Push ,Pull& Kanban Production Systems

Slides:



Advertisements
Similar presentations
Chapter 15 - Material & Capacity Requirements Planning(MRP/CRP)
Advertisements

CONWIP (A pull alternative to kanban principle)
SISTEM PRODUKSI TEPAT WAKTU (JUST-IN-TIME PRODUCTION SYSTEMS)
Production Planning Devaki Nadkarni Production Planning Annual demand by item and by region Monthly demand for 15 months by product type Monthly demand.
Dependent Inventory: Material Requirements Planning BA 339 Mellie Pullman.
CONWIP Systems CONWIP – Constant work-in-process
1 Session 22 Planning and Scheduling JIT Operations Session 22 Planning and Scheduling JIT Operations John Striebich Copeland Corporation.
MRP and Dependent Inventory Models. Inventory Process stage Demand Type Number & Value Other Raw Material WIP Finished Goods Independent Dependent A Items.
Customer Service in Pull Production Systems Mark L. SPEARMAN Presented By: Ahu SOYLU.
Push and Pull Systems: Lecture 12
POM - J. Galván 1 PRODUCTION AND OPERATIONS MANAGEMENT Ch. 15: Material Requirements Planning (MRP)
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
MRP: MRP: Material Requirements Planning Manufacturing Resource Planning.
Materials Requirements Planning (MRP) Material Requirement Planning (MRP)  MRP determines the number of components and raw material required and their.
ALTERNATIVE METHODOLOGY -KANBAN CMIS-570 Jacob Adams.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 14 Materials and Resource Requirements Planning McGraw-Hill/Irwin.
© 2004 by Prentice Hall, Inc. Upper Saddle River, N.J Operations Management Material Requirements Planning (MRP) & ERP Chapter 14.
Production Planning and Control Introduction
TM 663 Operations Planning October 31, 2011 Paula Jensen
Operations Management Contemporary Concepts and Cases Chapter Sixteen Material Requirements Planning and ERP Copyright © 2011 by The McGraw-Hill Companies,
Material Requirements Planning (MRP) Computer-based information system for ordering and scheduling of dependent-demand inventories, i.e. what is needed,
MATERIAL REQUIREMENT PLANNING
© Wallace J. Hopp, Mark L. Spearman, 1996, Shop Floor Control Even a journey of one thousand li begins with a single.
Introduction to Accounting Information Systems
1 Example: MRP Schedule LocoMopeds is a manufacturer of off-road mopeds. The following product structure diagram represents the bill of materials for.
PowerPoint presentation to accompany Operations Management, 6E (Heizer & Render) © 2001 by Prentice Hall, Inc. Upper Saddle River, N.J Material.
CONWIP (A pull alternative to kanban principle)
Why Kanban Systems Fail and What You Can Do About it
1 CAPACITY PLANNING (Chapter 6) How capacity is measured. p. 221 Capacity utilization = Avg output/Max capacity 221 Capacity planning over ST/MT/LT Factors.
Chapter 16 Inventory Systems for Dependent Demand
Dependent demand lumpy MRP DETAILED SCHEDULE FOR RAW MATERIALS & COMPONENTS USED IN THE END PRODUCTS MASTER SCHEDULE FOR END ITEMS.
Resource Planning OPIM 310-Lecture #7 Instructor: Jose Cruz.
Chapter 12a Resource Requirements Planning: MRP and CRP.
CONWIP (A pull alternative to kanban principle) Main resources : Mark Spearman, David Woodruff and Wallace Hopp Northwestern University, Evanson, Illinois,
© Wallace J. Hopp, Mark L. Spearman, 1996, Material Requirements Planning (MRP) Unlike many other approaches and.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Resource Planning Operations Management Chapter 15 Roberta Russell.
Material Requirements Planning (MRP)
© The Delos Partnership 2007 page 1 Supply Chain Techniques Getting the plan executed.
Production Components Materials Inventory Time & Costs Production Systems.
Production Process Contents: Maintaining bills of material (BOM) Production process.
1 MRP: Based on Dependent Demand u This chapter explores: –Master production schedule –Material Requirements Planning (MRP) »System structure »Example.
1 Lean Office - Pull Kanban, Just in Time, Standardized Work
Material Flow Control, CONWIP and Theory of Constraints 35E00100 Service Operations and Strategy 7 Fall 2015.
Material Requirements Planning. Materials requirements planning (MRP) is a means for determining the number of parts, components, and materials needed.
Lean Software Development (Can Çetin)
CONWIP (A pull alternative to kanban principle)
the JIT concept of production
Operations Fall 2015 Bruce Duggan Providence University College.
Manufacturing Systems Engineering
Basic production algorithms and its main concepts
Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University.
MATERIALS REQUIREMENT PLANNING (MRP) MRP IS A SYSTEM OF PLANNING AND SCHEDULING THE TIME- PHASED MATERIALS REQUIREMENT FOR PRODUCTION OPERATIONS. PROACTIVE.
JUST IN TIME MANUFACTURING ‘The demand driven operation’
Material Requirements Planning
EVOLUTION OF ERP 1960’s - Systems Just for Inventory Control 1970’s - MRP – Material Requirement Planning (Inventory with material planning & procurement)
CH-8-Resource Planning Assist Prof Banu OZKESER December, 2015.
Manufacturing planning & control : Integration of MRP & JIT Prepared by: Ankit P. Sarvaiya (09CAD14)
Enterprise Resources Planning (ERP) Definition 1 Enterprise Resource Planning A method for the effective planning and controlling of ALL these sources.
XII. PERENCANAAN KEBUTUHAN MATERIAL (MATERIAL REQUIREMENT PLANNING)
Push and Pull Production Systems
Facility Inventory Old Facilities Modern Facilities Classroom Size
MRP.
Continuous Improvement”
Kanban Production Just in time Systems
A Pull Planning Framework
برنامه ريزي نيازمندي به مواد
بسم الله الرحمن الرحيم غرفة صناعة عمان معهد إيجابي
Material Requirements Planning and Enterprise Resource Planning.
Presentation transcript:

