US85-MODIFICATION CHARPENTE A.TURSUN – AVRIL 2003 NIVEAU 1 - LEP US85-MODIFICATION CHARPENTE A.TURSUN – AVRIL 2003 NIVEAU 1 - LEP.

Slides:



Advertisements
Similar presentations
La fin du monde. Évolution des températures minimales et maximales.
Advertisements

Primary French PowerPoints When’s Your Birthday?.
French Games By Frankie Taylor. 1 Un 2 Duex Games Toris Quatre Cinq.
French Quiz!! Deux Un Bonjour! Quatre Trois.
BPI France - Maisons-Alfort Luc-Michel Demey Demey ® Consulting Guide MQ du 7 Avril 2014.
MY KISS THE SKY (Amels 52m) Avril MY KISS THE SKY (Amels 52m) Avril 2007.
Magali Pauzié Magali Pauzié $1,000 $2,500 $5,000 $10,000 $25,000 $50,000 $75,000 $150,000 $1,000.
What are we going to learn in this session ?
French for Non Francophones Program. Meet the teachers Meet the staff Where is what Useful info : ex. UQAM Student Card How to enrol in classes online.
A NESTED OCEAN MODEL FOR THE SICILY STRAIT WITH ZOOMING ON TUNISIA COASTAL AREAS Ali Harzallah
Digital mock-up web. LHC DIGITAL MOCK_UP Lien actif.
Handy Time Vocab 3 - Months and Seasons With Miss Digitally Angry Clock-Face.
French! Let’s learn !.
There are 12 months in one year
Avril 2007 Pierre Bailly LMD Application at UPMF.
Main Connectives The main connective of a sentence is the connective outside of any parentheses.
Journal de bord
Il est 08:18 h. 21 avril 2015 HELP Temps: 2:18 min.
1 Which 2 months are named after Roman gods?. janvier février mars avril mai juin juillet août septembre octobre novembre décembre.
Le Cercle Français Le 26 avril 2011 Le Cercle Français 26 avril
Les Jours et les Mois Aujourd’hui c’est mardi le cinq janvier 2010 (deux-mils-dix)
Figure 19: Plot and frequency analysis for modifications to Skogestad’s settings for G 1 (s). (setpoint step = 1, disturbance step = 1)
1 janvier 2 février 3 mars 4 avril 5 mai 6 juin 7 juillet 8 août 9 septembre 10 octobre 11 novembre 12 décembre.
Notes le septembre La politesse (Expressions of Courtesy) S’il vous plaît = Please (formal) S’il te plaît = Please (informal) Merci = Thank you Je.
France’s Seasons And It’s Festivals Tabitha Dowding.
Figure 1. SAT-9 Reading Percentile Scores from Sample Schools with Mostly Native English-Speaking Students (
Higgs Physics with ATLAS Arno Straessner Journée de réflexion du DPNC 14 septembre 2007.
ESL K-12 PLC April 17, Today’s Agenda ESL Allotment formula LEP retentions Engagement/measuring progress Measuring ESL teacher effectiveness.
Le Date Grammar Entry #3 Writing the date in French.
ST Technical Committee 15th October LHC Ventilation Control System migration D. Blanc ST-CV.
THE MOST BEAUTIFUL FLAG OF ALL A MAP OF THE US.
prediction-of-higgs-boson.
LE PROJET TANGENT Base documentaire n°1, Présentation Chronologique Photographies, dessins, commentaires, articles, informations
Work to Date Analysis Work –Random Vibration Analysis of RICH2 Structure PSD data from LEP Tunnel (Including affect of large ventilation system) Excitations.
L’histoire de France Unite 6. King Louis IX: Saint Louis (25 Avril 1214 – 25 Août 1270 King from
Vacuum studies at LAL Bruno Mercier, Christophe Prevost Alexandre Gonnin, Christian Bourgeois, Dirk Zerwas R.P. ILD MDI Meeting 24/3/15.
LUNDIMARDIMERCREDIJEUDIVENDREDISAMEDIDIMANCHEDIMANCHE SEPTEMBRE 2013.
Internal review of superconductor and magnet laboratories1 Status of LHC-TB Power Converters Hugues Thiesen TE-EPC.
May 26 th 2005 Development and Management of the Installation Drawings for the LHC Machine Samy Chemli, Jean-Pierre Corso, Yvon Muttoni TS-IC.
The program today will be about the 3 main areas of physics in Jim’s career at the University of Chicago - The muon pair experiments at Fermilab - The.
QUELLE EST LA DATE DE TON ANNIVERSAIRE?
D. Valuch, N. Schwerg, O. Brunner (CERN)
ConstraintsSolution ConsequencesOpportunities RE-TENDERING OF ST-CV MAINTENANCE CONTRACT Michele Battistin - CERN - ST/CV Group Workload Budget Lump-sum.
NJASK Science grades 4 & 8 and NJBCT Tia Burnett Supervisor of Testing September 2015 (revised 10/2015)
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
Modifications assembly zone CRAB Cavity SM18 View assembly zone with Cavitys LHC cryomodule/string CRAB + gantry/cryomodule SPL (plan: LHCACFGA_T0036)
1 INTERNATIONAL MASTERCLASSES HANDS ON PARTICLE PHYSICS Despina Hatzifotiadou INFN Bologna, Centro Fermi-Rome and CERN Puebla
Learning objectives Le calendrier Year 4 children are now able to:
Notes le 3 mai Les dates en français.
Le jour et la date The day and the date.
Henri Toulouse-Lautrec
GEOMETRY CREATION METHODOLOGIES FOR LHC POINT 4
Notes on Ramp-Up and Production
CERN The world’s largest Particle Physics Research Center in Geneva
ورشة بعنوان استراتيجيات تعديل السلوك بين النظرية والتطبيق
Bon anniversaire Pg. 12 Lundi, le vingt et un septembre
وحماية البرمجيات وقواعد البيانات
أيام تكوينية حول الإعلام و دوره في تعزيز قيم المواطنة الناظور 23 و 24 و 25 و 26 نونبر 2010 مبادئ إستعمال الأدوات الإعلامية البصرية في التدوين الروبورتاج.
استراتيجيات تعديل السلوك بين النظرية والتطبيق
Quelle est la date aujourd’hui?
البـــدانـــــة و علاجها
Figure 19: Plot and frequency analysis for modifications to Skogestad’s settings for G1(s). (setpoint step = 1, disturbance step = 1)
Figure 1. SAT-9 reading scores for Oceanside and Statewide for 1998 thru Blue lines represent data for all students; red lines represent data for.
Quelle est la date aujourd’hui?
Figure 1. SAT-9 reading scores for Oceanside and Statewide for 1998 thru Blue lines represent data for all students; red lines represent data for.
What do ESL Teachers do? Snowball Activity
Frank Linde, Philips meets particle physics, 31 January 2012
A more complex example: (L&E)>P | L>P
SEPTEMBRE 2017 September 2017 lundi monday mardi tuesday mercredi
Presentation transcript:

