© The Delos Partnership 2007 page 1 Supply Chain Techniques Getting the plan executed.

Similar presentations


Presentation on theme: "© The Delos Partnership 2007 page 1 Supply Chain Techniques Getting the plan executed."— Presentation transcript:

1 © The Delos Partnership 2007 page 1 Supply Chain Techniques Getting the plan executed

2 © The Delos Partnership 2007 page 2 Factory – working the plan AND/ OR What do I make next ? Kanban Work To Lists

3 © The Delos Partnership 2007 page 3 Creation of Work to List 12345678 Projected Gross Requirements 10 20 Scheduled Receipts20 Projected Available Balance 30 Planned Order Release Opn No Work Centr e Operatio n SetRun 1045Inspect0.50.10 2055Mix1.00.5 3065Pack1.00.2 Routing Work Centre Information

4 © The Delos Partnership 2007 page 4 WTL and the routing Put Away Set-up & Run Q Move Set-up & Run Q Pick 1 day Dept 10 2 days Dept 30 Opn No DeptWork Centr e Operatio n SetRunSetRunTotal Hrs Total Days 10 45Inspect0.50.10.51010.52 203055Mix1.00.5150517 Product 43768 Lot Size : 100 Calc 2 day7 days Works Order Start Date Works Order Due Date Op Due Date Op Due Date

5 © The Delos Partnership 2007 page 5 Operation Due Dates Job NumberDescriptionWorks Order Due Date Operation Due Date 3458Turn21/511/5 3462Mill19/412/4 3756Turn22/311/3 3893Mill24/512/5 Department 10 – Which job next ?

6 © The Delos Partnership 2007 page 6 CRP and the routing Put Away Set-up & Run Q Move Set-up & Run Q Move Set-up & Run Q Pick 1 day 2 days1 day Dept 30 Dept 20Dept 10 1 day2 days Put Away Set-up & Run Q Move Set-up & Run Q Pick 1 day Dept 10 2 days Dept 30 Product 43768 Lot Size : 100 2 day7 days Product 24575 Lot Size : 200 3 days5 days

7 © The Delos Partnership 2007 page 7 Priorities are set by date Product 24575 – Job 407 Put Away Set-up & Run Q Move Set-up & Run Q Move Set-up & Run Q Pick Put Away Set-up & Run Q Move Set-up & Run Q Pick Product 43678 – Job 403 Order Due Date 27 March Order Start Date 8 March Order Due Date 29 March Order Start Date 2 March Dept 10 Operation Due Date = 13 March Operation Due Date = 14 March

8 © The Delos Partnership 2007 page 8 Operation Due Dates Job NumberDescriptionWorks Order Due Date Operation Due Date 3458Turn21/511/5 3462Mill19/412/4 3756Turn22/311/3 3893Mill24/512/5 Department 10 – Which job next ?Today’s date 15/3

9 © The Delos Partnership 2007 page 9 Work To List Order No.Part No.Descriptio n QuantityOp’n Number Op’n Start Date Op’n Due Date Order Due Date Set up Time Run TimeNext/Prev WC Status 40724575Barrel201010/312/324/510.07.520Q 40343678Cap401009/0313/327/50.02.030R 40947823Cap20 14/316/323/410.08.030S 41132672Top103014/318/321/48.010.060Q Order No.Part No.Descriptio n QuantityOp’n Number Op’n Start Date Op’n Due Date Order Due Date Set up Time Run TimeNext?prev WC Status 42025763Body30 10/313/323/43.05.040R 42534732Barrel20 11/314/322/45.010.020R 43032567Top254013/315/327/42.07.020Q 44047823Cap400514/317/304/045.07.020Q Work Centre Number 10 Description : Turning Date : 12/3 Jobs Currently at Work Centre Jobs Coming to this Work Centre

10 © The Delos Partnership 2007 page 10 Work to List Must show today’s date No past due orders Requires communication Requires Feedback from shop-floor to planner Shows which job to work on next  Operation due date is the priority

11 © The Delos Partnership 2007 page 11 Kanban Means “visible signal” Replaces need for Work to List Replaced by  Card  Empty square  Tennis Ball  Empty package

12 © The Delos Partnership 2007 page 12 Kanban in Operation Operation 10Operation 20

13 © The Delos Partnership 2007 page 13 Kanban Visible instruction to make or move Highlights problems Requires line balance Requires Andon – traffic light operation Operator responsible for own quality Must not pass on known defects Small batch quantity required

14 © The Delos Partnership 2007 page 14 Kanban Works to keep the “Kanban” full When full must stop Do not build extra Result is  less WIP  Improved Quality  Shorter Lead times

15 © The Delos Partnership 2007 page 15 Kanban vs WTL Visible feedback Signal driven not date driven  Both require feedback  Good Quality helps both  Problem solving tools should support both  WTL needs MRP and CRP; Kanban needs SOP and RCCP

16 © The Delos Partnership 2007 page 16 Creation of Vendor Schedule 12345678 Projected Gross Requirements 10 20 Scheduled Receipts20 Projected Available Balance 30 Planned Order Release Supplier Schedule Part Number : 14356 D escription : Red Pen Line Part Number DescriptionQtyScrap PerFactor 1043768Pen Barrel10.0 2076452Finished Nib10.0 3089563Cap10.0 Bills of Material Planning Data Lead Times Order Quantities Safety Stock

17 © The Delos Partnership 2007 page 17 Vendor Schedule Part No. 1/78/715/722/729/75/812/819/826/8SeptOct12 m Tota l 2346720 80 960 2456610 3060 1040 354673570 35 140 1680 1437620 40 1601801920 2543610 4080620 Supplier : ACME Grinding Equipment Limited OrdersPay for materialsVisibility Orders :PartQtyDue 14532623467201/7

18 © The Delos Partnership 2007 page 18 Vendor Scheduler Manages Exception messages Reviews and manages performance Operates MRP for their items Releases vendor schedule Point of contact for suppliers

19 © The Delos Partnership 2007 page 19 Discussion Areas Fast Tech Score Cards Forecasts Dell Value Chain

20 © The Delos Partnership 2007 page 20 Supplier Community Web Site View and Download Build Sequence

21 © The Delos Partnership 2007 page 21 Supplier Community Web Site View and Download Contract Orders

22 © The Delos Partnership 2007 page 22 Vendor Scheduling Vendor Scheduling Customer Supplier Buying and Scheduling Buying Short/ Medium Term Short/ Medium Term Long Term Long Term

23 © The Delos Partnership 2007 page 23 Execution - Prerequisites In order for Manufacturing and suppliers to achieve the schedule we need  A Valid plan, balanced with respect to capacity and materials  Correct planning data  Effective Demand Management  Proper Time Fence Policies  Accurate planning data  A commitment to the schedule  Communication when things are wrong [ADR = Advise of Delay Report]  All dates in the system in the future for unreleased planned orders, and due dates in the future for released orders  A supporting framework of Integrated Enterprise Leadership