Screened Aggregates- CT 202 Gradation-Polymer Modified Emulsion Section H (3) Percent Passing Sieve SizeCoarse ½” Max Medium 3/8” Max Med. Fine 5/16” Max Fine ¼” Max ¾” ½” 85– /8 ” 0–3085– No. 4 0–50–150–5060–85 No –50–150–25 No –5 No –3 No –2

Quality - Preliminary Responsibilities Quality CONTROL - Preliminary Responsibilities  Project review-Contractor  Alignment, geometrics, shoulders, turnouts  Document review-Joint  Plans & Specifications  Equipment & Material checks-Contractor

Quality Control Inspection (cont.) Quality Control Pre- Application Inspection (cont.)  Weather requirements  Check the local weather conditions for the proposed paving day.  Ensure that the proposed paving operation can be completed, including the emulsion cure within the favorable weather window.  Reschedule paving operations if rain is predicted within the next 48 hours. Section C Unsuitable Day

Control Quality Control Inspection Pre-Application Inspection  Surface preparation  Equipment inspection Asphaltic emulsion distributor Chip spreader Haul trucks Rollers- Adequate number of pneumatic rollers Brooms Section (D) Quality Control

Quality Control Pre- Application Inspection (cont.)  Determining asphaltic emulsion & screened aggregate application rates  Traffic control plan and setup Section F(3) & (4) Application Rates

Quality ASSURANCE - construction Inspection  Asphaltic emulsion application & rates  California Test 339  Screened aggregate application & rates  Vialit (French)Test ≥ 90% Retention  Traffic control & trucking operation  Rolling

Quality ASSURANCE - construction Inspection  Longitudinal joints – ensure no aggregate buildup  Transverse joints – ensure clean joints, start and stop on construction paper  Brooming to ensure absence of loose aggregate

Quality Control /ASSURANCE Post-Application Inspection  Cleanup  Opening to traffic

Thank you