US85-MODIFICATION CHARPENTE A.TURSUN – AVRIL 2003 NIVEAU 1 - LEP US85-MODIFICATION CHARPENTE A.TURSUN – AVRIL 2003 NIVEAU 1 - LEP

US85-MODIFICATION CHARPENTE A.TURSUN – AVRIL 2003 NIVEAU 1 - LEP US85-MODIFICATION CHARPENTE A.TURSUN – AVRIL 2003 NIVEAU 1 - LEP

US85-MODIFICATION CHARPENTE A.TURSUN – AVRIL 2003 NIVEAU 1 - LHC US85-MODIFICATION CHARPENTE A.TURSUN – AVRIL 2003 NIVEAU 1 - LHC

US85-MODIFICATION CHARPENTE A.TURSUN – AVRIL 2003 NIVEAU 1 - LHC US85-MODIFICATION CHARPENTE A.TURSUN – AVRIL 2003 NIVEAU 1 - LHC

US85-MODIFICATION CHARPENTE A.TURSUN – AVRIL 2003 NIVEAU 2 - LEP

US85-MODIFICATION CHARPENTE A.TURSUN – AVRIL 2003 NIVEAU 2 - LEP

US85-MODIFICATION CHARPENTE A.TURSUN – AVRIL 2003 NIVEAU 2 - LHC US85-MODIFICATION CHARPENTE A.TURSUN – AVRIL 2003 NIVEAU 2 - LHC US85-MODIFICATION CHARPENTE A.TURSUN – AVRIL 2003

US85-MODIFICATION CHARPENTE A.TURSUN – AVRIL 2003 NIVEAU 2 - LHC US85-MODIFICATION CHARPENTE A.TURSUN – AVRIL 2003 NIVEAU 2 - LHC

US85-MODIFICATION CHARPENTE A.TURSUN – AVRIL 2003 NIVEAU 3 - LEP

US85-MODIFICATION CHARPENTE NIVEAU 3 - LEP A.TURSUN – AVRIL 2003

US85-MODIFICATION CHARPENTE A.TURSUN – SEPTEMBRE 2003 NIVEAU 3 - LHC

US85-MODIFICATION CHARPENTE A.TURSUN – SEPTEMBRE 2003 NIVEAU 3 - LHC