Push ,Pull& Kanban Production Systems

Klasifikasi pengendalian sistem produksi MRP 1 Push system MRP II ERP JIT SYSTEM Pull system Kanban system Conwip model

Diagram konsep push system

Karakteristik push system Due date driven Release order wip

Sistem order produksi jenis dorong(push)

Start Date = Due Date – Lead Time Filosofi push system Start Date = Due Date – Lead Time Production system Start date Due date Lead time

Urutan operasi Aliran fisik aliran informasi

Teknologi push vs market pull

Push sytem- MRP

Push system – MRP II Demand forecast Agregate planing Demand forecast MPS RCP MRP BOM Inventory status CRP Job pool Job release Routing data Job dispatcing

Diagram konsep pull system

Karakteristik Pull System Rate driven Level WIP throughput

Urutan operasi Upstream downstream

Pull system – JIT (Just In Time) filosofi elemen Building bock produk proses operasi

Just in time scheduled

Finished good inventory

Proporsi waste and value added

JIT-Layout just in time in job shop

Pull system - CONWIP

CONWIP Controller Work Backlog . . . Workstations PC PC PN Quant –— ––––– PC PC . . . Workstations

Push and Pull Schematics CONWIP Stock Point . . . Stock Point Pure Push (MRP) Stock Point . . . Stock Point Pure Pull (Kanban) Stock Point . . . Stock Point … Authorization Signals Full Containers

Using MVA to Evaluate Line Performance Best case Practical worst case (ce(j) = 1) Reduced variability (ce(j) = 0.5) Worst case

CONWIP vs. Pure Push Comparisons Optimum CONWIP Efficiency Robustness Push

Pull system-Kanban

Skematik Kanban

Diagram Alir Kanban

Kanban Board For Service Team

Kanban + Scrum Board For Services Team

Jenis kanban Kanban pengambilan

Kanban perintah produksi

Kanban Penanda

Urutan Berbagai Jenis Kanban

Langkah-Langkah Menggunakan Kanban

Sistem Kanban Pada Supermarket

Interface push pull

Perbandingan sistem dorong dan tarik

Referensi http://en.wikipedia.org/wiki/Kanban http://blog.brodzinski.com/2011/09/pull-push-kanban.html http://en.wikipedia.org/wiki/Push%E2%80%93pull http://www.automationmag.com/images/stories/LWTech-files/73%20Pull%20Kanban.pdf http://pushpull.bg/